SMARTS Training definitions CGP transition plan Pilot project discussion SMARTS Manual review 1.

Slides:



Advertisements
Similar presentations
Jamie Petersen Administrative Assistant - Stormwater Front Desk: (402) Michael Crisco Program Specialist – Storm.
Advertisements

GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
CALIFORNIA ENVIRONMENTAL REPORTING SYSTEM TRAINING FOR BUSINESSES Contra Costa County Hazardous Materials Programs.
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
What is NPDES? “National Pollutant Discharge Elimination System”
Water Quality Control Division
SMARTS Storm Water Multiple Application and Report Tracking System.
56TH ANNUAL WATER AND WASTEWATER OPERATORS' CONFERENCE April 17, 2013 NetDMR Update Shawn Hokanson SWPB Permit Support Supervisor Cheryl Edwards SWPB NetDMR.
Page 1 of 21 This module will describe the procedure for a Metis Bid Request and how to upload the Metis supporting documentation. Welcome To the ETS –
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
CEO’s Report 2012 State Board of Directors Meeting January 27, 2012.
Overview of RIPDES Construction General Permit Requirements Developed by: Greg Goblick, Laura Stephenson RI Department of Environmental Management RIPDES.
What is it and what can it do for me?
Page 1 of 29 To the OASIS Roles Online Training Course Each company has an assigned ETS Site Administrator who is responsible to create their company's.
California Integrated Water Quality System (CIWQS) and Electronic Self Monitoring Reports (eSMR) Presentation to California Dischargers.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Registration: Appellee Representatives. Roles & Responsibilities  Fill out System Access Form (SAD) available at (prior to the Commission.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
NPDES Electronic Reporting: Notices of Intent and Discharge Monitoring Reports Moderator: Andy Battin, U.S. EPA Presented by: John Dombrowski, U.S. EPA.
Module 7: Construction Phase
SWIS Digital Inspections Project (SWIS DIP) Chris Allen, Information Management Branch California Integrated Waste Management Board November 5, 2008 The.
EDMR Electronic data submittal system Jeffrey A. Ewick, Section Chief Data and Information Services Section Electronic Discharge Monitoring Report.
Introduction to Construction General Permit Inspections.
Municipal Regional Permit Provision C.6 Dan Cloak, P.E. Principal Dan Cloak Environmental Consulting.
Planning Grant Workshops August 30, 31 September 1, 2 Department of Water Resources.
Introduction to Construction General Permit Inspections Pre-Inspection Preparation.
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
MS4/sMS4 Annual Report Development Thea Lomax Presenter Storm Water Enforcement Thea Lomax Presenter Storm Water Enforcement Prepared 07/04/2011.
Construction Site Best Management Practices and the Project Design Process.
State Water Resources Control Board Division of Water Quality Industrial/Construction Storm Water Unit.
Revised 12/27/13 Supplier/Vendor Instruction Manual Presented by Department of General Services, Procurement Division Office of Small Business & DVBE Services.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
Presented to Georgia Airports Association Conference October 21, 2009 EPA Spill Prevention Control and Countermeasures – Update Also – What’s Coming with.
Electronic Reporting: Notices of Intent and Discharge Monitoring Reports Moderator: Andy Battin, U.S. EPA Presented by: John Dombrowski, U.S. EPA Alison.
VI. Developing a VSMP Program General Stormwater Training Workshop.
APPLICATIONS OF WATER QUALITY REGULATIONS Module 22, part c – Applications.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
1 AARP Tax-Aide Prospective Volunteer Recruitment System Leadership Reports and VMIS Functionality 11/4/09.
Test Your Storm Water Knowledge!
Introduction to NPDES Permits Introduction to NPDES Permits NPDES = National Pollutant Discharge Elimination System. Permit system required by Section.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
Lisa Haney Senior Environmental Specialist and Storm Water Compliance Program Manager Orange County Sanitation District Lisa Haney Senior Environmental.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Updated eNOI System - Screen Shots Registration Additional Help Text CGP NOI LEW.
Electronic – Statutory Financial Return (E-SFR) Timae Flood Bermuda Monetary Authority.
Hampden Township Stormwater Management Program
NPDES e-Reporting Tool - NeT Training
San Diego County Public Works –
MSGP Annual Report The Annual Report consists of:
NetDMR.
To the ETS – Metis Bid Request Online Training Course
Partner Smart Assist Service
The new sf bay area municipal regional permit (mrp 2.0)
Regulatory Perspective Statewide Construction General Permit
MSGP Annual Report Refresher Due January 30th
2018 Stormwater Construction General Permit (CGP) Renewal TXR150000
To the ETS – Encumbrance Online Training Course
Ohio EPA, Division of Surface Water
Community Development Department
To the ETS – Metis Bid Request Online Training Course
Flow chart to determine whether coverage is required
NetDMR.
Iowa Statewide Assessment of Student Progress
To the ETS – Encumbrance Online Training Course
TPDES Construction General Permit Compliance
Multi-Sector General Permit: MSGP
Pre-Submittal Meeting As Needed Environmental Services RFQ
Stormwater Construction General Pemit (CGP) TXR150000
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

SMARTS Training definitions CGP transition plan Pilot project discussion SMARTS Manual review 1

SMARTS Training Agenda 9:00 – 9:05 Introductions 9:05 – 9:15 Who is my audience 9:15 – 9:20 Where to find information 9:20-10:30 Presentation 10:30-10:45 Break 10:45 – 11:30 Questions and Answers 2

definitions CGP SMARTS Manual Appendix A -Acronyms Includes PRDs Risk Level Determination Legally Responsible Person Common plan of development Qualified SWPPP Developer (QSD) Waste Discharge Identification # SMARTS Ad Hoc Reporting Organization ID User ID Application ID 3

State Water Board’s Storm Water Multi Application System (SMARTS) Electronic file (e-file) permit compliance documents Documents called Permit Registration Documents (PRDs) Internet based platform Self-reporting system Not only Caltrans projects, other CGP projects and industrial permit projects Transition from paper based compliance documents 4

Who is my audience and Where to find information LRP Table 7/14/2011 August 17, 2011 CGP Webinar NPDES/MS4 Permit information Windows media player of this slide show SMARTS Manual Questions and Answers 5

Construction General Permit Transition Plan (CGP)-SMARTS Process Memo from Malcolm Daugherty, Fall 2010 Existing paper based regulatory process converting to electronic submittals Affects District Directors, Resident Engineer, Division of Environmental Analysis, Construction Division Self-reporting for permit compliance / 6

State Board’s New CGP Requirements for Caltrans All projects will continue to be covered by the current Caltrans MS4 permit at least until the Caltrans MS4 permit is reissued approx Dec 2011 Submitting Notices of Construction (NOCs) to the Regional Boards is still in effect Electronic filing of PRDs is not currently required Caltrans’ construction contract administration must be in compliance with the CGP – Construction Procedure Directives 10-4 and 10-9, 11-2 implemented 7

Old Process for Obtaining Coverage under CGP District NPDES Coordinator Files Notification of Construction (NOC) with Water Board 30 days prior to beginning of Construction Resident Engineer reviews and certifies - Contractor’s Storm Water Pollution Prevention Plans (SWPPP) District NPDES Coordinator Files Notification of Completion of Construction (NOCC) Contract Award 8

Basic Plan LRP to establish user accounts in SMARTS Construction Assigned Signatories review, certify and upload the following documents on to SMARTS - Contractor’s (SWPPP) Ad Hoc (Monitoring Reports) Storm Water Annual Report Notice of Termination (NOT) Contract Award State Board’s Construction Database - SMARTS LRP to delegate authority to Backup LRPs and/or Assigned Signatories to file PRDS. PE or Environmental Water Quality Assigned Signatories uploads PRDs onto SMARTS: Notice of Intent (NOI) Site Maps Risk Level Determination 9

On going Construction Contracts Plan LRP to establish user accounts in SMARTS Construction Assigned Signatories, RE uploads PRDs onto SMARTS: Site Maps Risk Assessment Contractor’s (SWPPP) Monitoring Reports certify State Board’s Construction Database - SMARTS LRP to delegate authority to Backup LRPs and/or Assigned Signatories to file PRDS. 10

State Water Board’s Storm Water Multi Application System (SMARTS) Electronic file (e-file) permit compliance documents Documents called Permit Registration Documents (PRDs) Internet based platform Self-reporting system Not only Caltrans projects, industrial permits Transition from paper based compliance documents 11

Schedule Now Hard start date January 1,

Roles LRP, one Backup LRP; up to three Assigned signatory; no limit Data Submitter; no limit District Director Deputy Directors, NPDES Coordinator Resident Engineer, Construction Storm water Coordinator, District NPDES Coordinator Inspector QSD QSP 13

SMARTS Steps Step 1 : Establish SMARTS User Accounts, Create Organization ID, Link Step 2: NOI Submittal and Certification: Enter project specific into SMARTS electronic system Step 3 Continuous or Ad Hoc Reporting Step 4: Annual Reports Step 5: Closeout, NOT Step 6 : Erosivity Waiver 14

SMARTS Manual To assist RE in compliance Describe steps where data comes from Screen shots Total SMARTS for GCP has six steps As of September 8, 2011 Manual address first four steps Establish User accounts, Create Organization ID and Link NOI submittal and Certification Continuous or Ad Hoc Reporting Annual report 15

Steps Step 1 Establish SMARTS User Accounts, Create Organization ID and Link Step 2: NOI Submittal and Certification Step 3 Continuous or Ad Hoc Reporting Step 4 Annual Report 16

Permit Registration Documents Defined in CGP are Notice of Intent (NOI) Risk Level Determination Site Maps and Storm Water Pollution Prevention Plan. The subtlety is that in SMARTS, the NOI PRD is really the process of providing and entering data, uploading attachments using NOI entry tabs and certification 17

Construction General Permit Before July 1, 2010 and currently for some projects, Caltrans uses hard paper Notice of Construction.(NOC) Now, SMARTS requires Notice of Intent (NOI) due seven days before construction begins. 18

PRDs The new PRD is the Risk Level Determination. Risk Level Determination is done in the SWDR process Caltrans ongoing construction projects should seek assistance from PE or Water Quality staff 19

SMARTS Necessary information for SMARTS 1) name and telephone number for WPC manager, 2) address for the RE and 3) name of Qualified SWPPP Developer. 20

SMARTS The PRD called “SWPPP “ is created by the contractor and submitted for approval by the RE. Once this report is approved by Caltrans, it can be uploaded into SMARTS as an pdf attachment. Pdf attachment file size limit of 75 MB. If any report is larger, the document must be split into pieces of 75MB each and uploaded as a group (1/2, 2/2). The actual certification by the RE is done after the SWPPP is attached in the attachments tab Certification is part of NOI tabs. 21

Steps Open SMARTS Manual Step 1 User registration, Link page 6 Step 2 NOI page 15 Step 3 Continuous or Ad Hoc page 32 Step 4 Annual Report page 39 22

Lessons Learned Start early Plan resources for pdf’ing Get what you can and fill in the blanks as you go Start at the top DD time is minimal All Users will have their own comfort level with system and change 23

Resources Construction Division Construction Division Division of Environmental Analysis SWRCB ms/stormwater/ 24

Questions Joyce Brenner, Chief Water Quality Robert Effinger, Chief Environmental Compliance and Training Tim Sobelman Chief Design - Stormwater Hamid Hakim, Construction Storm water Coordinator Sarah Picker – Environmental Compliance and Training or

26

27