Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.

Slides:



Advertisements
Similar presentations
XMM EPIC MOS Jenny Carter 4 th EPIC BG WG Meeting Mallorca, 25/10/06 BGWG blank sky data analysis Jenny Carter, University of Leicester.
Advertisements

Bruno Altieri EPIC Calibration meeting, Feb. 1-3, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM EPIC MOS Andy Read 2 nd EPIC BG WG Meeting MPE, Germany 24/11/05-25/11/05.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
Experience with combined Fe55/Vela SNR calibration - MOS Andrea Tiengo INAF, IASF-Milano In collaboration with: Mariachiara Rossetti (IASF-Milano) Martin.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Marcus G. F. Kirsch Mallorca, Summary status of the EPIC calibration.
EPIC Calibration Meeting, MPE K. Dennerl, 2006 May 04 EPIC pn at low energies: LW mode Properties of EPIC pn at low energies: LW mode.
XMM-Newton Status of EPIC Operations Guillermo Buenadicha & Pedro Calderón Mallorca 8-April-2008.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton MOS Timing Mode calibration Marcus.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Calibration of the EPIC MOS Timing.
XMM-Newton 1SCI-SA Populating the CCF Immediate needs are driven by the requirement to test the SAS over the summer before public release. (A release called.
EPIC Calibration Meeting, K. Dennerl Saclay/France, 2003 Sept offset map correction Spatial variation of the energy scale Energy correction for pixels.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC A time jump analysis on EPIC-pn with some side results Marcus G. F. Kirsch M.J.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Results from the EPIC- Calibration-Workshop.
Images script M. Ehle & Rosemary Willatt (ESAC) April 2007.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 EPIC pn: Jumps in the energy scale Sudden jumps in the absolute energy scale and their origin.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton XMM Newton cross calibration M.G.F.
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
I. de la Calle Astronomy Science Operations Division Science Operations Department Background Working Group Meeting, Mallorca – 30/03/2009 XMM-Newton ESAC.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Status of EPIC time jump problems Marcus.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
Marcus Kirsch Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton EPIC Cross calibration PKS
Slews: Fast and Slow. Fast Slew Status  XMMSL1: catalogue of slew sources released May 2006 Revs , 5180 detections, 2692 Revs , 5180 detections,
EPIC Calibration Meeting, ESAC K. Dennerl, 2005 October 04 Adjustment of spatial gain variations Adjustment of spatial gain variations of EPIC pn.
EPIC Calibration Meeting, Mallorca K. Dennerl, 2006 October 26 Suppression of the low-energy noise Suppression of the low-energy noise: an improved approach.
XMM EPIC MOS Jenny Carter 3 rd EPIC BG WG Meeting MPE, Germany 02/05/06 Blank sky data analysis Jenny Carter, University of Leicester.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Martin Stuhlinger Mallorca, European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with SASv7.1 CAL Meeting.
Tony Abbey XMM Cal/Ops meeting – MPE, Garching – 5 May 2006 Tony Abbey – University of Leicester Reducing MOS data rate.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
EPIC Calibration Meeting, K. Dennerl VILSPA/Spain, 2004 March Detector noise & Vela observations application to Vela observations EPIC pn detector.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Correct treatment of fast mode ARFs Marcus G. F. Kirsch, G. Schoenherr, E. Kendziorra,
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Energy calibration refinement of the EPIC-pn Burst mode M.G.F. Kirsch 1, E.
1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton Ops. AGENDA Operations status and.
Martin Stuhlinger X-Ray Universe 2005, Sep.26-30, 2005 European Space Astronomy Centre Page 1 XMM-Newton ESAC Status of XMM-Newton cross-calibration with.
Column rejection in the MOS  The core of soft sources is removed by the standard emchain.  Due to very large fluctuations in count rate from one column.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM EPIC MOS Steve Sembay EPIC Calibration Meeting Ringberg 2-5/April/2002 Broad-Band MOS v PN Cross-Calibration Study •8 Observations.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
XMM EPIC MOS Andy Read EPIC CAL/OPS Meeting MPE, Germany 04-05/05/06 EPIC BGWG XMM-Newton EPIC BackGround Working Group founded (~1.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
Bit flips in the MOS offset tables  First detected in 0640_ MOS 1, CCD 6 by M. Ceballos in routine screening. RAWY=303 had its offset increased.
Astronomical GRID Applications at ESAC Science Archives and Computer Engineering Unit Science Operations Department ESA/ESAC.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
EPIC Calibration Meeting, Mallorca Origin of gain offsets K. Dennerl, 2008 April 8 Origin of gain offsets: new insights from eROSITA calibration Mallorca,
NASSP Masters 5003F - Computational Astronomy Lecture 19 EPIC background Event lists and selection The RGA Calibration quantities Exposure calculations.
PHYS 20 LESSONS: INTRO Lesson 1: Intro to CH Physics Measurement.
RAS National Astronomy Meeting April 2006, University of Leicester, UK The XMM-Newton Slew Survey The excellent sensitivity of the XMM-Newton.
SPIE, San Diego, CA - 1 August 2005 Bruno Altieri, XMM-Newton European Space Astronomy Centre Page 1 The XMM-Newton Slew Survey: processing challenges.
SAG+SASWG Meeting Potsdam /15 PN Tasks – Status Report (update since Leicester) Hermann Brunner - MPE  epframes:  The dark quadrant problem.
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
M. Pilar Esquej, XMM-Newton European Space Astronomy Centre Page 1 Status of the XMM-Newton Slew Survey P. Esquej, R. Saxton, B. Altieri, A. Read, M. Freyberg,
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Status of the EPIC calibration Presentation for XMM Newton UG 18 May 2006 Marcus.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
CREDO Reference
EPIC Calibration & Operations Meeting
Presentation transcript:

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 2 EPIC ESAC Situation now Any kind of strange instrument behaviour is reported by the INSCONS to the IDT Book keeping in minutes Sending information to PI via mail. The mean values of the PN Q2 offset maps show a marked increase of 4-5 ADU since rev 604. The Q0 CCDs show a smaller increase in mean offset value of 2-3 ADU. In the Q1 and Q3 CCDs one can see a decrease of 1-2 ADU in the same period. This is reminiscent of the post Q2 current anomaly behaviour (September 2001, rev 325). Investigation of the Q2 current F1191 performed by Stephanie shows there is clearly a period between revolution 604 and revolution 609 where the current showed an increase of about 15 mA (from 310 mA to 325 mA). The Q2 current went back to its nominal value (~310 mA) in revolution 610. Investigation of post rev 609 offset maps underway. Problem is also under investigation at MPE / Tuebingen. (MS) to be followed up with MPE by MS. Also under investigation (triggered by MPE) the increased common mode variation seen in some PN offset maps. It seems to occur only in FF and mostly at the first observation of a revolution. A cause could be the enhanced radiation affecting these offsets, although the mechanism which would cause an increase in CM variation is not yet explained. There is not expected to be any impact on science quality as CM variations are corrected for by the on-board event median correction. (MS) to be followed up with MPE by MS. MOS2 SW background/noise gradient (BA) MOS2 SW exposure (Obsid: 0644_ ) There is a factor 2 in background level between the `left' and the `right'. low-energy pat0 only electronic noise. It looks like the old problem of the MOS timing fixed-offset problems. It's a one-off problem. Apparently this "noise" is removed efficiently by the SAS (to be checked), so virtually no impact on science data, but still it's puzzling why only this SW exposure was affected... I'll keep that in the back of my mind. (BA) - screened the last 50 revs and the "feature" is still there apparently randomly in ~20-30% of the exposures but a rather low level. I haven't seen extreme example as in the past (see attached) and the occurrence rate seems also to go down, so could it cure by itself. To me this is just another type of unpredictable electronic noise, vetoed efficiently by the SAS anyway (negative E3), so not a big deal. It affects only MOS2 in SW. (BA). On-going investigations on the MOS corrupted offsets, more occurrences have been found in the past. (BA). curious case of pn offset map loading: GD153 (WD) not optical loading nor x-ray loading; possibly UV loading? (MS). PN diagonal structures for low energies. Happen to be perhaps at every first observation per rev. only in FF Mode. Could be a resonance or interference effect. Under Investigation in collaboration with MPE (MK) some more analysis of pn noisy offsets: low E diagonal pattern in events image related to enhanced noise in pn offset maps (MS). investigations on MOS2 CCD5 low energy count rates (MST) - identify the effectivity of detection algorithm for MOS2 CCD5 problem. - investigations on MOS2 CCD5 ODF archive stopped due to processing time. Will be restarted when PPS is finished. - search for correlations and triggers for MOS2 CCD5 problem.

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 3 EPIC ESACXIAT WEB-Device for recording, measuring, or controlling deviation or departure from the normal or common order, form, or rule Instrument Anomalies (XIA's) are entered by SOC members (or external experts that have access to the internal pages) Any associated documents may be uploaded Comments, remarks, additions, corrections or further uploads may be added to the XIA at any time thereafter. The system functions in a similar manner to a newsgroup or forum, where a subject may be added to at any time.

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 4 EPIC ESACXIAT View open View openView open View all New entry New entryNew entry search search home

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 5 EPIC ESACview View open View openView open View all New entry New entryNew entry search search home

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 6 EPIC ESAC Example entry back to view

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 7 EPIC ESAC Example uploaded file You can upload : images,.ps files etc back to view

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 8 EPIC ESAC New XIA View open View openView open View all New entry New entryNew entry search search home

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 9 EPIC ESACsearch View open View openView open View all New entry New entryNew entry search search home

Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 10 EPIC ESAC Cross-Calibration tool The same tool will be available to discuss cross calibration results Slight modification needed to adjust to cross-cal needs Comments are welcome …