Goal of the week: Stable beams with bunch trains … not quite achieved ! 1 OP summary of week 37 M. Lamont & J. Wenninger.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress week 19 Monday 11 th May 2015 Coordination: Jan Uythoven, Massimo Giavannozzi, Mike Lamont.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Friday, h10: Stable beams at 1.38 TeV. 09h03: Beam dump.  One bunch dropped too much in intensity and gave BPMS interlock (dump protection). 10h36:
Day ● 09:00-14:00: Collimation setup 3.5 TeV – Slowed down by losses induced by tune hump. – 48 collimators set up. – Beam dumped by ATLAS during.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
● Morning: – Squeeze and collide. – Smooth, orbit rather well under control (max. excursion ~ 0.2 mm at TCT, roughly sigma). Orbit evolution at the.
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Weekly summary Summary Week /19.07 M. Lamont & J. Wenninger for the OP team and for all colleagues from the various groups 8:30 meeting 1.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Plan for start-up with beam Friday  19:00 Machine closed. Ramp for powering tests & pre-cycle  22:00 Pilots through nominal cycle up to collisions. Measure.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
LHC 8:30 meetingEBH 11 Thursday 24 November 2011.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
:00 meetingEBH 11 Saturday :00 meetingEBH 2  7:58 Fill 2483 (264 bunches) dumped by reference orbit set to zero in.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Saturday 24 March 2012.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Machine availability reaching well over 80%
Tuesday TOTEM and transverse loss map (1) OK
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC commissioning Week 38
Lost at 12:05 to power converter (RTQX2.R1) problem
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Tuesday morning 08:30-09:00 Squeeze with probe.
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Monday :15 fill 3523 dumped by BPMs IP6
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Wednesday 23/2 Thanks CRYO!!!.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
RAMP FOR COLLIMATOR SETUP
Wednesday morning / afternoon
Daniel, Gianluca and Belen (for the Collimator team)
Presentation transcript:

Goal of the week: Stable beams with bunch trains … not quite achieved ! 1 OP summary of week 37 M. Lamont & J. Wenninger

Cycle configuration Machine configuration for operation with bunch trains.  Crossing angles of 170 microrad in all IRs at injection, constant through the ramp.  The crossing angles are reduced to 100 microrad (IR1,5,8) and 110 microrad (IR2) in the first 110 seconds of the squeeze – almost no  * change (IR2 at 9.8 m).  The ramp has been extended by ~5 minutes to be able to feed-forward decay of Q and Q’ (not done yet). Tune and chromaticity changes in the ramp and squeeze have not been fed-forward.  One attempt of FF on the ramp (Q’) failed on Friday – rolled back.

Beta-beat at 3.5 TeV Beta-beat 10% in collision

Orbit Reference orbit established (after many iterations).  One orbit at injection, kept until crossing angle reduction.  One orbit after crossing angle reduction, beams separated.  One orbit for collisions (with lumi scan settings).  The 3 orbits differ in IR1/2/5/8. Everywhere else the difference is kept as small as possible (better than 100 microns rms). Orbit feedback on from start ramp to end of the squeeze.  Operates with injection orbit reference up to flat top.  Before start of squeeze: o Disable BPMs in crossing bump. o Set new reference with reduced crossing angles.  After 110 seconds in squeeze, re-enable BPMs in crossing bump.  Feed-forward of real-time trims was done systematically – corrections are very small.  The last few cycles have been nicely reproducible.

Orbit in the squeeze Orbit change 3.5 m versus point at 110 s (Xing reduced) ~50  m rms Some ‘structures’ in IR2, 5 and 8 (cannot be improved without common correctors – MCBX)

Some transients During the ramping down of the Xing, the OFB introduces small structures in the IRs where the BPMs are masked out (pink) due to missing constraints. They disappear as soon as the BPMs are re-enabled.

Beam positions at TCTV 7 m  3.5 m 8:30 meeting 7 Beam position at TCTs stable to 0.1 mm during squeeze

Collimation – a lot of work !!! TCTs were aligned at 3.5 TeV:  Crossing angle 170 microrad.  Crossing angle 100/110 microrad (point 110 sec).  Collisions. Off-momentum (IR3) collimators for B2 were re-aligned. TCSGs in IR6 were checked.  B1 TCSG centre was corrected by 0.4 mm. Collimator ramp and squeeze settings and functions have been updated/re-generated. Collimation loss maps – very lengthy:  3.5 TeV Crossing angle 170 microrad.  3.5 TeV Crossing angle 100/110 microrad,  * 11/10 m.  3.5 TeV Crossing angle 100/110 microrad,  * 3.5 m.  Collisions.

Collimator functions (TCTs) in squeeze

Qualification - status End ramp Betatron OK Both off-momentum OK Asynch dump test OK Reduced crossing angle Betatron OK Both off-momentum OK Asynch dump test to do 3.5 m separation bump off Betatron OK Positive off-momentum to do Asynch dump test to do Collisions Betatron OK Negative off-momentum OK Positive off-momentum not OK B2 Asynch dump test OK ! Some loss maps must still be analyzed !

Incorrect B2 hierarchy in collisions

Asynch. dump tests Tests are performed with a 1.7 sigma/1.2 mm offset corresponding to the limit of the position interlock (SIS)

Injection 13 Due to a mistake during settings copy, the SPS LHC3 cycle used for the 150 ns beam had a momentum slope on the flat top.  Resulted in a 0.1 permill energy difference with respect to the nominal setting (and to the other cycles). The error was corrected, TI2 and TI8 had to be re-steered. Loss levels could be restored. SPS H scrapper broken on Sunday.  Access. Problem with a cable – fixed.

Injection protection was qualified by launching trajectory oscillations down TI2 and TI8 towards the LHC.  Validate protection settings of the TCDI (TL), TDI and TCLI (LHC ring) collimators/absorbers.  Both ALICE and LHCb BCMs triggered during those exercises. During the protection qualification exercises QPS crates lost communication on TI2 (MB.A9L2) and TI8 side (MB.A8R8 – happened twice), correlated with ‘larger’ losses on TL collimators.  Hard reset in tunnel required.  New firmware prepared, but not deployed (tests during access on Thursday not successful).  Cables have been re-routed (coupling with BLMs) – assuming the issue is EMC. Injection protection qualification 14

Protection validation - example 15 Example of a 4 sigma amplitude oscillation through TI8. Must scan all phases

Injection protection results 16

A quench test at injection was performed late night on Saturday. Aim was to observe the onset of the quench with nQPS (without triggering the QPS).  Beam was bumped (inwards as B1 on inside) at quadrupole 14R2.B1, up to approx. -24 mm.  Beam was in inject and dump mode.  No quench was induced, even with ~8E9 p/bunch.  The test had to be stopped when the QPS controller (DQAMC.C14R2 controller) in the area lost communication. An access had to be given to reset the crate.  A contact dose of 20 uSv/h was measured at MB.C14.R2. SEU? Quench test 17

Trajectory R2.B1

Quench test ● The plots show one of the highest registered losses (transient losses). The values on the first and the second monitor on MQ is up to factor 3 above calculated quench level. 19

On Monday a beam was lost due to a redundancy problem on the ‘OP buttons’ input to the BIS  Redundant signals were inconsistent.  Preventive replacement of a power supply by BIS team. Thursday afternoon a problem was observed on the PIC in sector 81.  Finally a ANYBUS module had to be exchanged.  A requalification of the PIC tests was performed successfully on Friday afternoon. Global Protection Mechanism. PIC2_QPS_OK on all circuits. PIC2_POWERING_FAILURE test on all main circuits. Interlock systems 20

Settings and QPS 21 In past 3 days we were struck again twice by QPS false quench triggers due to discontinuities in converter functions:  RCBX corrector – fixed (issue with incorporation and trim).  RQTF : spikes introduced by feed-forward correction, most likely combined with QFB action. Spikes removed by hand for RQTF/D.

Program for today Beam-based alignment of TOTEM RPs.  TOTEM BLM thresholds increased factor 10 for alignment Final asynch. dump tests. Next day(s): Stable beams with 24 bunches, followed by an increase to 48 bunches if everything is smooth. Consolidation of train operation. Abort gap cleaning tests (MP external review follow up).

Intensity increase From the moment we reach 48 bunches: Intensity steps ~ 48 bunches. At a given intensity step at least 3 fills and around 20 hours (or more) of Stable beams are required. Intensity increase possible if no problems are encountered on the MP side (checklist).