The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA 04345 Tel: 207.582.1135 Fax: 207.582.1176 50 State Street, Suite 3 Montpelier, Vermont.

Slides:



Advertisements
Similar presentations
Guatemala: El Canada Hydroelectric Project
Advertisements

Will CO2 Change What We Do?
NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
RGGI Leakage Workshop Presentation June 15, 2006 Stephen J. Rourke Vice President, System Planning ISO New England.
Tenth Annual Midwest Energy Conference March 7, 2007 How Best Satisfy Midwest Electric Load Growth? Thomas R. Casten Chairman Recycled Energy Development.
Toward a Sustainable Future Name of Conference, Event, or Audience Date Presenter’s Name | ©2011 Synapse Energy Economics Inc. All.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
North American Natural Gas Infrastructure Needs Donald F. Santa, Jr. President Interstate Natural Gas Association of America The Independent Petroleum.
Overview Vermont Power Supply University of Vermont January 27, 2004 Dave Lamont Vermont Public Service Department.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
Renewable Energy Vermont Vermont Perspectives, Activities, and Plans September 21, 2005 J. Riley Allen Vermont Department of Public Service.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1. What Do We Know About Our Energy and Climate Policy? John W. Rowe Chairman and CEO, Exelon Corporation Grand Challenges of the 21 st Century Conference.
Strategic Thinking About Vermont’s Electricity Future Michael H. Dworkin, Chairman Vermont Public Service Board University of Vermont April 20, 2004.
SGM P.R. Shukla. Second Generation Model Top-Down Economic Models  Project baseline carbon emissions over time for a country or group of countries 
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
CHEAPER AND CLEANER: Using the Clean Air Act to Sharply Reduce Carbon Pollution from Existing Power Plants, Delivering Health, Environmental and Economic.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Renewable Energy: Legal and Policy Issues Frank Prager Vice President, Environmental Policy Xcel Energy November 20, 2009 Frank Prager Vice President,
VINCE GRIFFIN VICE PRESIDENT ENVIRONMENTAL & ENERGY POLICY INDIANA CHAMBER OF COMMERCE.
Electric Generation Reliability Remarks Before the Pennsylvania Public Utility Commission 2011 Summer Reliability Assessment Meeting June.
Desperate Buyers in a Sellers Market Lessons For Vermont in a Carbon Constrained World Michael Dworkin, Professor of Law & Director, Institute for Energy.
Future of Renewables in Victoria Dr Jeff Washusen Marsden Jacob Associates VPELA 30 April 2012.
A Balanced Energy Plan for Alaska’s Railbelt Opportunities for End-Use Efficiency/Conservation and Renewable Energy Prepared for the Alaska Clean.
CLEAN ENERGY TO PROMOTE CLEAN AIR & IMPROVE ELECTRICITY PRICE STABILITY Alden Hathaway, ERT Debra Jacobson, GWU Law School April 6, 2006.
Future Energy Scenarios 2015 Supply Marcus Stewart Demand and Supply Manager.
1. Summit Implementation Review Group December 10, 2008 El Salvador Philippe Benoit Sector Manager, Energy Latin America and the Caribbean The World Bank.
Vermont Electricity Overview -- Richard Watts, June 9, 2004.
[Legislative] [Danish Policy] Energy 2000, Target to reduce CO2 emissions in 2005 by 20% compared to 1988 levels. Energy 21, Reinforce targets.
Wind Energy Development In Illinois William S. Haas Energy Division Representative.
Draft Avoided Cost Forecast and Marginal CO 2 Offset Value of Conservation Regional Technical Forum Maury Galbraith Northwest Power and Conservation Council.
NW Regional -- Washington n n Washington’s residents, businesses and industries spend $10 billion on their energy costs each year. n n Washington’s long-term.
The Regulatory Assistance Project 110 B Water Street Hallowell, Maine USA Tel: Fax: State Street, Suite 3 Montpelier,
Spain: Can we give up any of the primary energy sources? Alejo Vidal-Quadras Roca Vice-President of the European Parliament Member of the Industry, Energy.
1 Macroeconomic Impacts of EU Climate Policy in AIECE November 5, 2008 Olavi Rantala - Paavo Suni The Research Institute of the Finnish Economy.
Highlights of AESC 2011 Report Vermont Presentation August 22, | ©2011 Synapse Energy Economics Inc. All rights reserved.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Distributed Energy Resources The Energy Challenge of the 21 st Century.
Impact of the Netherlands Coal Tax on: - the use of power stations - costs to end-users and government revenues - support for energy transition July 20,
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
COMMUNITY CHOICE AGGREGATION: TECHNICAL STUDY RESULTS Peninsula Clean Energy September 24,2015.
Global energy, trends and figures Global energy demand:  will grow by more than 30% over the period to 2035,  China, India and the Middle East accounting.
Northwest Power and Conservation Council Slide 1 Accelerating Energy Efficiency To Reduce the PNW Power System's Carbon Footprint Tom Eckman Manager, Conservation.
World Energy Outlook 2006 Scenarios for the World and the European Union Presentation to European Wind Energy Conference Milan, Italy, 7-10 May 2007.
Washington Coal Club May 14, 2008 Carl O. Bauer, Director Coping with Competing Energy Strategy Directions Office of Fossil Energy National Energy Technology.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
Delivering commercial insight to the global energy industry Wood MackenzieEnergy Natural Gas Markets Enter an Era of Unprecedented Uncertainty.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont.
WCOAEE Meeting: Natural Gas & Electric Update April 16, 2015.
El Gallo Hydroelectricity Project PDD Analysis
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
Designing Energy Solutions without Borders National Association of Regulatory Utility Commissioners National Association of Regulatory Utility Commissioners.
Northwest Power and Conservation Council Overview of Draft Sixth Power Plan Council Meeting Whitefish, MT June 9-11, 2009.
U.S. Energy Information Administration Independent Statistics & Analysis Outlook for coal and electricity for National Coal Council November.
Consumer Cost Effectiveness of Carbon Mitigation Policies in Restructured Electricity Market Jared Moore and Jay Apt (adviser) CMU Engineering and Public.
Slide 1 Overview of Conservation in the Pacific Northwest Energy Efficiency Options in the Northwest Post-2011Meeting March 4, 2008.
Wind Power in New Hampshire 2016 ACEC / NHDOT Technical Exchange Conference April 7 th, 2016.
Northwest Power and Conservation Council The Role of Electric Energy Efficiency in Reducing PNW Carbon Emissions Tom Eckman Manager, Conservation Resources.
World Energy and Environmental Outlook to 2030
At-Risk Nuclear Plants: Challenges and Opportunities
Draft 2013 Energy-Efficiency Forecast
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Creating Benefits for New England: Putting the Pieces Together
Wholesale Electricity Costs
Creating Benefits for New England: Putting the Pieces Together
Presentation transcript:

The Regulatory Assistance Project 177 Water St. Gardiner, Maine USA Tel: Fax: State Street, Suite 3 Montpelier, Vermont USA Tel: Fax: Website: Energy Policy Challenges Facing Vermont 28 January 2004 Frederick Weston

Introduction Regulatory Assistance Project RAP is a non-profit organization, formed in 1992, whose principals are former utility regulators from Maine, Vermont, and New Mexico. RAP provides workshops and educational and policy assistance to government officials on electric utility regulation. RAP is funded by, among others, the Energy Foundation, US EPA, and US DOE.

Energy Policy Context: Limits and Opportunities  Cost  Environment  Geography  Markets  Alternatives

Electricity Policy Context: Vermont  Electricity Cost  High compared with national figures  Moderate compared with regional figures  Environment  Vermont’s electric power commitments: relatively low emissions, low climate impact  No policy in place assures this will continue  Future regulatory uncertainties

Electricity Policy Context: Vermont  Geography  Vermont is at the end of the energy pipeline  This is one reason why energy efficiency is so desirable  Markets  Electric power is dispatched in New England based bids in commodity markets, not on the costs of production (should be equal, or nearly so, if the markets are truly competitive)  New electric power has to make sense regionally and locally

Generation Alternatives  Nuclear  Gas  Coal  Oil  Renewable Energy  Hydro, Biomass, Wind, Solar  Build, Buy, or “Rent”

Slow growth in annual peak, summer peak rising faster

Electricity sales- slow growth

Positive Steps  Since 1984 peak demand in VT has risen by ~125 MW, all met by new, in-state renewables  40 MW - small hydro, IPP, WEC, GMP  88 MW - McNeil and Ryegate wood chip plants  6 MW - Searsburg wind project  small landfill gas projects – Brattleboro and Burlington  Vermont utilities’ energy efficiency efforts, including Efficiency Vermont, have saved over 80 MW of demand  Bottom line – current portfolio mix is very high in renewables, and America’s lowest in CO2  BUT – VT still imports a large % of our electricity

Other Resource Alternatives  Transmission  Exports the generation siting issue  Creates a new siting issue  Demand Side Resources  Energy efficiency  Demand response  Customer-sited generation  Can local resources avoid power lines?

Cost  Generation markets are competitive  Cost data are harder to get – markets bid-based  Natural Gas Combined Cycle  ~4 cents per kWh  Highly dependent on the volatile cost of gas  Other generation sources: very location-specific  Wind in New England: 5-6 cents per kWh  Efficiency: 3 cents per kWh (peak and energy growth persists)

Other Key Elements of Vermont’s Situation  Growth:  Significant growth in electric demand in the summer (can this be controlled?)  Transmission:  Current $150 million proposal  Likely other improvements needed if demand growth continues  Local weaknesses  Demand resources and local generation could significantly reduce need for transmission

Synthesis  It is prudent to control demand because:  End-use efficiency and demand response are cheapest and environmentally most preferable  Vermont is so reliant on out-of-state supply  In-state resources also help balance Vermont’s need for out-of-state supply  If climate change regulation becomes a reality, power economics will change dramatically  Technology can surprise us (happily or un-)

The Broader Context  What about the larger context?  Regional, national, global issues  As usual, things are more complicated than they seem:  Costs and risks in utility decision-making  Choices among “goods”  Price, long-term cost, environmental quality, climate change, risk management

New England Electricity Mix

Load Densities - Southern New England Location Matters: The Geography of Congestion

Factors Affecting Vermont’s Resource Decisions VermontSlow growth, but future resource gaps Low emissions NE RegionSurplus capacity; year of need ~2010 Moderate emissions USRapid growth, gas crunch coming High emissions GlobalWorld demand affects fuel prices Global warming concerns

How Will We Serve US Load Growth?  Sales up 31% during the last decade. Will it be another 37% this decade?  Peak loads are growing rapidly, currently >800,000 MW  Summer peak increased 56,000 MW in last 4 years  NERC predicts >160,000 MW,  We’re adding the electrical equivalent of an entire New England every 14 to 18 months  DOE forecast: adding the equivalent of Japan and Germany to the US grid by 2020  Can we build and run over 300,000 MW of new capacity? What are the transmission, environmental, and cost consequences of such an expansion?

Generation mix US and selected regions

DOE’s Forecast in 2001: Coal or Gas? Both!

And the Winner Is? DOE’s Forecast in 2003

U.S. CO 2 Emissions

Decision-Making: Potential Benefits of Wind  Mitigates Fuel Price Risk  Reduces Natural Gas Prices  Reduces Wholesale Power Prices (through “bid stack effect”)  Displaces Emissions & Mitigates Future Environmental Compliance Risk  Promotes Local Economic Development  National and Global Contributions

But…Concerns  Is wind a higher priced resource?  Intermittent resource – does this mean it’s not reliable?  Can Vermont wind make a difference or would we be better doing something else?  Siting: electrical, aesthetic, and environmental impacts  Local economic harms?

Major Resource Options for Vermont  VT Yankee  Shift to Fossil Plants  New Cogeneration and Distributed Gen in VT  Efficiency and Load Management  Ride the Spot Market  Add Renewables  Imported Hydro (HQ or Lower Churchill)  Connecticut and Deerfield River Dams  Blended Balance

Lots of Uncertainty  Gas prices  Nuclear and Hydro conditions  Load Growth  Production Tax Credit  CO 2 Taxes (trading?)  Interest Rates  Efficiency potential  Old Approach  Make one assumption for each area of uncertainty. Calculate a least-cost mix.  New Risk Analysis Approach  Calculate probability- weighted portfolio cost, volatility, and standard deviations; use judgment with final results.

The devil is in the details “But what if we do switch to gas, and then the cost goes through the roof?”

Gas Prices Have Increased

Market Prices Likely to Rise

Winter Monthly Gas and Electric Prices Synapse Energy Economics

How Much Do Renewables Cost? Compared to What?  SUMMARY OF VARIOUS PRICE FORECASTS  Nominal Market Price (in Dollars per MWh, including energy and ICAP)  SponsorDate  DPS2000Apr-00$39.74$42.03$44.54$47.52$50.72$52.52  DPS2000aDec-00$46.94$43.04$45.68$48.74$52.19$54.09  GMP 2/01Feb-01$37.72$35.19$33.66$35.65$37.05$39.00  GMP 7/01Jul-01$42.05$39.18$37.45$37.63$41.29$43.50  CVPS 01Jul-01$45.85$43.04$39.07 $41.29$43.67$45.03  DPS2001Jan-02$38.84$36.34$37.66$44.25$50.85$52.74  CLFJan_02$35.18$32.65$31.12$31.28$34.51$36.46$38.54  GMP 1/02Jan-02$30.68$26.36$26.52$28.92$31.68$33.80  CVPS 02Feb-02$30.87$31.44$32.48$35.26$41.55$42.86  Source: Vermont PSB Vermont Yankee transfer docket

Wind Cost  Production tax credit is very important to wind economics today (reauthorization?)  Production cost is dropping with larger units and more production  Unclear when PTC will no longer be needed  Location affects cost  Wind in Texas can be 2-3 cents/kWh cheaper!  Prospects for off-shore wind?

Puget Sound Energy Least Cost Plan March 2003 Comment Draft, P. X-30 Assumed CO2 Regulation in 2008

Effect of Production Tax Credit and/or Carbon Tax

How Much Are We Willing to Pay?

Is Economic Activity Correlated to Electricity Prices? Source: Bureau of Labor Statistics

How Much Do Renewables “Cost”? Bid Stack Effect How the single-price wholesale market works: Renewables with low operating costs will bump higher- cost marginal resources out of the “bid stack,” leading to lower clearing prices Two studies of NY RPS (17% to 25%) measure this: Joint Utilities: -$1/MWh by 2013 NYSERDA: -$1.3/MWh by 2013 >Same is true of efficiency

Intermittence of Wind  Wind power is generated when wind is sufficient (25-40% of full capability)  Produces more often, but at less than full output  High coincidence with winter peak  Low coincidence with summer peak  Energy value varies with time of production  Capacity value: estimated in some markets to be 20% of rated capacity

Intermittence of Wind  Most volatile part of the electric delivery chain: Demand unpredictability >> wind generation  System operators must adjust region’s generators in real time to follow our consumption of electricity  “Intermediate” generators do this job well, might run +  Intermittence of wind matters when it changes the system operators’ task  Need far more wind than is in development now in New England before mitigating steps are required

Efficiency is cheaper

Slow Down!

Business As Usual

Concluding Thoughts  What do we want in the portfolio?  Not just wind v. gas & nukes  Wind, hydro, biomass, CHP, efficiency, and the rest are all competing for our investment $  Whose needs are we trying to meet?  Who is taking what risks?  Consumers, regulated utilities, or market participants?  Can we improve our methods of assessing risks?  Can we be creative with the siting process and community solutions?  The choices aren’t always easy.