IST 37652 Hard Real-time CORBA HRTC WP6 / R.Sanz / Lund 16 September 2003 WP6: Status & Achievements Project Management Report Ricardo Sanz Universidad.

Slides:



Advertisements
Similar presentations
Examples of good practice. Examples of Good Practice Use of external UK and/or international external organisations as non-funded partners (target country.
Advertisements

Researchers nights Information Day Colette RENIER Research Executive Agency FP7-PEOPLE-2010-NIGHT INFORMATION DAY Brussels, 12 November.
Roadmap for Sourcing Decision Review Board (DRB)
CIRAS PROJECT OVERVIEW
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
Montse Moharra; Antoni Parada on behalf of WP8 of the EUnetHTA project Catalan Agency for Health Technology Assessment and Research EUnetHTA HANDBOOK ON.
Identification of critical success factors for implementing NLLS, through collaboration and exchange of expertise IDENTIFY LLP-2008-RO-KA1-KA1NLLS.
HRTC IST Hard Real-time CORBA WP6 / R.Sanz / Vienna September HRTC Plenary Meeting Closing Issues Ricardo Sanz.
Rational Unified Process
HRTC Hard Real-time CORBA IST WP6 / R.Sanz / Viena September 11-13, HRTC Plenary Meeting Ricardo Sanz.
IST Hard Real-time CORBA HRTC WP5 / M.Segarra / Lund 16 September WP5 Dissemination and Exploitation Miguel Segarra.
UGDIE PROJECT MEETING Kranjska Gora – April WP8 - Project Management 3 rd Amendment formalised –Budget transfer request –Time extension request.
IST Hard Real-time CORBA HRTC WP4 / M. Rodríguez / Lund 16 September 2003 WP4: Process Control Testbed Universidad Politécnica de Madrid.
Iterative development and The Unified process
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
Merlin ITEA Symposium Merlin Overview2 Problem domain Companies hardly develop embedded products completely on their own Embedded systems need.
Release & Deployment ITIL Version 3
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 Plan 1 st period Inova+
All Hands Meeting DORII Deployment of Remote Instrumentation Infrastructure Norbert Meyer PSNC October 20, 2009, Garching.
The Project Planning Process
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
APRE Agency for the Promotion of European Research Lifecycle of an FP 7 project Caterina Buonocore Riga, 13th September, 2007.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
1 Software Process Lecture Outline Nature of software projects Engineering approaches Software process A process step Characteristics of a good.
RUP Fundamentals - Instructor Notes
COMP-14: Automating your deployments using ANT Gary S Clink Business Consultant.
NIST Special Publication Revision 1
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
 To explain the importance of software configuration management (CM)  To describe key CM activities namely CM planning, change management, version management.
1 National Research Council - Pisa - Italy Marco Conti Italian National Research Council (CNR) IIT Institute Executive board meeting 2nd MobileMAN Workshop.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Effective Project Management: Traditional, Agile, Extreme Presented by (facilitator name) Managing Complexity in the Face of Uncertainty Ch08: How to Close.
MODERN 1 st Year Review ENIAC MODERN Ref. Technical Annex MODERN_PartB Rev2 v2.4 WP1: Giuliana GangemiWP2: André Juge WP3: Wilmar HeuvelmanWP4:
“Thematic Priority 3” Draft Evaluation of IP + NoE.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Evaluation Plan New Jobs “How to Get New Jobs? Innovative Guidance and Counselling 2 nd Meeting Liverpool | 3 – 4 February L Research Institute Roula.
1 Key elements of a good project ECVET contact seminar October 2010 Brussels LEONARDO DA VINCI.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
IDARI Workshop, Tartu, June 2005 NUI Galway Work Package 4 Administration Lorna Ryan The IDARI project is financed under the FP5 Quality of Life and Management.
FP7-Infra : Design studies for European Research Infrastrutures 1st October 2011 – 31st December 2014 Duration 39 months – Periods : 2 (month.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
Work Package 6 2nd Consortium meeting, Provincia di Reggio Emilia, 3rd May.2011 Blaz Jemensek, PIL Klemen Gostic, PIL.
What is project management?
Standardisation in the European Statistical System inventory of normative documents and the standard-setting process – results of the ESSnet on Standardisation.
Number: TR/06/B/F/PP/ WASTE-TRAIN VOCATIONAL TRAINING, EDUCATION, CONVEYING INFORMATION ON UP-TO-DATE WASTE MANAGEMENT PRACTICES TO DECISION MAKERS/STAFF.
Participation Ad-Hoc Legal Ad-Hoc Joint status. General General good progresses made on the document’s structure The two ad-hocs are meeting jointly One.
WP4 – Cloud Platform & Provisioning Technical Review Period 1 This document produced by Members of the Helix Nebula consortium is licensed under a Creative.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Implementation recommendations 1st COPRAS review Presentation at 2nd COPRAS annual review, 15 March 2006, CEN/CENELEC meeting centre, Brussels Bart Brusse.
Lab 3 – SRS Review & Implementation Planning. Milestones 1.Web Page Design & Implementation 2.Revise communication protocol 3.Develop a test tool for.
EUROPEAN COMMISSION Horizon Research and Innovation Framework Programme H2020-MG-2015_TwoStages The PHARAO project “Proactive, Technology-Assisted.
IPR and the EThOS Project 28 th October 2008 Dr. Susan Copeland Senior Information Adviser (Research)
“Preparing competitive grant proposals that match policy objectives - project proposal evaluators' viewpoint ” Despina Sanoudou, PhD FACMG Assistant Professor.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
A project funded by the European UnionImplemented by a consortium led by Get ready for the call! Next steps for building partnerships and developing a.
Stages of Research and Development
Deliverables, final review and final reporting
Third PMC meeting University of Priština, Kosovska Mitrovica
4th. Plenary Meeting, Edinburgh, May 2010
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
AMICI WP1 – Management, coordination and dissemination
Helene Skikos DG Education and Culture
Presentation transcript:

IST Hard Real-time CORBA HRTC WP6 / R.Sanz / Lund 16 September 2003 WP6: Status & Achievements Project Management Report Ricardo Sanz Universidad Politécnica de Madrid

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Contents  HRTC Project overview Project Context and Objectives Project Context and Objectives Work Organisation Work Organisation  Previous Review Recommendations Recommendations Actions Actions  Present status Achievements Achievements Numbers Numbers  Future

IST Hard Real-time CORBA HRTC WP6 / R.Sanz / Lund 16 September 2003 The HRTC Project An Step toward Hard Real-time CORBA

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Complex Control Systems  Control systems are software-intensive applications that are becoming extremely complex as new functionality is required from them.  Software complexity is a major engineering challenge  Distributed object technology and middleware have proved useful in dealing with the integration problem in complex systems

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 HRTC Project Objectives  Start R+D activities in CORBA for hard real-time distributed control: Elaborate requirements for CORBA-based controllers Elaborate requirements for CORBA-based controllers Foster activity inside the OMG Foster activity inside the OMG  Domain Analysis and Domain Architecting  Build two testbeds Robot Control Testbed: tight timing, performance Robot Control Testbed: tight timing, performance Process Control Testbed: heterogeneity, scalability Process Control Testbed: heterogeneity, scalability  Build a pluggable transport over predictable networking hardware

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Milestones  Milestone MS1 Domain analysis of CORBA control systems (CCS) Domain analysis of CORBA control systems (CCS) Analysis and design of real-time protocols Analysis and design of real-time protocols Specification and design of testbeds Specification and design of testbeds  Milestone MS2 Implementation of HRT Protocols for RT CORBA Implementation of HRT Protocols for RT CORBA Non-HRT testbeds Non-HRT testbeds Core set of CCS architectures Core set of CCS architectures  Milestone MS3 HRT testbeds HRT testbeds Testbed testing and documentation Testbed testing and documentation CCS engineering handbook CCS engineering handbook

IST Hard Real-time CORBA HRTC WP6 / R.Sanz / Lund 16 September 2003 Work Organisation Team and Workpackage Structure

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Work Packages 1.CORBA Control Systems 2.Hard Real-time Protocols 3.Robot Control Testbed (RCT) 4.Process Control Testbed (PCT) 5.Dissemination 6.Management

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Project Testbeds  Robot Control Testbed Robots, sensors, native controllers Robots, sensors, native controllers Focus on temporal aspects Focus on temporal aspects  Process Control Testbed Continuous process, commercial DCS, simulation, embedded devices Continuous process, commercial DCS, simulation, embedded devices Focus on integration Focus on integration

IST Hard Real-time CORBA HRTC WP6 / R.Sanz / Lund 16 September 2003 Previous Review Brussels, Jan 22, 2003

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Recommendations  8+4 recommendations 8 from the review report 8 from the review report 4 from the addendum 4 from the addendum  The consortium took the necessary steps to implement recommendations of the HRTC 1 st Review Report and addendum.

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Recommendation 1  “The deliverables provided were of varying standards and quality. It should be noted that the deliverables for WP4 set the appropriate standard and project partners should aim to emulate this in all future deliverables.”  Quality control measures have been enhanced to ensure quality and homogeneity.

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Recommendation 2  “For WP2 discussing ‘protocols’ the presentation given clarified many things that were not clear from the deliverable. The partners should ensure that future deliverables provide a clear, concise and complete description of the work done.”  Enhanced releases of the protocol design deliverable have been produced.

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Recommendation 3  “In the presentation for WP3 emphasis was placed on the TrueTime and JITTERBUG tools that had been developed at the University of Lund. The use of these tools is not clearly stated in Annex 1 and little was said about them in the deliverables provided. The work on co- simulation and timing analysis using these tools was thought to be very useful and it would be helpful to explain how these tools will be used in the definition of requirements and the analysis of systems.”  The document HRTC 057 was prepared and submitted. It was accepted with qualification.

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Recommendation 4  “The criteria and method for evaluation proposed in Evaluation Plan D6.2 was thought to be insufficient. The partners should produce a revised version at the end of month 8 that expresses evaluation criteria on tangible outputs. The partners should concentrate on identifying outputs that demonstrate the success of the project.”  A new version was released (2.0) that was accepted with qualification.

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Recommendation 5  “The late / delayed deliverables D1.1, D2.2 and D3.3 should be provided latest at the end of month 8; no further delay would be considered acceptable.”  Done.

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Recommendation 6  “The Dissemination and Exploitation plans presented were acceptable for this stage of the project and it is clear that activities within the OMG have started very well. However, the strategy for commercial exploitation of the results was not clear. Decisions should be made for the final plan to be provided at the end of the project. The final plan should consider the target market and the potential for strategic partnerships. Also the consortium is encouraged to circulate the questionnaire to as wide an audience as possible.”  Done.

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Recommendation 7  “For planning the routes for exploitation the consortium is strongly advised to put a consortium agreement in place that discusses and clarifies among the partners the Intellectual Property Rights (IPRs).”  Done. A Consortium Agreement has been prepared and is in lawyer hands for approval and signature.

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Recommendation 8  “The consortium should reassess the project progress/status at the end of month 9 when the impact of the current delay on the project is clearer. At that moment of time a decision should be taken whether an extended project duration is needed or not. The request made for an extension of two months should be reconsidered at that moment of time, i.e at the end of March 2003.”  The decision to ask for extension was taken and the extension was granted.

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 After-review Deliverables  Sent after the review: D1.1 Domain Analysis D1.1 Domain Analysis D3.3 RCT Procurement D3.3 RCT Procurement HRTC 057 TrueTime and Jitterbug HRTC 057 TrueTime and Jitterbug D2.2 Protocol Specification D2.2 Protocol Specification D6.2 Evaluation Plan (second version) D6.2 Evaluation Plan (second version)

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Additional Actions: D1.1  “it remains unclear how the timing analysis or control techniques to compensate for delays presented fed into the HRT CORBA”  “clarification on the above open issues should be provided at the next review.”  Clarifications will be provided in WP1 presentation

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Additional Actions: D2.2  “deliverable suffers from the said weaknesses and seems to be not yet complete; it would benefit from a revision”  A new release has been provided HRTC D2.2 HRT Protocol Specification v 1.2 HRTC D2.2 HRT Protocol Specification v 1.2

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Additional Actions: D6.2  Some concerns regarding testing procedures and depth of tests in both testbeds  To be addressed during testbed testing

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Additional Actions: 057  “Any ‘additional enhancements’ should be reported in an ‘addendum to HRTC 057’ and presented during the final review of the project”  They will be reported in WP1 presentation and new release of HRTC-057

IST Hard Real-time CORBA HRTC WP6 / R.Sanz / Lund 16 September 2003 Present Status As of M14

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Expected/Actual Status  Planned for Milestone 2 Implementation of non-HRT RCT Implementation of non-HRT RCT Completed*Completed* Implementation of non-HRT PCT Implementation of non-HRT PCT CompletedCompleted Implementation of HRT Protocols Implementation of HRT Protocols Completed (Prototype)Completed (Prototype) Core set of CCS architectures specified Core set of CCS architectures specified CompletedCompleted

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Expected/Actual Status  Planned for Milestone 3 Implementation of HRT RCT Implementation of HRT RCT OngoingOngoing Implementation of HRT PCT Implementation of HRT PCT OngoingOngoing Testbed Documentation Testbed Documentation OngoingOngoing Engineering Handbook Engineering Handbook OngoingOngoing

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Deliverables for the Review IdTitle Lead D1.2CCS Domain ArchitecturesUPM D2.2HRT Protocol Specification (revised Version)SCI D2.3HRT ProtocolTUV HRTC 066RTE Transport DefinitionULUND HRTC 067TTP Transport DefinitionTUV D4.4Non HRTP PCT ImplementationUPM D5.2.7CSWG White PaperUPM D5.2.8HRTC Poster at OMG RT-DOC WorkshopUPM D5.2.9CORBA on TTA at OMG RT-DOC WorkshopTUV D5.4HRTC Project Web PageSCI D5.6Exploitation and Use PlanSCI HRTC 082HRT CORBA Market StudySCI D6.5Quarterly Report (Q3/M9)UPM D6.6Periodic Report M12UPM

IST Hard Real-time CORBA HRTC WP6 / R.Sanz / Lund 16 September 2003 Efforts Used during the project

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Efforts by WorkPackage Q1Q2Q3Q4TotalPlanned% WP % WP % WP % WP % WP % WP %

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Efforts by partner Q1Q2Q3Q4TotalPlanned% UPM % Lund % TUV ,589 % SCI %

IST Hard Real-time CORBA HRTC WP6 / R.Sanz / Lund 16 September 2003 Future Activities and plans for the rest of the project

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Next Milestone  MS3: Scheduled for M15 Scheduled for M15 Operational testbeds with new protocols Operational testbeds with new protocols Tests performed Tests performed Final Documentation Final Documentation

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Work per Package (MS3) 1.Complete Engineering Handbook 2.Testing 3.Implement HRT robot testbed Perform tests + document 4.Implement HRT process testbed Perform tests + document 5.OMG RFI in CSWG Prepare journal papers 6.Perform project evaluation and reporting

Copyright © 2003 The HRTC Consortium. All rights reserved. IST / Hard Real-time CORBA WP6 / R.Sanz / Lund 16 September 2003 Pending Documents (M15) D1.3 CCS Engineering Handbook D3.6 RCT Testing D3.7 RCT Documentation D4.6 PCT Testing D4.7 PCT Documentation D Control Systems RFI D6.9 Periodic Report M15 D6.7 Project Evaluation Report D6.8 Final Report HRTC075 TrueTime and Jitterbug 2.0

IST Hard Real-time CORBA HRTC WP6 / R.Sanz / Lund 16 September 2003 Questions ?

HRTC UPM LTH TUW SCI IST 37652