Chapter – 8 The Supporting Facility

Slides:



Advertisements
Similar presentations
Physical Evidence and the Servicescape (Chapter 11)
Advertisements

Service Environment, Physical Evidence and the Servicescape
Chapter 10: Crafting the Service Environment.
Process Selection and Facility Layout
Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
DAVIS AQUILANO CHASE PowerPoint Presentation by Charlie Cook F O U R T H E D I T I O N Facility Decisions: Layouts © The McGraw-Hill Companies, Inc., 2003.
OPERATIONS MANAGEMENT INTEGRATING MANUFACTURING AND SERVICES FIFTH EDITION Mark M. Davis Janelle Heineke Copyright ©2005, The McGraw-Hill Companies, Inc.
Facility Design and Layout
Chapter 15 Application of Computer Simulation and Modeling.
PHYSICAL EVIDENCE AND THE SERVICESCAPE Chapter 10
1 Process Mapping BA 339 Mellie Pullman. 2 Objectives Service Process Differences Little’s Law Process Analysis & Mapping.
ISM 270 Service Engineering and Management Lecture 5: Facility Location, Project Management.
Facility Layout Facility Layout Facility Layout decisions translate the broader decisions about a firm’s strategy such as competitive priorities, process,
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
© 2006 Prentice Hall, Inc.9 – 1 Operations Management Chapter 9 – Layout Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Operations Management
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin The Supporting Facility.
Supporting Facility and Process Flows
Chapter 6, Process-Flow Analysis
Servicescapes in Facility Management
The Supporting Facility
Operations Management Layout Strategy
Product layout Assembly-line balancing approach. 2 Facility layout Process terminology Cycle time: Average time between completions of successive units.
Physical Evidence and the Servicescape
Traditional Approaches to Facility Layout
Chapter 10 – Facility Layout
Chapter 11: Physical Evidence and the Servicescape
Layout Strategy.
Service Facilities and Process Flows MD854 Management of Service Operations Professor Joy Field.
Chapter 9 Supporting Facility: Creating the Right Environment
Supporting Facility and Process Flows Chapter 7
DOM 102 : Principles of Operations management
Chapter 10 – Facility Layout
SERVICESCAPE SERVICESCAPE & PHYSICAL EVIDENCE Ms.Megha Mody.
COPYRIGHT © 2008 Thomson South-Western, a part of The Thomson Corporation. Thomson, the Star logo, and South-Western are trademarks used herein under license.
MKT 346: Marketing of Services Dr. Houston Chapter 10: Creating the Service Environment.
1 Slides used in class may be different from slides in student pack Chapter 5 Process Analysis  Process Analysis  Process Flowcharting  Categories of.
The Supporting Facility Creating the Right Environment.
OPSM 405 Service Operations Management
Mba Facility Layout u Basic layouts u Some layout techniques u Assembly line balancing u Service Layout.
© The McGraw-Hill Companies, Inc., Technical Note 5 Facility Layout.
Chapter 09 The Supporting Facility
Traditional Approaches to Facility Layout
Process Layout Chapter 7 July 20, 2005.
Process Characteristics
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Chapter 6 Facilities Layout.
Supporting Facility and Process Flows
Operations Management
The Supporting Facility Creating the Right Environment.
Facility Layout Part b.
6-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
Key Learnings: Little’s Law
Physical Evidence and the Servicescape
Theoretical Capacity Theoretical capacity: The capacity (throughput rate) of a process under ideal conditions (units / time) Effective capacity: The capacity.
Chapter 6 The Supporting Facility
Chapter 5 Process Analysis. Chapter 5 Process Analysis.
Process Design and Analysis
Facility Layout Chapter 6A.
© 2000 The McGraw-Hill Companies
Capacity Planning For Products and Services
Capacity Planning For Products and Services
1 Operations Management Layout Strategy. 2 What is Facility Layout Location or arrangement of everything within & around buildings Determines long-run.
Chapter 6A Facility Layout 2.
PHYSICAL EVIDENCE AND THE SERVICESCAPE
AB AC AD AE AF 5 ways If you used AB, then, there would be 4 remaining ODD vertices (C, D, E and F) CD CE CF 3 ways If you used CD, then, there.
Capacity Planning For Products and Services
Copyright ©2016 Cengage Learning. All Rights Reserved
Presentation transcript:

Chapter – 8 The Supporting Facility Service Management (5e) Operations, Strategy, Information Technology By Fitzsimmons and Fitzsimmons Chapter – 8 The Supporting Facility

Learning Objectives Discuss the impact of the “servicescape” on the behavior of customers and employees. Describe the critical facility design features. Draw a process flow diagram. Identify the bottleneck operation in a product layout and rebalance for increased capacity. Use operations sequence analysis to minimize flow-distance in a process layout. Recommend facility design features to remove anxiety of disorientation.

Servicescapes Physical facility should be designed with an image and feel that is congruent with the service concept; because the design of the physical surroundings positively affect employee and customer behavior. The internal response measured cognitively, emotionally, and physiologically is moderated by one’s personal mood. A well conceived servicescape will encourage a proper social interaction between and among customers and employees

Environmental dimensions of servicescape Ambient Conditions: background characteristics such as noise level, music, lighting, temperature, and scent. Spatial Layout and Functionality: reception area, circulation paths of employees and customers, and focal points. Signs, Symbols, and Artifacts: selection, orientation, location, and size of objects.

Facility Design Considerations Nature and Objectives of Service Organization Land Availability and Space Requirements Flexibility Security Aesthetic Factors The Community and Environment

Signs used in flow chart Operation: a rectangle encloses the operation name and cycle time Decision: a diamond encloses the operation name and cycle time Wait: a triangle represents customers waiting or inventory of goods Flow: an arrow shows movement of customers, goods, or information.

Process Analysis Terminology Cycle Time (CT) is the average time between completions of successive units. Bottleneck is the factor that limits production, usually the slowest operation. Capacity is a measure of output per unit time when fully busy. Capacity of an operation = 1/CT Capacity of the entire system = 1/bottleneck capacity Capacity Utilization is a measure of how much output is actually achieved compared to the process capacity.

Process Analysis Terminology (cont.) Throughput Time is the time to complete a process from time of arrival to time of exit (= sum of critical path + average time in queues). Rush Order Flow Time is the time to go through the system without any queue time. Direct Labor Content is the actual amount of work time consumed. Total Direct Labor Content is the sum of all the operations times. Direct Labor Utilization is a measure of the percentage of time that workers are actually contributing value to the service.

Process Flow Diagram of Mortgage Services Property Survey CT=90 min. Credit Report CT=45 min. Title Search CT=30 min. Unapproved Mortgages Approved Mortgages Completed Applications Mortgage Final Approval CT=15 min. Yes No  

Product Layout Work Allocation Problem Automobile Driver’s License Office Review Payment Violations Eye Test Photograph Issue In Out 1 240 15 2 120 30 3 60 4 90 40 5 180 20 6 Activity Number(s) Capacity per hour Cycle Time in seconds

Automobile Driver’s License Office (Improved Layout) 1,4 65 55 3 60 6 120 30 5 180 20 2 In Out

Process Layout Relative Location Problem Ocean World Theme Park Daily Flows 10 6 7 5 20 4 3 1 15 2 8 30 40 12 A B C D E F A B C D E F A B C D E F Net flow Flow matrix Triangularized matrix Description of attractions: A=killer whale, B=sea lions, C=dolphins, D=water skiing, E=aquarium, F=water rides.

Ocean World Theme Park (Proposed Layout) (a) Initial layout (b) Move C close to A Pair Flow distances Pair Flow distances AC 30 * 2 = 60 CD 20 * 2 = 40 AF 6 * 2 = 12 CF 8 * 2 = 16 DC 20 * 2 = 40 DF 6 * 2 = 12 DF 6 * 2 = 12 AF 6 * 2 = 12 Total 124 CE 8 * 2 = 16 Total 96 (c ) Exchange A and C (d) Exchange B and E and move F AE 15 * 2 = 30 AB 15 * 2 =30 CF 8 * 2 = 16 AD 0 * 2 = 0 AF 6 * 2 = 12 FB 8 * 2 = 16 AD 0 * 2 = 0 FD 6 * 2 = 12 DF 6 * 2 = 12 Total 58 Total 70 A B C D E F

Environmental Orientation Considerations Need for spatial cues to orient visitors Formula facilities draw on previous experience Entrance atrium allows visitors to gain a quick orientation and observe others for behavioral cues Orientation aids and signage such as “You Are Here” maps reduce anxiety

Topics for Discussion Compare the attention to aesthetics in waiting rooms that you have visited. How did the different environments affect your mood? Give an example of a servicescape that supports the service concept and another that detracts. Explain the success or failure in terms of the servicescape dimensions. Select a service and discuss how the design and layout of the facility meets the five factors of nature and objectives of the organization. For Example 8.3, the Ocean World theme park, make an argument for not locating popular attractions next to each other. The CRAAFT program is an example of a heuristic programming approach to problem solving. Why might CRAFT not find the optimal solution to a layout problem?