Parabolic Food Aid Delivery System Manjaneeq Allison King Bader Asadallah University of the Pacific Stockton, CA 12/5/2002.

Slides:



Advertisements
Similar presentations
Work and Simple Machines
Advertisements

Travis Frank Ned Feltham Corey Clarke Shawn Belliveau
Moving Armor Target (MAT) Track Jacob Feist Cleon Stanley Thomas Hutton Sladana Lazic 03/30/2006.
The Trebuchet Design Project By: Nick Hansen, Thomas Smith, Matt Borges & Emily Byers University of the Pacific School of Engineering.
University of the Pacific 1 Parabolic Food Aid Delivery System Mishari Al-Nahedh Chia Lee Lisa Mak December 5, 2002 Engineering 5 Section 6 University.
Trebuchet Project By AM and CS.
University of the Pacific1 PFADS Project Team P.O.C. Gavin Saito Miguel Perez Michael Bruch December 5, 2002 University of the Pacific Introduction to.
December 10, 2002 We Fling Foo 1 We Fling Foo Parabolic Food Aid Delivery System(PFADS) By Rob Berkeley Chris Giuffra University of the Pacific.
1 PFADS Design Project Team Whitey Ryan Sellman Jason Marks Toby Taylor University of the Pacific 3601 Pacific Ave. Stockton, CA
1 TREDS The Hard Boilers: Chris Chapman Megan Kalend See Vang ENGR 5 University of the Pacific.
The Pacific Launchers1 Parabolic Food Aid Delivery System (PFADS) The Pacific Launchers Ryan Liu & Michael Nguyen University of the Pacific ENGR 5 December.
PARABOLIC FOOD AID DELIVERY SYSTEM TIM JONES NHAN NGUYEN BLOODY MARY School of Engineering and Computer Science University of the Pacific Fall 2002 ENGR.
Team D.A.N.K. TREDS Design November 29, Pacific Ave. Stockton, CA Travis Damaso Scott Akers Zachary Kimura Nick Nelson.
Parabolic Hacky Sack Launch Mechanism Kristin Hans Khalid Al Mehairi Mark Quijano Jonathan Koehler The Bamboo Launchers School of Engineering University.
Team CRAB PFAD Design Presentation Alriel Gali Lab University of the Pacific - School of Engineering and Computer Science 3601 Pacific Ave.
Our Trebuchet Group: Adrian Hernandez, Randolph Noriega, Kristen Michaelis, and Shaan Barn Lab: Thurs 6-8pm.
Parabolic Food Aid System By: Michael Duong and Abby Conrad.
Team Help Me Jebus Lab Sec.6 Parabolic Food Aid Delivery System Project Engineering 5 Lab Section 6.
Natasha Hyare Ryan Benson Casey Carlin
Hacky Sack Launch Mechanism By: Zachary Cowherd Wen Luu Keiichi McGuire.
By: Alexandro Perez Greg Desrosiers Laura Berg Tara Hodgetts.
University of the Pacific 1 Parabolic Food Aid Delivery System Mishari Al-Nahedh Chia Lee Lisa Mak December 5, 2002 Engineering 5 Section 6 University.
The FAP Delivery System Drew Hayes & Nathan Hua University of the Pacific Stockton, CA Team: Five-Finger Discount.
Trebuchet Design Project Presentation Team H.E.D. Huy Nguyen | Edward Lau | Daniel Vizcaino Lab Section Tuesday 4-6 PM.
TEAM FTP LAB 5 Project PFADS n Kyle Harris n Sang Huynh n Bhupinder Shergill n Eric Stolp.
DarkStar Catapult Michael Whitehead Vince Wong DarkStar Catapult ENGR 5 November 19, 2002.
The Flying Uber Monkeys1 John Giesler Kristen Shimizu Engr 5 University of the Pacific December 3, 2002.
Team F.T.P. Bhubinder Shergill Kyle Harris Sang Huynh Eric Stolp ENGR. 5 LAB 5.
Trebuchet Team Members: Linda Hib, Charlene Obille, Hanh Phan, James Santos Lab: Thursday University of the Pacific School of Engineering and Computer.
Team JADS 1 The PFADS Competition Team JADS Sean McNary John Yoshimura ENGR 5 - Lab 5.
T r e b u c h e t By Jonathan Ching, Isaiah Lilly Karen Quach, Brain Westrick Lab: Wednesday 6-8 p.m.
Team JADS1 The PFADS Competition Team JADS David Rosenberry Adam Yee ENGR 5 - Lab 5.
The Creation of Hera “The Treb Tigers” Stacy Costello & Jennifer Shore oh, and the dudes too: Travis Ford & Kevin Petros University of the Pacific Engineering.
Trebuchet Design Project ENGR-5 Fall 2003 Professors Gary M. Litton and Michael Golanbari Matt Ritchie Hoan Cai Rong Srey Thienan Nguyentan.
Answer to Mechanical Advantage Worksheet
CO2 Cars Project #2 Land Transportation.
Foundations of Physical Science Workshop: Ropes & Pulleys - Work.
Problem Statement There are over 25 million children under the age of 5 in the United States, many of these children are taken out to restaurants to eat.
1 TREBUCHETTREBUCHET A trebuchet owner’s manual by Jennifer & Andrea.
LEARN MICROSOFT POWERPOINT 2010 Westerville Public Library 2014.
Kim Allen, Sam O’Flaherty, and Austin Schantz. Design NOTE: All dimensions are in inches 3D Conceptual Design Front View Side View Top View.
Ping Pong Ball Launcher Group 4 Drzewianowski, Kati Hill, Jessica Rembold, Matt Winograd, Ted.
By: Nicole Worytko Avani Patel Brian Prohaska Kyle Hughes
Frame Overview A36 Steel square tubing and plate Frame will rest on four wheels or two air skids 90” Long, 30” wide- outside CG envelope Two carts for.
Dimensional Analysis p237 Warm Up Find each unit rate. 1.jump rope 192 times in 6 minutes 2. four pounds of bananas for $2.36 LO: I will convert measurement.
Garage Door Design Analysis
Engineering Design Process Nyla Snowden EF2 2A December 6.
Standout Technical Designers MAE 416: ME Senior Design Sponsored by Cooper Hand Tools Brian SearsNate Ouellette Pooria Javidi Nathan Mize Chris EvansJustin.
 What is a catapult?  How can you use a catapult?  When was it created?
The Effects of Newton’s Law on a Catapult By: Jonas Exey, Bjorn Grong, David Dininger, Donald Kjornes, Tyler Hamann.
1 Westwood Catapults 2014 Elliot Rose March 19, 2014
P.F.A.D.T.A.S.T.I.C. Parabolic Food Aid Delivery Team And Statistical Thaumaturgies Incorporating Calculus.
BRIDGES CAD 449. Design It is the essence of engineering! “… the process of devising a system, component or process to meet desired needs. It is a decision-making.
Trebuchet Project By AM and CS.
Stringing your car to determine wheel alignment is decidedly old school, but it's also effective, efficient and cheap. Begin by placing your car in a level.
Neil Berg, Evan Spangler, Sam Luzader
Catapult.
4th Grade Motion & Design
Protective Crane Design
Kyle Harris Sang Huynh Bhupinder Shergill Eric Stolp
Tilt N’ Store Design Analysis
Answer to Mechanical Advantage Worksheet
Ballista Project 2 120mm Axle hole 3 Nails 1 200mm
Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials. Bridge Project.
Tilt N’ Store Design Analysis
Team A1-2 times 4 The King’s Team
Team Members: Gabe D, Carter K, Megan A, Isabella S
Team Members: JOSH, Aiden, Abigail
Gravity Vehicle San Diego Regional.
Presentation transcript:

Parabolic Food Aid Delivery System Manjaneeq Allison King Bader Asadallah University of the Pacific Stockton, CA 12/5/2002

Outline Problem Definition Approach (Design Process) Results Improvements Conclusions Acknowledgements

Introduction Mobile parabolic food aid delivery system Refugees surrounded by a piranha- infested river Mountainous jungles full of wild dangerous creatures Goal is to get food to refugees

Constraints No bigger then 18”x18”x18” 10 pounds Must sit behind a line 12 inches from the top of the ramp Must be self triggering Can’t cost more the $20

Criteria Minimum weight Minimum size Maximum accuracy Launch the FAP over the wall

Project Objectives Build a food delivery system It has to catapult a food aid into the refugee camp Camp walls are 6 feet 2 inches It must launch a distance of 10 feet Has to launch a 7 ounce box

Project Objectives (cont.) Group work Use the design process

Launch Ramp and Target Area (Elevation View) PYTHON-INFESTED JUNGLE BOUNDARY 4 in 4 ft 8 ft START LINE FAP TARGET SPOT 6 ft 2 in 3.5 ft 10 ft Figure1

Launch Ramp and Target Area 2 ft 7 ft FAP TARGET SPOT START LINE 1 ft 2 ft FAP TARGET SPOT TRACK 1 TRACK 2 Piranha Infested River 3.5 ft 10 ft 6' 2" Wall 10 ft PYTHON-INFESTED JUNGLE BOUNDARY Figure 2

Preliminary Ideas Figure 3 Pros:Cons: StableNot much power Accurate triggerShort launch arm

Preliminary Ideas Figure 4 Pros:Cons: Long launch arm Might not have enough power More power then others Stable

Preliminary Ideas Figure 5 Pros:Cons: StableNo trigger Good powerHard to build

Preliminary Ideas Figure 6 Pros:Cons: AccurateHard to build StableNo trigger

Decisions The only one that all parts logically worked Felt springs were more accurate Good trigger Connected to FAP longest

Refinements Adding extra springs Add block of wood where trigger hits Extending arms that hold the FAP Bending angle of arms positioning

Construction Drilling holes

Construction First attempt

Construction Working on launch timing

Testing

Final Mechanism

Results Rank (?/37) Weight (lb) Length (in) Width (in) Height (in) Trial 1(ft)Trial 2 (ft)Trial 3 (ft) N/A 8.17 FOM Trial 1 FOM Trial 2 FOM Trial 3 FOM Final N/A Figure 8

Suggested Improvements Bungees Stronger metal rods Don’t use springs Smaller wheels

Conclusion Springs don’t have enough force to make the PFAP go over a 6 ft. wall Springs can make the 10 ft. length accurately Manjaneeq was too long to fit on the ramp, behind the yellow line

Acknowledgements Professor King Daniel Holt Salem Al-Othman Engr 5 web page

Questions?