GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb. 13-15, 2001 W. Althouse 1 GLAST Large Area Telescope: LAT Project Management William E.

Slides:



Advertisements
Similar presentations
NASA’s Goddard Space Flight Center LRO SRR Project Management.
Advertisements

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT ProjectLAT Face to Face, July 17-18, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. N. Johnson / P. Carosso 1 LAT Calorimeter Subsystem W. Neil Johnson Calorimeter.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Mechanical Systems Martin Nordby Stanford Linear Accelerator.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Martin Nordby1 Martin Nordby Stanford Linear Accelerator Center Stanford University.
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Schedule and Cost Electrical Ground Support Equipment Schedule and Cost Scott.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 Peter Michelson 1 GLAST Large Area Telescope: LAT Project Overview Peter F.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Annual Program Review, April 9-11, 2003 W. Althouse LAT-PR GLAST Large Area Telescope: LAT Project Status W. Althouse.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
GLAST LAT ProjectJune 30, 2004 Monthly Review Rev. C 1 GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 1 Introduction & Science Overview 1 GLAST Large Area Telescope: Introduction.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
1 GLAST Gamma-ray Large Area Space Telescope P. Michelson GLAST LAT Spokesperson Stanford University for the GLAST LAT Collaboration.
December 8, 2007R.P. Johnson1 Presentation to the HEPAP Subpanel on the University Grants Progam Robert P. Johnson University of California at Santa Cruz.
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project DOE/NASA Review, March 31, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager
1 GLAST The Gamma-ray Large Area Space Telescope Status of the Mission F.Longo see
GLAST Large Area Telescope (LAT) Overview Peter F. Michelson Instrument Principal Investigator Stanford University William E.
GLAST LAT ProjectApril 2005 Project Status Overview May 24, April, 2005 Lowell Klaisner LAT Project Manager Rev. - LAT Project Status Overview Gamma-ray.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST Mission - LAT ProjectDOE/NASA Review March 31, 2004 Section ISOC 1 GLAST Large Area Telescope: ISOC Subsystems WBS: 4.1.B David Lung Stanford Linear.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Peter F. Michelson Stanford University Principal Investigator, Large Area Telescope Collaboration on behalf of the Fermi LAT Collaboration.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 PREP For CDR - April Schedule Wall Walk GSFC Chart Flip (Select) Post.
The GLAST Background Model J. F. Ormes 1, W. Atwood 2, T. Burnett 3, E. Grove 4, F. Longo 5, J. McEnery 6, T. Mizuno 7 & S. Ritz 6 on behalf of the GLAST.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectPeer Review & CDR Preparation Document: LAT-PR Preparation Schedule Subsystems Peer Reviews –ACD January 7-8, 2003 –CALMarch.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 2 Project Management 1 GLAST Large Area Telescope: Schedule, Cost, Management.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
SLAC Scientific Policy Committee Meeting: May 12, 2001 Particle Astrophysics: GLAST Peter F. Michelson Principal Investigator and Spokesperson, GLAST LAT.
I&T&C Organization Chart
Gamma-ray Large Area Space Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope Instrument Science Operations Center
1. Introduction and Overview
Large Area Telescope Project
GLAST Large Area Telescope:
Integration and Test Organization Chart
SLAC – KIPAC GLAST Physics Elliott Bloom, Roger Blandford Co-Chairs, KIPAC GLAST Physics Department Stanford University SLAC DoE Review June 5-8, 2006.
Introduction and Overview
PMCS Approach - Past and Current Projects
Overview Cost to Complete
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 1 GLAST Large Area Telescope: LAT Project Management William E. Althouse Stanford Linear Accelerator Center Stanford University LAT Instrument Project Manager Gamma-ray Large Area Space Telescope

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 2 LAT Project Management Outline  LAT Project overview: scope, schedule  Participants, WBS, organization, relationships  Funding  System engineering, configuration management  Project management control system description, status  Risk management; contingency management  Major milestones, issues & mitigations, conclusions

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 3 Overview

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 4 LAT Project Scope Develop & deliver the LAT flight instrument in accordance with Collaboration proposal (Nov. ’99) & GLAST Mission level II specs Ground support equipment Balloon flight test Support integration into GLAST observatory Support launch, post-launch mission operations Develop & provide Instrument Operations Center Develop & provide ground software necessary to support the above Develop ground software for science data analysis Provide management, system engineering, and performance & safety assurance as required Provide E/PO services for GLAST Mission Support & participate in Mission Operations & Data Analysis

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 5 Schedule Overview Formulation Implementation SRR NAR M-CDR PDR I-CDR (Joint DOE/NASA Review) Inst. Delivery Launch Build & Test Engineering Models Build & Test Flight Units Inst. I&T Schedule Reserve Inst.-S/C I&T Ops. Calendar Years 1 st Joint DOE/NASA of GLAST LAT Baseline Review

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 6 Organization

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 7 LAT Development Organizations California State University at Sonoma (SSU) University of California at Santa Cruz - Santa Cruz Institute of Particle Physics (UCSC/SCIPP) Centre National de la Recherche Scientifique / Institut National de Physique Nucléaire et de Physique des Particules (CNRS/IN2P3) 1 Commissariat à l'Energie Atomique / Direction des Sciences de la Matière/ Département d'Astrophysique, de physique des Particules, de physique Nucléaire et de l'Instrumentation Associée (CEA/DSM/DAPNIA) 1 Goddard Space Flight Center – Laboratory for High Energy Astrophysics (NASA/GSFC/LHEA) Hiroshima University 2 Institute for Space and Astronautical Science (ISAS) 2 Istituto Nazionale di Fisica Nucleare (INFN) Naval Research Laboratory (NRL) RIKEN 2 Royal Institute of Technology (KTH) 3 Stanford University – Hanson Experimental Physics Laboratory (SU-HEPL) Stanford University - Stanford Linear Accelerator Center (SU-SLAC) Stockholm University 3 Texas A&M University – Kingsville University of Washington 1 French Team 2 Japanese GLAST Collaboration (JGC) 3 Swedish GLAST Collaboration (SGC)

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 8 Work Breakdown Structure WBS ELEMENTINSTITUTIONS (LEAD) 4.1LAT implementationSU (Michelson) 4.1.1ManagementSU-SLAC (Althouse)SU-HEPL, GSFC/LHEA 4.1.2System EngineeringSU-SLAC (Thurston) 4.1.3(reserved) 4.1.4CalorimeterNRL (N. Johnson)French Team, SGC 4.1.5TrackerUCSC/SCIPP (R. Johnson)INFN, JGC, SU-SLAC 4.1.6AntiCoincidence DetectorGSFC/LHEA (Ormes) 4.1.7Electronics, Data Acquisition & Flight Software SU-SLAC (Haller)CEA/DAPNIA, GSFC/LHEA, NRL, SU-HEPL, UCSC/SCIPP 4.1.8Mechanical SystemsSU-SLAC (Nordby) 4.1.9Instrument Integration & TestSU-SLAC (Nordby)Team 4.1.APerformance & Safety Assurance SU-SLAC (Marsh)Team 4.1.BInstrument Operations CenterSU-HEPL (Williams) 4.1.CEducation & Public OutreachSSU (Cominsky) 4.1.DScience Analysis SoftwareSU-SLAC (Dubois)Team 4.1.ESuborbital Flight TestGSFC/LHEA (Thompson)NRL, SU-HEPL, SU-SLAC, UCSC/SCIPP 4.2Mission Ops and Data Analysis (WBS to be developed after implementation is underway)

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 9 GLAST LAT Organization System Engineer T. Thurston, SU-SLAC Integration & Test M. Nordby, SU-SLAC Mech. Systems M. Nordby, SU-SLAC Project Controls T. Boysen, SU-SLAC Performance & Safety Assurance D. Marsh, SU-SLAC Principal Investigator P. Michelson, SU Project Manager W. Althouse, SU-SLAC Instrument Design Team T. Kamae, SU-SLAC Sci. Software R. Dubois, SU-SLAC Team IOC S. Williams, SU-HEPL CAL N. Johnson, NRL France, Sweden TKR R. Johnson, UCSC SLAC, Italy, Japan ACD J. Ormes, GSFC Instrument Scientist S. Ritz, GSFC E/PO L. Cominsky, SSU Collaboration Science Team Electronics & DAQ Flight Software G. Haller, SU-SLAC IPO Balloon Flight D. Thompson, GSFC Team SSAC N. Gehrels, GSFC

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 10 SU-SLAC IPO SU-HEPL IOC Mgr. NRL Cal Mgr. UCSC Tkr Mgr. SU-SLAC SAS Mgr. Level III Documents SU-SLAC Chief Elec. Engr. SU-SLAC Mech. Sys. Engr. SU-SLAC I&T Mgr. GSFC/LHEA ACD Mgr. CEA/DAPNIA: French Proj. Mgr IN2P3 SU-SLAC Tkr Engr. INFN Labs Italian Proj. Mgr. (Pisa) JGC Si Det. Mgr. (Hiroshima) Collaboration Institutions UCSC CEA/DAPNIA ( Power Sys) GSFC/ LHEA SU-SLAC SU-HEPLNRL KTH Stockholm Univ. KTH Stockholm Univ. NRL Cal Mgr. NASA/GSFC GLAST Project Office SU-SLAC IPO Level II Documents SU-SLAC IPO Level I Documents DOE/NASA JOG NASA/GSFC GLAST Project Office Relations between LAT Organizations: Technical direction (deliverables flow oppositely) Level I Documents DOE/NASA JOG NASA/GSFC GLAST Project Office SU-HEPL IOC Mgr. CEA/DAPNIA: French Proj. Mgr IN2P3 SU-SLAC Tkr Engr. UCSC Tkr Mgr. INFN Labs Italian Proj. Mgr. (Pisa) JGC Si Det. Mgr. (Hiroshima) SU-SLAC SAS Mgr. Collaboration Institutions Level III Documents SU-SLAC Chief Elec. Engr. UCSC CEA/DAPNIA ( Power Sys) GSFC/ LHEA SU-SLAC Mech. Sys. Engr. SU-SLAC SU-HEPLNRL SU-SLAC I&T Mgr. GSFC/LHEA ACD Mgr. Relationships established by MoAs & IAs Level II Documents

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 11 Funding

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 12 KTH Stockholm University Wallenberg Foundation ISAS KEK (US- Japan) Ministry of Education, Culture, Sports, Science, & Technology Hiroshima University RIKEN Institute ISAS KEK (US- Japan) Ministry of Education, Culture, Sports, Science, & Technology Hiroshima University RIKEN Institute INFN Labs INFN / ASI CEA/ DAPNIA IN2P3 Labs CNES / CEA / IN2P3 CEA/ DAPNIA IN2P3 Labs CNES / CEA / IN2P3 UCSC DOE IPO DOE NRL GSFC/ LHEA HEPL IPO SSU NASA/GSFC GLAST Proj. Office NASA HQ NRL GSFC/ LHEA Relations between LAT Organizations: Funding Japan INFN Labs INFN / ASI KTH Stockholm University Wallenberg Foundation Italy France Sweden U.S.A. UCSC SU SLAC LAT Collaboration Institutions Funding Sources JGC x HEPL IPO x SSU xx NASA/GSFC GLAST Proj. Office NASA HQ

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 13 LAT WBS 4.1 Funding Total = $158.2M

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 14 LAT WBS 4.1 Funding

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 15 System Engineering

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 16 System Engineering System trade studies Decomposition and validation of requirements LAT System and Subsystem Requirements Subsystem Interface Control Documents (ICDs) Technical risk assessment Parts and materials planning, qualification, listing FMECA, fault tree analysis Design integration and verification Support Instrument/Observatory ICD development Coordination with spacecraft contractor Supported by IDT

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 17 LAT Trade Studies Many studies complete prior to Nov. ’99 proposal (S. Ritz presentation) Studies completed since selection –Tracker SSD size, pitch  instrument footprint, mass SSD spec finalized, prototypes made and evaluated –Tracker radiator thickness distribution –Grid material: Al vs. CFC Aluminum selected To be resolved –ACD segmentation –Optimize number of on-board processors –Optimize science during intense solar flares –Optimize I&T, calibration and verification testing plans System Engineer supports subsystem internal trade studies

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 18 LAT Specification Tree Document under control of the LAT Project Operations Concept Document GLAST00089 LAT Instrument Performance Spec. LAT-SP LAT - ACD Spec. LAT-SP LAT - TKR Spec. LAT-SP LAT - CAL Spec. LAT-SP T&DF Spec. LAT-SP Aux. Subsystem Spec. LAT-SP-000xx LOF Spec. LAT-SP Program Plan Requirements Science Req’ts Document GLAST00010 Mission Assurance Requirements GLAST00110 Mission System Specification GLAST00074 SGL Comm Interface Spec. GBM Instrument Performance Spec. LV Interface Specification SC-SI Interface Specification GLAST00038 Spacecraft Performance Spec. GBM IOC Specification Inter-Center Interface Spec. Mission Operations Center Spec. LAT Interface Spec. LAT-SP-000xx LAT IOC Performance Spec. LAT-SP LAT SAS Spec. LAT-SP Science Support Center Spec. Document not under control of the LAT Project Level I Project Specifications Level II(a) System Level III Subsystem Specifications Level II(b) Element Level II System Specifications Level II(b) specs derived from II(a) LAT Performance Specs collect all applicable Level II requirements into one place

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 19 Configuration Management All project documentation stored in central database, with individual controlled access via WWW Configuration Item List maintained by LAT Document Librarian Single Document Change Notice (DCN) form for initial release to configuration control (technical baseline), and to record changes; includes provision for red-line markups Subsystem managers approve majority of changes (detailed specifications, drawings) LAT CCB approves changes to level III documents/baselines

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 20 Integrated PMCS Performance Measurement Variance, Critical Path Analysis Cost, Budget* (Cobra) Status Reporting (Cobra) Project Management Control System Overview Scheduling (P3) Change Control Accounting Interfaces Funds Management Copy of SLAC systems for PEP II, BaBar, SPEAR III *DOE/NASA funded elements only

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 21 PMCS: A “Work in Progress” Developing WBS and WBS dictionary –Developing bottoms-up cost estimate –Performing systematic contingency analysis Primavera P3 –Developing resource loaded schedules Identifying key milestones, external links (held in PM WBS) Developing accounting interfaces Development toward baseline –All inputs due in March –First process cycle in April –Stability by June –Budget and schedule baselines ready in July

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 22 Status of PMCS Inputs

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse GLAST LAT PROJECT

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse GLAST LAT PROJECT INCOMPLETE

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 25 Risk Management

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 26 Risk Management Risk management tools –Risk identification & management – risk reduction planning –Performance metrics –Contingency (reserve/margin) management Single interface at DOE, NASA, IPO for all requirements –Weekly telecon meetings Thorough validation & verification processes

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 27 Risk Reduction Planning Use of engineering models to minimize activities in series with instrument integration, test and delivery schedule –Grid engineering model and instrument thermal model permit independent testing of flight radiators –Electronics EMs to permit early flight software verification, support beam test calibration activities –Tracker, Calorimeter and ACD EMs to support early flight software verification, support equipment and test software/procedure verification –ACD EM to support beam test calibration SSD trade study balanced margins for –Science requirements –Mass  instrument footprint  SSD size –Power  number of signal channels  SSD strip pitch Considering construction of thermal vacuum test facility at SLAC to reduce risk of dependence on off-site facilities Study team to develop calibration plan, I&T strategies

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 28 Technical Performance Metrics Technical MetricLevel II Requirement Trigger PointEstimate at Proposal Current Estimate Instrument Mass, kg< Instrument Electrical Power, W< Center of Gravity Offset from Instrument Interface Plane, cm < Horizontal Dimension, m< Instrument Dead Time,  s < Background Rejection10 5 :1 3 x 10 5 :1 Field of View, sr  95% /  68% < Single Photon Angular Resolution 1 GeV, deg Peak Effective Area, cm 2 8,0009,00012,90011,000 Energy 1 GeV, %10977

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 29 Instrument Mass

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 30 Instrument Power

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 31 LAT DOE & NASA Cost

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 32 Major Milestones, Issues, Conclusions

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 33 LAT Project Milestones Instrument System Requirements Review (SRR) 9/28/00 (C) LAT Preliminary Design Review (PDR) 8/6/01 LAT Critical Design Review (CDR) 8/5/02 Subsystems deliveries for beam test calibrations 5/15/03-8/1/03 Calibration unit ready for beam tests 9/1/03 Subsystem deliveries for instrument I&T 10/1/03-12/24/03 Calibration activities complete 1/26/04 –Flight hardware delivered to LAT integration LAT ready for environmental testing 4/9/04 LAT Pre-Ship Review (PSR) 10/7/04 LAT ready for integration with Observatory 12/22/04 GLAST launch 9/05

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 34 Project Issues and Mitigations International commitments –Aggressively working to get signed MoAs and International Agreements DOE/NASA Implementing Arrangement –Working to facilitate agreement Flight software development –Aggressively recruiting additional manpower Balloon flight schedule –Working to reduce conflicting demands on shared personnel Lack of SLAC on-site space experienced EEE parts engineer –Seeking local contractor help Use of off-site environmental test facilities –Proposed on-site thermal vacuum test facility Inadequate reserves to deal with significant budget/schedule hiccups by any major sponsor

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 W. Althouse 35 Project Manager’s Conclusions We have developed the organization to do the job –We have identified and are strengthening weak spots Technical design was very mature at start of Formulation Phase –We are focusing on developing a sound project basis Project is schedule driven, compressed between availability of funding and launch –After assuring performance and safety, tracking and controlling schedule progress is paramount Combined DOE, NASA and other domestic and foreign partner resources make the ambitious LAT goals possible Don’t go to launch pad with our fingers crossed –Do the necessary planning, finish design and fab as early as prudent, to leave maximum time for testing –Test thoroughly to develop confidence