Team Xerox Progress Report Mechanical Engineering Design Team Mechanical Engineering Design Team Jeff Carpenter Charlie Morris David Postel Jeremy Ryatt.

Slides:



Advertisements
Similar presentations
Routed Systems Presented by: Bassam Najar, Design Engineer Butler International Inc.
Advertisements

Engineer Training XL1200 Software Engineer Training XL1200 Software Confidential 2 Print options Archive Print queue Toolbar Preview & Information.
Engineer Training Media Feeder TJ8300 / TJ8500 Media Feeder.
Engineering Roles We will be forming groups of 3 students
Conceptual Design Presentation ME 4182 Team: Guys Engineering Nathan Bessette, Rahul Bhatia, Andrew Cass, Zeeshan Saiyed, Glen Stewart YJ Chok.
09/05/2003 Created by: Mike Loiselle 1 MINI PROJECT THE PULL’N PLOT.
09/15/2003 Created by: Mike Loiselle & Christopher Sulkoski 1 ELM-4701 MINI PROJECT THE PULL ’N’ PLOT.
Digital Communications II
By: Brett Snyder (Team Leader) John Williams Ryan Kindred Gavin St. John Faculty Advisor – Dr. Jamali Course Instructor – Dr. Serpen Final Presentation.
P10511: Miniaturization of Xerography Derek Meinke (ME, PM) Matthew Liff (ME) Tony Zhang (EE) Zaw Htoo (ISE)
Machine Vision Basics 1.What is machine vision? 2.Some examples of machine vision applications 3.What can be learned from biological vision? 4.The curse.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Senior Design: Tachometer Calibration Device Team 4: Jennifer Egolf, Matthew Hagon, Michael Lee, Christopher Pawson Sponsor: DuPont Advisor: Dr. Glancey.
September 23, 2003Jeff Wilson1 The Go-Go Gantry Jeff Wilson Lee Strobridge Allison Bodis David Carlson Mark Jarrett Jeremy Paradee.
September 24, 2003 Created by: P'n'P Team 1 ELM-4701 MINI PROJECT THE PULL ’N’ PLOT.
Anthony Ross Infrared Imaging of Black Liquor Droplets Team Members: Aaron Brandt Will Carter Brent Illingworth Matt Travis Academic Advisor: Dr. David.
Senior Design: Validation of Design December 15, 2008.
INPUT & OUTPUT DEVICE. INPUT & OUTPUT HARDWRE Input hardware consist of devices that translate data into computer readable form. On the other hand, Output.
Hydraulic Log Splitter ET 493- Senior Design One Jordan Millet Ridge Bourgeois Marcus Millet Advisor: Dr. Junkun Ma Teacher: Dr. Cris Koutsourgeras.
Engineer Training Mechanical Overview. Engineer Training Confidential 2 XL1500 is both Roll-to-Roll and Roll-to-Sheet Printer MachineXL1500-2mXL1500-3mXL1500-5m.
XEROX DIGITAL PRINTING SYSTEM Brandon Romano Sang Jung Leon Dillard Kevin Forge.
Vision Integrated Electric Wheelchair Kit (VIEW Kit) Team Wheelchair Visionaries (12) Siddharth Kuncham, Douglass Roman, Peter Arriaza, Neil Zhang Team.
HISTORY MARKET The Development of Concept Companies into Entrepreneurial Business SEED STAGE & EARLY STAGE VENTURE CAPITAL Funding Mentoring UNIQUENESS.
Morin Flexo Printing Technologies Philip Morin 61 East Main Street Forestville, CT Tel/Fax:
Xerox Advanced Development Test Printing Platform Group Members: Andras Resch Keaton Snyder Robbie Carpenter Daniel McCall Hussain Qasem Academic Advisor.
Manufacturing Engineering Department Lecture 9 – Automated Inspection
Unit 91 Week 13 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 12, 2008 Prototype Review Week 2.
STARLight PDR 3 Oct ‘01 F.1.1 Rashid STARLight STARLight Mechanical Tahir Rashid STARLight Mechanical Engineer (734)
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
The Voice Operated and Wirelessly Controlled Elevator Jeremy Hester Advisor: Mohammad Saadeh Class: ET 493 – 01 Class Professor: Dr. Cris Koutsougeras.
Interface between the motion system and process heads that allows the system to utilize any arbitrary process head that has been appropriately configured.
Overview Project Schedule Competition Technology Report Construction Progress Future Work Conclusion.
Highly Flexible Design for Gantry Robot Systems Team: F08-77-FLXGANT1 Client: Logic One Robots Contact: Bill Egert, Engr VP.
University of Connecticut Automated Counterfeit IC Physical Defect Characterization Team 176 Wesley Stevens Dan Guerrera Ryan Nesbit Advisors: Professor.
Drop Testing Apparatus Team Members: Deatly Butler Mark Clouse Chris Dux Kris Honas Shaun Scott Drew Stephens Client: Itron, Inc. Brian Priest Technical.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Team Xerox Final Design Report Mechanical Engineering Design Team Jeff Carpenter Charlie Morris David Postel Jeremy Ryatt Electrical and Computer Engineering.
Mid-Semester Review Senior Design 2 October 8, 2013
The Journey to a West Coast Drivetrain
The Voice Operated and Wirelessly Controlled Elevator Jeremy Hester Advisor: Mohammad Saadeh Class: ET 493 – 01 Class Professor: Dr. Cris Koutsougeras.
May 10, 2013P Xerox Bearing Tester Final Project Review.
How to make a PCB.
Mechatronoics Introduction. What is a Mechatronics? Mechantronics Mechnism Electronics.
MSU ROV Team Final Review Senior Design 2 November 19, 2013.
January 16, 2009Senior Design I - System Level Design Review System Level Design Review Senior Design I Low Energy Printing Project P09505.
Layout Drawings Presentation ME 4182 Team: 5 Guys Engineering + 1 Nathan Bessette, Rahul Bhatia, Andrew Cass, Zeeshan Saiyed, Glen Stewart YJ Chok.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
How selected hoist overload limiter. How should hoist overload limiter Selection Electric hoist is a motor, reducer and rope reel (or chain) as one of.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Veterinary Practice Laboratory Unit 1
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Optical Stage Redesign
It’s…….
By: Tarun Sharma Chinta Rahul SCSE VIT University
Manual Drivetrains and Axles
Designing Process Of Printed Circuit Boards
PIPE SPOOL WELDING SYTEM – LIGHT VERSION
Tracking Camera Platform
Robotic Arm Project Presentation
Installing and Configuring Printers
Advantage points (Phoenix-MT(M,A,T)
Duct Insulation Attachment Team
P14551: Multi-Process 3-D Printer
GLAST Large Area Telescope:
Commercialization Of A Goniophotometer
Commercialization Of A Goniophotometer
System Dynamics Filtering Laboratory
Vibration Isolation System
Presentation transcript:

Team Xerox Progress Report Mechanical Engineering Design Team Mechanical Engineering Design Team Jeff Carpenter Charlie Morris David Postel Jeremy Ryatt Electrical and Computer Engineering Design Team Reuben Bellika Viet Bui PSU Faculty Advisor Mark Weislogel, PhD Xerox Industry Advisor Trevor Snyder, PhD

Overview Summary Summary DODVS Frame DODVS Frame Optic Mounting Assembly Optic Mounting Assembly Optics and Lighting Optics and Lighting BTM Frame BTM Frame BTM Automation BTM Automation Current Progress Current Progress Q&A Session Q&A Session

Summary Objective: produce a imaging system that is capable of capturing ink drops on the drum and on the paper at identical locations Current System: clumsy to use, vibrates excessively, and the optical system fails to meet the desired image quality Current System: clumsy to use, vibrates excessively, and the optical system fails to meet the desired image quality There is no specific imaging system that compares the drum images to paper images There is no specific imaging system that compares the drum images to paper images

Summary

Summary Oil is transferred from the maintenance roller to the drum before ink is transferred by the print head Ink transfer from drum to paper as the paper feeds between the transfix roller and drum

DODVS Frame

DODVS Final Frame Design Uses 3x6 inch T-Slot vertical supports Uses 3x6 inch T-Slot vertical supports ½ inch thick aluminum base and top plate ½ inch thick aluminum base and top plate Added gussets increase natural frequency Added gussets increase natural frequency

DODVS Frame

Optic Mounting Assembly Current system is heavy and cumbersome Current system is heavy and cumbersome

Optic Mounting New system rotates camera to side with one easy step.New system rotates camera to side with one easy step.

Optic Mounting (con’t)

Optics Existing camera and optic components will be reused to reduce cost Existing camera and optic components will be reused to reduce cost A second camera and optics will be purchased A second camera and optics will be purchased New optics system will have a magnification range of 3x to 21x New optics system will have a magnification range of 3x to 21x

Lighting Metal Halide lighting is best option, but may be cost prohibitive Metal Halide lighting is best option, but may be cost prohibitive Splitting current light source may be adequate Splitting current light source may be adequate

BTM Frame Same 3x6 inch T-Slot material Same 3x6 inch T-Slot material Same ½ inch thick base and top plate Same ½ inch thick base and top plate Reuses DODVS camera brackets Reuses DODVS camera brackets Features cover plates to hide messy electronics and wires. Features cover plates to hide messy electronics and wires.

BTM Automation XY Stage donated by Xerox, messy but it will work. XY Stage donated by Xerox, messy but it will work. Manual cranks will be added for a manual override feature Manual cranks will be added for a manual override feature EE’s are currently working on motor driver operation and integration. EE’s are currently working on motor driver operation and integration.

Current Progress DODVS and BTM frame designs are entering detail design stage, final drawings will be complete in a few weeks DODVS and BTM frame designs are entering detail design stage, final drawings will be complete in a few weeks Final decisions on optics and lighting will be made this weekend, and ordered next week Final decisions on optics and lighting will be made this weekend, and ordered next week Manufacturing of the frame assemblies begin in 4 weeks Manufacturing of the frame assemblies begin in 4 weeks On track for June 1 st completion date On track for June 1 st completion date

Q&A Session Questions? Questions?