Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.

Slides:



Advertisements
Similar presentations
Status Specification definition (done) Architecture
Advertisements

M3: ProDiver 525 Kavita Arora (M3-1) *Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 4 Feb 04 Size Estimates/ Floor Plan Overall.
M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 7: March 1st Component Layout (Corrected) Overall Project Objective: Design.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 6: Feb. 25 th Simulation Overall Project Objective: Design an Air-Fuel Ratio.
Team M1 Enigma Machine Milestone March, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #7 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 28 th, 2005 Functional.
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #2 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Jan 24, 2005 Architecture.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 22 Overall Project Objective : Dynamic Control.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VI: February 25 h 2004.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Huffman Encoder Project. Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee Huffman Encoder Project Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Noise Canceling in 1-D Data: Presentation #10 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Mar 28 rd, 2005 Chip Level.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IX: March 30 th 2004.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon. Sept 29 System Hardware Component Diagram.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 2 Feb 04 Size Estimates/ Floor Plan Overall.
1 Team M1 Enigma Machine Milestone March, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Zavo Gabriel (M13) Mike Sokolsky (M14) Design Manager:
Farhan Mohamed Ali (W2-1) Jigar Vora (W2-2) Sonali Kapoor (W2-3) Avni Jhunjhunwala (W2-4) Presentation 4 MAD MAC th February, 2006 Gate Level Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VIII: March 24 th 2004.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Noise Canceling in 1-D Data: Presentation #5 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 21 st, 2005 Component.
Team M1 Enigma Machine Milestone April, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Noise Canceling in 1-D Data: Presentation #6 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 23 rd, 2005 Functional.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #1 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Viterbi Decoder: Presentation #5 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 18 th Feb Component layout Design Manager:
Overall Project Objective: To design a chip for a SCUBA diver that does real-time calculations to warn the diver of safety concerns including decompressions.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: 26 th January 2004.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
M2: Team Paradigm :: Milestone 4 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage III: February 9 h 2004.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Viterbi Decoder: Presentation #4 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager:
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IV: February 18 h 2004.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 15 Overall Project Objective : Dynamic Control.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Viterbi Decoder: Presentation #3 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Team W3: Anthony Marchetta Derek R. Ritchea David M. Roderick Adam Stoler Milestone 1: Jan 21 st Project Proposal Overall Project Objective: Design an.
Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee [M2] Huffman Encoder Project Presentation #3 February 7 th, 2007 Overall.
Alpha Blending and Smoothing
Presentation transcript:

Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel Ratio Controller for a small gasoline engine with low emissions and low cost Design Manager: Steven Beigelmacher

Status Design Proposal (done) Architecture (done) High Level C Simulation Behavioral Verilog & Test Bench Final Algorithm & Major Functional Components Floorplan & Structural Verilog (done) Simulated successfully Gate Level Design Components finished, top-level nearly done. To be done Component Layout Chip Layout SPICE Simulation of Entire Chip

Design Decisions Bit designation of Control Rom All control signals finalized Using latches instead of registers in many cases

Structural Code

Structural Simulation

12bit Input Reg 8X10 SRAM Value Look-up 12bit Input Reg Engine Speed Manifold Pressure 12bit Input Reg Throttle Position Fixed Point Array Multiplier 2:1Mu x 12bit Output Register Control ROM 12bit Input Reg %Oxygen 7X4 SRAM Comparator Look-up 4:1Mux = R0 12bit Register Win Sin[0:1] 2:1Mu x Rcomp Sin[0:1] Index[0:4] Write R1 R2 RowComp[0]RowComp[1] Srow1 Srow2 RowComp[2] 3bit Reg Wcol Index[0:6] Write Rtable 2:1Mu x Scol ColTable[0:3] 2:1Mu x Scol Valid Wmult1 Wmult2 Smult 5bit State Reg Next[0:4] Wout PulseOut[0:11]

Results: Control Rom & Multiplier

Results: SRAM & Comparator

Floorplan Pin Distribution: 5 12-bit inputs 12-bit output 7-bit index input Clk, write, block, valid 8X10 SRAM Multiplier Comparator MUxMUx Control ROM 500µm 7X4 SRAM

Updated Transistor Count Registers (5 12-bit, shift)2,568 SRAMS (1 8x10, 1 7x4)6,720 Comparator410 MUXs (2)696 Control Logic1, bit FP Multiplier3,096 Decoders1,000 TOTAL difference 15,490

Problems Getting basic SRAMs to function Top-level schematic Time

Questions????