Economic Analysis Team Project California State Polytechnic University, Pomona Replacement Analysis (Team 3) Winter Quarter, 2008 Repair or Replace Old.

Slides:



Advertisements
Similar presentations
UWF Computing Hardware Standards ITS Annual Recommendations for
Advertisements

Replacement studies Construction Engineering 221 Economic Analysis.
Chapter 12 - Replacement Click here for Streaming Audio To Accompany Presentation (optional) Click here for Streaming Audio To Accompany Presentation (optional)
Replacement Study Fundamental Issue Over time, company assets need to be replaced due to: Reduced performance Altered requirements Obsolescence A replacement.
Team #5 Presentation Buy or Lease a Car Organizer- Kenny Klingaman Techie- Rolando Arevalo Summarizer- Elizabeth Young.
Upgrading your computer 3 rd May Why upgrade? Current computer will not run some new wanted software or support desired hardware Current computer.
Engineering Economic Analysis Canadian Edition
Transform Your Products Viper are trademarks, and SLA is a registered trademark of 3D Systems Inc. © D Systems, Inc. All rights reserved. The 3D.
Contemporary Engineering Economics, 4 th edition, © 2007 Replacement Analysis Fundamentals Lecture No. 56 Chapter 14 Contemporary Engineering Economics.
Turf Wars Real Grass vs. Artificial Turf EGR 403H – Winter 2010 Team 7 Phillip Allen, Juan Castillo, Geoffrey Cheung.
Economic Comparison Team 9: Mel Capistrano, Reynaldo Curiel, and Saurabh Dave California State Polytechnic University, Pomona
REFURBISH OR PURCHASE COMPUTERS GROUP #8 SILVA ISAYAN-ORGANIZER SILVA ISAYAN-ORGANIZER GERODO CISNEROS -SUMMARIZER GERODO CISNEROS -SUMMARIZER MARLON ORTIZ-
Who Wants An A?. Put the following in order from smallest to largest A. gigabyte B. megabyte C. kilobyte D. terabyte.
Chapter 11 Replacement Decisions
Corporate Buy vs. Lease Analysis A Presentation by Team Four: Junni Kim Trung Nguy Robert Quesada II Felipe Vargas Yiu-Ming Yuen February 10, 2004.
ABC Computer Support Proposal To White Sands Matthew King Derrick Draper Anderson Apachito Johnny Minjares OECS 290.
Solarize Me! Team 1 Kunal Muchhala Luis Rodriguez John Scott.
Chapter 15 Replacement Decisions
Buy vs. Build Desktop Computer Team 2 Caitlin DeAngelis Raymond Kurniawan Jose Avila Alfonso Rios.
Project 2 Team #13: Replacement Options. Team #13 Members Summarizer - Eddie Robles Organizer- Arin Saghatelian Technical- Sumeet Kals.
Economic Analysis Team Project California State Polytechnic University, Pomona Replacement Analysis (Team 3) Winter Quarter, 2008 Repair or Replace Old.
IACC-ITS Joint Meeting June 1 st, 2001 College of Business (COB)
An Economic Analysis of Building vs. Buying a Desktop Computer Macarius Brownfield Stephen Logsdon Jorge Moran Team 7.
LAPTOP SELECTION Using Value Engineering By Mazen A. Al-Juaid August 13, 2005 CEM 512 Value Engineering.
Team #5 Presentation Juan Hernandez- Organizer Sean Guyer- Summarizer Trevor Tran- Techie Jesus Rovira- Techie.
Buying a Laptop. 3 Main Components The 3 main components to consider when buying a laptop or computer are Processor – The Bigger the Ghz the faster the.
REFURBISH OR PURCHASE COMPUTERS GROUP #8 SILVA ISAYAN-ORGANIZER SILVA ISAYAN-ORGANIZER GERARDO CISNEROS -TECH GERARDO CISNEROS -TECH MARLON ORTIZ- TECH.
Alternative Energy VS. Conventional Energy Team 7 Mark Ponciano Aaron Poplar Maritza Robles.
C OMPARING C OMPUTERS Making an educated technology decision.
Hosting on a managed server hosted by TAG  No technical support required  Full backup of database and files  RAID 5 system means that if a hard drive.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Analysis Fundamentals.
Unit 2 – Part 2 Scenario The network manager at Kemnal has asked you to work as part of his team in order to help him to choose an appropriate system to.
1 Modeling Economic Life… Total EAC = EAC of Ownership + EAC of Operation Objective is to determine the optimum number of years to own an asset that minimizes.
Break-Even Analysis Break-even Analysis – performed to determine the value of a variable that makes two elements equal. In economic terms: determining.
1 Replacement and Economic Service Life Replacement Analysis When to replace an asset, and what to replace it with? Outsider’s Perspective… What would.
1 Replacement Decisions How should an asset be replaced? If an asset can be overhauled and used a little longer, should those funds be invested in the.
Contemporary Engineering Economics, 6 th edition Park Copyright © 2016 by Pearson Education, Inc. All Rights Reserved Replacement Decisions Lecture No.
IENG 217 Cost Estimating for Engineers Life Cycle.
Slide Sets to accompany Blank & Tarquin, Engineering Economy, 6 th Edition, 2005 © 2005 by McGraw-Hill, New York, N.Y All Rights Reserved 11-1 Developed.
Lecture No. 46 Chapter 14 Contemporary Engineering Economics Copyright © 2010 Contemporary Engineering Economics, 5th edition, © 2010.
KIDS FIT FOR LIFE Prepared by: Michael HelselProject Manager Lloyd WestBusiness Analyst Roger MillerHardware Engineer Daryl BasarabGraphic Designer.
Today’s Computers By Sharif Safdary. The right computer for you. Advantages to Laptops Advantages to Laptops Size Size Weight Weight Portability Portability.
Introducing the NEW Apple iBook Laptop Computer Anthony Shaffo NEW.
POWERING UP THE LAB! BUDGET PROPOSAL AND DETAILS The Free Thinker School Home of the Rams.
Matakuliah: D0762 – Ekonomi Teknik Tahun: 2009 Replacement Analysis Course Outline 10.
Team Wildcats By: Patrick Kelly And Jesus Flores.
Computer Performance. Hard Drive - HDD Stores your files, programs, and information. If it gets full, you can’t save any more. Measured in bytes (KB,
3/16/2016rd1 Engineering Economic Analysis Chapter 13  Replacement Analysis.
Engineering Economic Analysis Canadian Edition
IT Purchasing Policy Shirley Gifford, Supervisor.
ALPA IT CONFERENCE November 29 – December 1, 2006.
J & H Automotive “Fast, Reliable Service… Guaranteed”
FEATURES OF THIS PRODUCT  It contains Intel core due 2 microprocessor  It have can have up to 4 GB of RAM  2 MB cache  250 GB Hard Drive Energy Star.
Replacement Analysis and Economic Life Should we replace an asset that we own now or later?
Comparison of alternatives
Replacement Analysis Lecture No. 46 Chapter 14
Engineering Economics
Architectural Design Review
By Christine, Katie, Lucas, and Sean
Elijah Washington, Cayla Williams, and Cayra Williams
Suvad Bekric Jailene Gonzalez Meriem Mahmahi
Engineering Economy: Replacement Study
What are the best laptops to buy in the range of k rupees in India?
This presentation uses a free template provided by FPPT.com Computer & Laptop AMC Services in Hyderabad Computer & Laptop.
Depreciation Estimates
Engineering Economics
Convergence /25/2019 © 2010 Microsoft Corporation. All rights reserved. Microsoft, Windows, Windows Vista and other product names are or may be registered.
Replacement Study Fundamental Issue
Replacement Study Fundamental Issue
Engineering Economics
Presentation transcript:

Economic Analysis Team Project California State Polytechnic University, Pomona Replacement Analysis (Team 3) Winter Quarter, 2008 Repair or Replace Old Computers

Team Members Paul S. Cobian-Organizer Mynor Piedrasanta-Techie Spencer Lee-Summarizer California State Polytechnic University, Pomona

Replacement Analysis Equipment: Retained or replaced? –Defender –Challenger Reasons - Obsolescence -Depletion -Deterioration Analysis Technique 3 –Compare EUAC Defender – remaining useful life Challenger – minimum cost life

Defender 50 Computers No salvage value Annual Maintenance: $5,000 Increasing by $750 annually Productivity: $50 per computer (decreasing 5% annually) Labor costs: $18 per hour with 3% annual increase.

Challenger 1 (Dell Vostro) $896 per computer 1.6 Ghz 512 MB RAM 80 GB Hard drive Software $33 per computer increases $5 per year Productivity: $350 per computer Decreasing by 5% Maintenance first 3 years free, $50 per computer w/ $10 incr. annually Labor costs: $18/hr with 3% annual incr.

Challenger 2 (HP xw4600) $1545 per computer Duo core 2.33 Ghz 1 GB RAM 250 GB Hard drive Software $33 per computer increases $5 per year Productivity: $525 per computer Decreasing by 5% Maintenance first 3 years free, $50 per computer w/ $10 increase per year Labor costs: $18 per hour with 3% annual increase.

Challenger Comparison Dell EUACHP EUAC 0Total 1-$32, $58, $9, $20, $2, $8, $1, $4, $1, $2, $ $ $267.30$ $105.21$ $134.30$1, $312.22$1, $618.63$1, $1,047.29$1, $1,601.99$ $2,294.64$ $3, $ HP Wins!

Sensitivity Analysis HP vs. Dell Maintenance CostChoose $100HP $300HP $500HP $750HP $1,000HP ProductivityChoose 5%HP 10%HP 11%HP 12%Dell 15%Dell 25%Dell Hourly SalaryChoose $15.00HP $18.00HP $20.00HP $25.00HP $35.00HP HP Wins

Defender vs. Hp Defender EUACHP EUAC 0Total 1-$5, $58, $6, $20, $7, $8, $7, $4, $8, $2, $9, $ $9,897.14$ $10,704.27$ $11,592.21$1, $12,583.38$1, $13,704.74$1, $14,988.72$1, $16,474.32$ $18,208.38$ $20, $ HP Wins

Sensitivity Analysis HP vs. Defender Maintenance CostChoose $100HP $300HP $500HP $750HP $1,000HP ProductivityChoose 5%HP 10%HP 15%HP 20%HP 25%HP 30%HP Hourly SalaryChoose $15.00HP $18.00HP $20.00HP $25.00HP $35.00HP HP Wins

Overall Analysis HP Computer Best Option Better alternative (EUAC + Sensitivity) High productivity offsets high cost