Polishing the Ferrules Howard Budd Sep 13 2007. Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.

Slides:



Advertisements
Similar presentations
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Advertisements

Compression Fittings Internal nut type. Compression fittings Rugged and durable. Firm joint using all brass construction For use with plastic and metal.
Drill Press. General Safety Wear your safety glasses at all times Take off all jewelry Do not wear loose clothing Make sure you are the only person in.
Copyright 2008 Kenneth M. Chipps Ph.D. How to Terminate a Corning Unicam Connector Last Update
Building a Sampling Needle for a GasBench Impress your friends! Dominic M. Colosi 2009.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
Design and Manufacturing
Recone Steps for 9900 Series. Tear Down 1 Cut through surround and spiders, remove cone assembly.
Problem with Square WLS Fiber Optic Cable A report on the observations of the physical response to square WLS fiber optic cable being applied and glued.
MINER A NuMI MINER A Director’s Review 10 January 2005 H. Budd Univ. of Rochester Optical Cables and Scintillator Extrusions 10 January MINERvA.
WLS Fiber Pigtails Howard Budd University of Rochester Dec T2K Collaboration Meeting.
MINER A Director’s CD-3b Review 11 June 2007 Kevin McFarland University of Rochester 1MINERvA WBS 1,2,4: Scintillator and Fiber Fiber Milestones: WLS Fiber.
Polishing the Ferrules Howard Budd Sep Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem.
CPR2 Optical Cables Joey Huston Michigan State University …taking optical signals from edge of CPR/crack detectors to PMT boxes mounted on back of wedges.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
1 Z cables with New Fiber Howard Budd University of Rochester Rochester Meeting Jul
Photon Tagging in the Hall D Beamline James McIntyre University of Connecticut 13 May GlueX Graduate Student Workshop Newport News, VA.
Clear Fiber and Wave Guide Fab. Makoto YOSHIDA (Osaka Univ.) July MICE FT
Fiber Attenuation Length Test for MINERvA Jaewon Park University of Rochester Jupiter/MINERvA Meeting, Sep 10, 2005.
Diamonds & R&D on Pigtails Howard Budd Sep
Polishing the Ferrules Howard Budd Aug Visit We visited the place where the polisher is made We got 2 collets which the ferrules fit well in.
Measuring the Ferrules Howard Budd Aug Measuring the Nipple The caliper used to measure the nipple This picture is to show how we measure the.
Polishing the Ferrules Howard Budd Aug Looking at the Old Ferrules I found 3 polished ferrules One was shown in the previous ppt file We photographed.
New Hexagonal Design for MINERvA A. Bodek- Sept Now even counters have a 1.2 solid steel picture frame Around the 3 m wide active target. The.
Diamonds & t2k production Howard Budd Oct
1 Production 2 WLS QC Howard Budd University of Rochester Rochester Meeting Oct
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
1 Fiber Optics LIGHT CRIMP TERMINATIONS USING THE PRENTIUM KIT.
Fiber Optics FIBER CONNECTOR TYPES.
© DIAMOND SA / / 1 Performance & Intermateability Comparison between different ferrule technologies.
Connectors 13/03/2013Collaboration meeting CERN - CSEM1.
Pot 32x16 channels = 512 Readout a pair of rows on one end and the next pair on the other. Connect the fibers to “SiPM cassettes” in 2 row by 16 channel.
1 Coordinate Detector: prototype design The Coordinate Detector (CDET): Three independent vertical planes with 15 cm plastic shield in front, all planes.
BE PREPARED TO TAKE A FEW NOTES TODAY… Pick up the pink sheet at the front.
Waveguide for Station 5 M. Yoshida (Osaka Univ.).
© DIAMOND SA / / 1 ALBERINO Solution. © DIAMOND SA / / 2 E-2000™ ALBERINO Solutions Product description A single and robust component for.
Respiratory Surfaces Making a Model of the Lungs.
Cutting Tools and Procedures Objectives: As a result of this lesson, students will be able to accomplish the following objectives: 1. Identify and select.
MINERvA Mini-Review Debbie Harris Jeff Nelson Kevin McFarland Jeff’s slides version 1.
1 Shield and Fold Mirror Dimensions Michael Sholl 3 February 2005 MODIFIED by Robin Lafever 23 Feb 2005.
GlueX collaboration meeting, Bloomington, May 9-11, Task list for UConn construction contract 1.order clear light guide fibers from Saint Gobain.
SCT Barrel 6 Support Bearing A full-scale model of the barrel 6 support bearing has been machined at UCL (drawing G.Barbier ) It was tried out on both.
January 27  Pick up the 2 pages from the front.  Get your composition notebooks out.
“ FIBER OPTICS BASED COMPUTER NETWORK”
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Prestige Jewelers sales Meeting Sales Presentation.
Prestige Jewelers Sales Meeting Sales Presentation Rob White Period 8.
A 128 fiber Slit-Plate assembly, Kinematic mount
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
Main Parts of a Drilling Machine
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Jewelry 1 Project # 3. Soldering Cutting Filing Sawing Burnishing Pushing Sanding.
Lean Notes Page. Lean Notes What are the four things that need to get written on the reference edge ?_______ ______ ______ ______ This written information.
15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.
Hot to Buy a Diamond Prestige Jewelers Sales Meeting Sales Presentation.
Scroll Saw Operation and Safety
ECAL LED monitoring system upgrade status 04/09/20131.
© DIAMOND SA / / 1 FIBER OPTIC INTERCONNECTIO N TECHNOLOGY.
Grinding Grinding is a process which utilizes the use of abrasive particles bounded together to produce superior surface finishing An abrasive: is a small,
Update on module mounting on staves and stavelets 15/3/11
MINOS Detector Scintillator Module Construction Methods
KNOCK OUT DIAMOND KNOCK-OUT DIAMOND -REMOVAL.
Break down Lance rack Cut one of each of these for each rack
Light Emitting Diodes (LED)
8” MCP Flow for 8/7/ and -003 coated at Fermi and returned to ANL on 8/3/ and -050 packed and ready for Fermi courier to.
Presentation transcript:

Polishing the Ferrules Howard Budd Sep

Polishing Epoxy on the Ferrule We glued fibers in the 10 ferrules that Dave Warner gave us One problem was that for 3 of the ferrules the epoxy backflowed onto the outer edge of the nipple. When it does this the epoxy will flow up to the flat part of the bottom part of the connectors. This means it will not be positioned correctly in the polisher And it will not be positioned correctly in the light detector The epoxy does not chip off easily In does chip off easily in the DDK connectors and Minerva single fiber ferrules (which is delrin, and they are machined.) In thinking about this getting we want a reasonably tight fit of the fiber in the hole to prevent this This is opposite to trying to get good epoxy flow around the fiber

Epoxy Polish We cut the WLS fiber in the back of the this pigtail to try to get the illumination from the from We don’t have any clear 1mm fiber Diamond seems to have sustained some damage

Epoxy Polish Diamond damage seen