Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.

Slides:



Advertisements
Similar presentations
Uli Schäfer Trigger Status JEP (JET/ENERGY PROCESSOR) Komponenten JEM0 (JET/ENERGY MODULE) -Hardware -Firmware JEM1 nächste Tests / Termine Production.
Advertisements

GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Uli Schäfer JEM Status and Test Results Hardware status JEM0 Hardware status JEM1 RAL test results.
GOLD down the drain Uli Schäfer 1 What’s left after Heidelberg.
JFEX Uli Schäfer 1 Uli Intro / overview / issues Draft, will change !!!! Some questions flagged.
ESODAC Study for a new ESO Detector Array Controller.
Uli Schäfer JEM Status and plans Hardware status JEM0 Hardware status JEM1 Plans.
GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
Phase-0 Topological Processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Programmable logic devices / tools Programmable logic devices are digital logic devices, providing combinatorial logic (gates, look-up tables) and flip-flops.
High-speed optical links and processors for the ATLAS Level-1 Calorimeter Trigger upgrade B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz,
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
GOLD Status and Phase-1 Plans Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 BLT – status – plans BLT – backplane and link tester Recent backplane test results Test plans – week June 15.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
JEM upgrades and optical data transmission to FEX for Phase 1 Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer 1 S-L1Calo upstream links architecture -- interfaces -- technology.
Hardware status GOLD Update 02 Feb Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
Uli Schäfer 1 Mainz L1Calo upgrade activities news – BLT hardware/firmware status.
Uli Schäfer JEM Plans Status (summary) Further standalone tests Sub-slice test programme JEM re-design Slice test.
Uli Schäfer JEM0 Status (summary) 3 JEM0s up and running: JEM0.0 used for standalone tests only (Mainz) JEM0.1 fully qualified module0 JEM0.2 (like JEM0.1.
An ATCA and FPGA-Based Data Processing Unit for PANDA Experiment H.XU, Z.-A. LIU,Q.WANG, D.JIN, Inst. High Energy Physics, Beijing, W. Kühn, J. Lang, S.
Uli Schäfer 1 JEM PRR Design changes Post-FDR tests FDR issues.
Uli Schäfer 1 (Not just) Backplane transmission options.
Uli Schäfer JEM0 hardware history and status JEM - The next iteration : many questions, few answers test plans and time scale.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Uli Schäfer JEM Status and plans Firmware -Algorithms -Tools -Status Hardware -JEM1 -Status Plans.
Uli Schäfer 1 JEM: Status and plans JEM1.2 Status Test results Plans.
Uli Schäfer 1 (Not just) Backplane transmission options Uli, Sam, Yuri.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 JEM1: Status and plans Hardware status Firmware status Plans.
Uli Schäfer JEM Status and plans RAL test results Hardware status Firmware Plans.
Uli Schäfer JEM hardware / test JEM0 test programme Mainz standalone RAL sub-slice test JEM re-design Heidelberg slice test.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Uli Schäfer 1 (Not just) Backplane transmission options.
Uli Schäfer JEM Status and plans Firmware Hardware status JEM1 Plans.
Uli Schäfer JEM Status and plans Algorithms Hardware JEM0, JEM1 Tests Plans.
Uli Schäfer 1 FPGAs for high performance – high density applications Intro Requirements of future trigger systems Features of recent FPGA families 9U *
Clock module (and other hardware) - questions rather than answers - post Palaiseau / pre DESY nach dem meeting ist vor dem meeting Uli Schäfer 1.
FEX Uli Schäfer, Mainz 1 L1Calo For more eFEX details see indico.cern.ch/getFile.py/access?contribId=73&sessionId=51&resId=0&materialId=slides&confId=
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Intro to MicroControllers : Stellaris Launchpad Class 4: PCB Schematic Design & Board Layout.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
L1Topo Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, S.Krause, S.Moritz, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Hardware status GOLD Generic Opto Link Demonstrator Assess the use of optical backplane connectivity for use on L1Calo Uli Schäfer 1.
L1Topo-phase0 Uli Schäfer 1. Topo GOLD successfully used to explore technologies and initially verify 6.4Gb/s link integrity over moderate length electrical.
Uli Schäfer 1 JEM Status and plans Hardware -JEM1 -Status Firmware -Algorithms -Status Plans.
CSC Endcap Muon Sorter Mezzanine Board Rice University July 4, 2014.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
S. Rave, U. Schäfer For L1Calo Mainz
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
JFEX Uli Schäfer 1. Constraints & Numerology Assumption: one crate, several modules. Each module covers full phi, limited eta range Data sharing with.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1.
1 SysCore for N-XYTER Status Report Talk by Dirk Gottschalk Kirchhoff Institut für Physik Universität Heidelberg.
JFEX Uli Schäfer 1 Mainz. L1Calo Phase-1 System Uli Schäfer 2 CPM JEM CMX Hub L1Topo ROD JMM PPR From Digital Processing System CPM JEM CMX Hub L1Topo.
L1Topo post review Uli Schäfer 1 Observations, options, effort, plans Uli.
GOLD TESTS (Virtex-6) ● Jitter analysis on cleaned TTC clock ( σ = 2.9 ps) ● Signal integrity: sampled in several positions along the chain ● MGT and o/e.
Multi-Gigabit transmission BLT  GOLD Andreas Ebling, Isabel Koltermann, Jonas Kunze Andi Ebling 1.
Compute Node Tutorial(2) Agenda Introduce to RocketIO How to build a optical link connection Backplane and cross link communications How to.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
Latency / Tilecal o/e converters VME extender Uli Schäfer 1.
Uli Schäfer 1 Mainz R&D activities. Uli Schäfer 2 MZ R&D BLT has been built and tested (backplane transmission only). A few minor issues were found. Possible.
Generic Opto Link Demonstrator
Run-2  Phase-1  Phase-2 Uli / Mainz
Presentation transcript:

Hardware status GOLD Generic Opto Link Demonstrator Uli Schäfer 1

GOLD concept ATCA form factor Limited connectivity on front panel Input links via optical connectors in zone 3 12-channel optos on daughter modules Electrical connectivity up to 10Gb/s in zone 2 Uli Schäfer 2 RTM front ATCA Z2 Z3

GOLD floor plan Uli Schäfer 3 Z1 Z2 Z3 Opto L L L L H H HH 5 * XC6VLX (Processor L, merger M) up to 36 links each Two pairs of XC6VHX (H) 72 links each channel optos on daughter Clock generation 144 multigigabit links in zone 2 (equiv bit / BC) M 890Gb/s total

real GOLD Uli Schäfer 4

GOLD history As reported last time already: Module originally planned for ca. 8 x 6VLX550T with opto backplane connection only Converted to a mixed scheme 6VLXT / 6VHXT (6.5/10Gbps) Added electrical backplane connectivity in zone 2 Learned about power consumption of Virtex 6  re-design of on-module power distribution Currently designing for ~450W per module Difficult to find power converters with small footprint, high current and a lead time below 40 weeks Uli Schäfer 5

Just a few issues with the tools… Mainz (Bruno) used to Cadence design tools for 10 years. Designs have got more complex since. Tools have apparently not kept pace: It is not possible to turn differential pin pairs of a device single ended. Need to be defined during initial creation of device symbol – that strongly limits the capabilities of an FPGA to resolve routing issues at board level, if both differential and single ended lines are used in a design Autorouting differential pairs is basically impossible since automatic pin swap is not supported on differential signals. With given signal layer count (9) autorouter stopped at 50% unrouted signals.  GOLD is being hand-routed now ! Uli Schäfer 6

Routing Uli Schäfer 7

GOLD status Schematics and layout well under way Xilinx 6VLXT waiting on the shelf Xilinx 6VHXT not yet available 2 daughter modules (opto link module and clock module) will have to be designed Decided against SNAP12 devices due to lack of availability AVAGO 10Gb/s 12-channel optos (2*T, 2*R) have been purchased Some further GOLD related activities at MZ: Reinhold working on 6U VME serialiser for GOLD module control via VME bus Andi has been successfully fighting link latencies on a V5: reduction by ~1 bunch tick when giving up 8b/10b encoding and reducing payload Uli Schäfer 8