FLOOR CONSTRUCTION Meeting 8 Study Program: S0673 / Building Construction II Period: 2007.

Slides:



Advertisements
Similar presentations
How to read plans, The designer has the vision or dream of what to create on stage. Drafting allows the designer to communicate the dream to craftspeople.
Advertisements

Instructions for building the Round house and Roman villa
TECHNOLOGY AND ENGINERRING SKILL STUDY PROGRAM : BUILDING TECHNOLOGY SKILL COMPETENCE : DRAWING BUILDING TECHNOLOGY.
Heavy Concrete Construction Formwork
Modeling methods 2 Matakuliah : T0952 – Multimedia 3D Modelling and Animation Tahun: 2009.
PICTURE IRON AND RESTATING Meeting 13 Study Program: S0673 / Building Construction II Period: 2007.
2015 Supported by: TITLE Click to edit Master Subtitle style.
CONSTRUCTION BLUEPRINT READING
Ma.Carlota Fermín Jorge Matheus
LIGHT STEEL FRAME Meeting 11 Study Program: S0673 / Building Construction II Period: 2007.
WOOD JOINTS Items to consider when choosing a wood joint.
ANTECEDENT Meeting 1 Study Program: S0673 / Building Construction II Period: 2007.
CONCRETE STAIRS Meeting 6 Study Program: S0673 / Building Construction II Period: 2007.
Wall Form Design Example (Continued)
1 Presentation 5 NOTATION CONSTRUCTION MATERIAL IN A PICTURE.
Next Act Wall: 3 Different Panels All wood is 2x4 unless otherwise specified.
PILING FOUNDATION Meeting 3 Study Program: S0673/Building Construction II Period: 2007.
ROOF CONSTRUCTION Meeting 9 Study Program: S0673 / Building Construction II Period: 2007.
FLOOR Meeting 7 Study Program: S0673 / Building Construction II Period: 2007.
KINDS OF METAL CORROSION PERTEMUAN 10 Matakuliah: S0372 – Kimia Teknik Sipil Tahun: Ganjil 2007/2008.
WOOD STAIRS Meeting 5 Study Program: S0673 / Building Construction Period: 2007.
Stairs Meeting 4 Study Program: S0673 / Building Construction II Year: 2007.
1 Presentation 19 CORNER EXTENSION. 2 Learning Outcomes By the end of this meeting, student will expected to be able to : Student can explain building.
FOUNDATION Meeting 2 Study Program: S0673 / Building Construction II Period: 2007.
ROOF of WOOD CONSTRUCTION Meeting 10 Study Program: S0673 / Building Construction II Period: 2007.
1 Presentation 23 WINDOW AND DOOR. 2 Learning Outcomes By the end of this meeting, student will expected to be able to : Student can explain building.
1 Presentation 15 WOOD UPON WHICH BUILDING. 2 Learning Outcomes By the end of this meeting, student will expected to be able to : Student earn building.
1 Presentation 21 EXTENSION MEETING OF CORNER < 90 0.
1 Presentation 13 FORMATION COAT BRICK (WALL TYING)
Module 3 – e-Learning Folios. 2 Overview myclasses An e-Learning Folio (or eLF) is a means of managing (collecting, organising and presenting) activities,
Drafting Rear Elevations. Start with outer frame when drafting standard flat. Heights are generally in multiples of 2’-0”. Outer Frame.
 stone work  Masonry is the building of structures from individual units laid in and bound together by mortar; the term masonry can also refer to the.
BEAMS,COLUMS AND LINTELS
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
Sheet Metal Development Copyright © Texas Education Agency, All rights reserved.
Architectural Dimensioning Part 2
REINFORCED CONCRETE AND IRON RESTATING. Meeting 12 Study Program: S0673 / Building Construction II Year: 2007.
Floor Framing Unit 29.
Wall and Ceiling Construction
Wood Construction Materials Hardwood Comes from deciduous trees such as oak, birch, walnut, maple, and hickory.
Click to edit Master title style. Do You Hear What I Hear Said the night wind to the little lamb “Do you see what I see?” Way up in the sky little lamb.
Shear Walls Section 3.
Roof and Ceiling Framing
Unit 5 Structural Strength & Stability
Fundamentals of Structural Detailing
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Using the Work Item List Click on the Workbench link to open up your Work Item List.
An identifiable path of a point moving in space. It can vary in width, direction, and length.
Module 7 Unit 22 – Welding Prints. Learning Objectives Identify a welding symbol. List the elements of a welding symbol. Explain the meaning of a welding.
Biosimilar (Insulin) – Competitive Landscape and Market & Pipeline Analysis, 2016 DelveInsight’s, “Biosimilar (Insulin) – Competitive Landscape and Market. Request for sample of this research report:
Here is a picture of a Geoboard. You can make shapes on the board by wrapping a rubber band around the nails.
2016 TITLE Click to edit Master Subtitle style Details of your team PRESENTATION OUTLINE What do you think is new or different about your idea?
Garden Box Design Plans. Garden Box Materials List QTY (Lumber)* 2”x4”x120”(10’) - Cut one of these boards into two 41” pieces and two 17” pieces.
Floor Framing.
Drafting 2 (Arch) Quiz Review #4 Quiz Review. 1. What is the difference between a pier and column? Bearing capacity Soil impact Concrete block Reinforcing.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
Section 2 Safety, Tools and Equipment, Shop Practices Unit 6: Fasteners.
Fasteners Nails Metal fasteners driven into the material it holds.
Preparation of Tools.
Framing Vocabulary Stud: upright beams in the framework of a building
PowerPoint Template Click to edit Master subtitle style.
Click to Add Title Click to Add Subtitle.
CEN 180: Civil Engineering Drawing II
Flood: Build a Stronger Plinth
Building section A vertical cut or slice through a structure that illustrates the type of foundation, wall, and roof construction to be used.
Testing and Grading Materials
Presenter Tony Bosnich 2015
Instructions Clear any pre-set text boxes on your slide.
. The sheathing for a floor form is secured to the beam or girder side when forming a monolithic beam or girder and floor slab systemBlock bridging is.
Presentation transcript:

FLOOR CONSTRUCTION Meeting 8 Study Program: S0673 / Building Construction II Period: 2007

Bina Nusantara By the end of this meeting, expected student will be able to : Student can explain elementary floor construction and mount from concrete along with details. Learning Outcome 3

Bina Nusantara Items 1: Link mains log Detail at wall. Items 2: Log Compile Items 3: Log construct Outline Items 4

Bina Nusantara Mains logs, its back parts stand up above columns or wall. Mains logs ever unfold short side. At one particular floor plate to have big require to be strengthened with floor logs and child log namely strong log at compared to smaller fairish floor of king sized mains log. Location of Logs Floor. 5

Bina Nusantara 6

7

Wood logs have surface size measure and limited length. Become if used as floor log can only be used to unfold just small (4m - 5m). If to unfold big and remain to be used by wood, hence can be made by log compile or made by form construct or earn is also used lengthwise especial logs unfold longest constructively contributor pillars. 8

Bina Nusantara Log Compile 9

Bina Nusantara Wood Construct 10

Bina Nusantara Log with Contributor. At floor mount from wood, need equipments: Yoke at the end of planted log into wall. Obligatory yoke two overall log most edge. 11

Bina Nusantara Yoke fasten log through nail; yoke fasten wall through to inform against brick couple or concrete. Tip of planted yoke bended by elbow with its plate area of angular shape 45  to straightening direction. 12

Bina Nusantara Click to edit Master title style 13

Bina Nusantara Blind Yoke : Yoke do not see from outside and also from within. Yoke Penetrate : Yoke penetrating wall till see from outside, during this secretory shares do not destroy view. This yoke type enough strength. Yoke of Log 14

Bina Nusantara 15

Bina Nusantara Common function of yoke are : Specifying at domiciling which is log remain to be pertinent at place which wish to be inculcated. Yoke attached at one of the back part or both its back part. And this yoke have to earn to fasten to become one better, at materials where that yoke is inculcated. 16

Bina Nusantara Ichnograph Floor Level. 17

Bina Nusantara Detail A 18

Bina Nusantara Detail B 19

Bina Nusantara Detail C 20

Bina Nusantara 21

Bina Nusantara 22

Bina Nusantara 23

Bina Nusantara Location of board direction dance at variance with location of floor log. Between log floor with given certain places of lasing log. 24

Bina Nusantara Link Log floor with Pillar Isolator. 25