Customer Service in Pull Production Systems Mark L. SPEARMAN Presented By: Ahu SOYLU.

Slides:



Advertisements
Similar presentations
Operations Scheduling
Advertisements

Chapter 15 - Material & Capacity Requirements Planning(MRP/CRP)
CONWIP (A pull alternative to kanban principle)
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
CHAPTER FIFTEEN JUST-IN-TIME SYSTEMS Chapter 15 Just-In-Time Systems.
Lean Supply Chains Chapter Fourteen McGraw-Hill/Irwin
Chapter 14 JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Fundamentals of Operations Management 4e© The McGraw-Hill Companies, Inc., –1 Managerial Issues Using JIT as a tool for controlling the flow of materials,
Dependent Inventory: Material Requirements Planning BA 339 Mellie Pullman.
CONWIP Systems CONWIP – Constant work-in-process
Operations Management Just-in-Time Systems Supplement 12
Just-In-Time “Eliminate Waste”.
An overview of design and operational issues of kanban systems M. S. AKTÜRK and F. ERHUN Presented by: Y. Levent KOÇAĞA.
Push and Pull Systems: Lecture 12
Chapter 16 - Lean Systems Focus on operations strategy, process, technology, quality, capacity, layout, supply chains, and inventory. Operations systems.
CHAPTER 14 Just-In-Time Systems.
S12-1 Operations Management Just-in-Time and Lean Production Systems Chapter 16.
JIT and Lean Operations
JIT and Lean Operations. MRP (push) and JIT (pull) system PULL SYSTEM PUSH SYSTEM A PUSH system where material is moved on to the next stage as soon as.
JIT and Lean Operations
© Improvement Initiatives (used with permission of author) freeleansite.com The Lean Enterprise Lean Foundations Continuous Improvement Training Lean Foundations.
Murat Kaya, Sabancı Üniversitesi 1 MS 401 Production and Service Systems Operations Spring Just-in-Time (JIT) Manufacturing Slide Set #14.
Operations Management
1 Chapter 16 Just-In-Time Systems. 2 JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and.
JIT and Lean Operations
Just-In-Time Manufacturing David Comita Arielle Herold Jaslyn Moore Shanelle Williamson.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. JIT and Lean Operations.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 15 JIT and Lean Operations.
1 DSCI 3123 Inputs and Outputs to Aggregate Production Planning Aggregate Production Planning Company Policies Financial Constraints Strategic Objectives.
OMG Operations Management Spring 1997 CLASS 10: Process and Inventory Control (2) Harry Groenevelt.
1. Facility size 2. Equipment procurement Long-term
Just-in-Time (JIT) and Lean Systems Chapter 7. MGMT 326 Foundations of Operations Introduction Strategy Quality Assurance Facilities Planning & Control.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
MBA.782.J.I.T.CAJ Operations Management Just-In-Time J.I.T. Philosophy Characteristics of J.I.T. J.I.T. in Services J.I.T. Implementation Issues.
LEAN system.
Introduction to Accounting Information Systems
JIT and Lean Operations
CONWIP (A pull alternative to kanban principle)
Why Kanban Systems Fail and What You Can Do About it
CONWIP (A pull alternative to kanban principle) Main resources : Mark Spearman, David Woodruff and Wallace Hopp Northwestern University, Evanson, Illinois,
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Managing Kanban Systems Two primary control parameters for a Kanban System. Kanban container size (n i ) Number of Kanbans (k i )
Chapter 12 Just-in-Time and Lean Manufacturing. What is JIT? (Just-in-Time) An operations philosophy involving many techniques for improving the effectiveness.
JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
Just-In-Time Systems. JIT/Lean Production Just-in-time: Repetitive production system in which processing and movement of materials and goods occur just.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 15 Lean Operations.
1 Control of Production-Inventory Systems with Multiple Echelons.
1 Lean Office - Pull Kanban, Just in Time, Standardized Work
Lean Production.
13-1 Learning Objectives  Explain what is meant by the term lean operations system.  List each of the goals of JIT and explain its importance.  List.
JIT and Lean Operations Group Members:. JIT/Lean Production Just-in-time (JIT): A highly coordinated processing system in which goods move through the.
LEAN system. Value That customer is willing to pay That changes products color, function, shape, other attributes so that the product is getting closer.
CONWIP (A pull alternative to kanban principle)
8.0 LEAN Chuah Shu Chin B Jennise Tan Teng Teng B Yeow See Leong B
McGraw-Hill/Irwin Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. 15 JIT and Lean Operations.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 15 JIT and Lean Operations.
16-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 9 JIT and Lean Operations.
Manufacturing planning & control : Integration of MRP & JIT Prepared by: Ankit P. Sarvaiya (09CAD14)
The Revolution of Just-In-Time (JIT) and Lean Manufacturing
LESSON 2 Push and Pull Systems
Push and Pull Production Systems
Inputs and Outputs to Aggregate Production Planning
An introduction to Factory Physics
Lean Manufacturing and Just-In-Time Philosophy
The Revolution of Just-In-Time (JIT) and Lean Manufacturing
Just-In-Time and Lean Production
Chap 10 Learning Objectives
Presentation transcript:

Customer Service in Pull Production Systems Mark L. SPEARMAN Presented By: Ahu SOYLU

Outline The Comparison of Pull & Push Systems Overview of Pull Systems Customer Service in Pull Systems Customer Service in CONWIP Comparison of Pull Systems with CONWIP Conclusion

The Success of Pull Systems The success of Japanese manufacturing systems has attracted attention The system is a set of techniques known as Just-In-Time (JIT) An integral feature of JIT is the use of pull shop floor control systems There are still a number of issues that require study; such as customer service.

Push vs. Pull In a push system customer service is measured with well known methods like the fraction of jobs on-time and the average tardiness. A job is on-time if the time to complete a job is less than or equal to its lead time. Tardiness is the positive difference between the completion time and the due date of a job (T j =max{C j -d j,0}).

Push vs. Pull In a pull system, each process is both a supermarket for downstream processes and a customer to preceding processes. A supermarket is a place where a customer can get 1. What’s needed 2. At the time needed 3. In the amount needed Service measures are the probability of stockout, the expected time to fill demand, the expected backlog of orders.

Push vs. Pull MRP and Master Production Schedule are used to control production Input/Output control provides capacity check Controls throughput and measures WIP “The day is not done until every job has been completed” The due date of a new job is established by considering the current production quota and the current backlog of jobs Controls WIP and measures throughput

Push vs. Pull A system employs push if it schedules the release of work a priori. A pull system authorizes the release of work based on current plant conditions A hybrid system involves aspects of both.

Two-card Kanban System

Benefits of Pull System All workers can immediately see what work needs to be done Excessive WIP is not pushed to the system whenever the system capacity is overestimated It is easier to control WIP than output When the system works well, there is no need to schedule production Adapting the production environment to improvements is easier

Kanban is not for everybody The conditions necessary for Kanban to work well are: “Smooth” production involving a stable product mix “Smooth” production involving a stable product mix Short setups Short setups Proper machine layout Proper machine layout Standardization of jobs Standardization of jobs Improvement activities Improvement activities Autonomation (autonomous defect control) Autonomation (autonomous defect control)

Modeling a Pull System A simplified -one card- version of the Kanban system is examined Assumptions The cards move instantly so that when a demand arrives to an idle system, production will start at each station immediately The cards move instantly so that when a demand arrives to an idle system, production will start at each station immediately Last station has always parts Last station has always parts The standard containers are small and multiples of the container size The standard containers are small and multiples of the container size

Modeling a Pull System The service measure will be the expected time required to fill the demand. The probability of stockout is not sufficient in terms of being a service measure because in a pull system, the longer the stockout occurs, the more likely to result in disruption of downstream processes. N single server stations in series producing a single product.

Modeling a Pull System S i ~F i : The service times for station i {S ij }: set of service times D j : Times that demands in the form of kanbans from an external source are received Demands are not iid T(i,j): The time the jth container is sent from station I m i : number of kanbans attached to the standard containers residing in the stockpoint of station i

Modeling a Pull System These equations represent the relations between the completion times, service times and the demands in the kanban system.

Measures of Customer Service The time to satisfy the jth demand The expected time to satisfy demand after the nth demand Average time to satisfy demand

Some Results T(i,j) is nonincreasing in m i T(i,j) is increasing convex in S ik, k=1,2,…,j τ j is increasing convex in S ij

Stochastic Ordering in Kanban Systems Consider two kanban systems k=1,2. Then S i (1) ≤ st S i (2) implies U (1) ≤ U (2) Consider two systems having processing times S ij (k) =θ i (k) + ξ j, k=1,2; i=1,…,N; j=1,2,…, where θ i (k) is a constant and ξ j are iid random variables with zero mean. Then θ (1) ≤ θ (2) implies U (1) ≤ U (2) For systems with processing times whose means represent a location parameter, faster processing times imply a better service.

Stochastic Ordering in Kanban Systems These results deal with variability reduction. Consider two kanban systems j=1,2. If S i (1) ≥ icx S i (2), i=1,2,…,N implies T (1) (0,j)≥ icx T (2) (0,j), j=1,2,… and U (1) ≥ icx U (2) If S ij (1) ~F and S ij (2) ~G where F and G have the same mean and where F crosses G at most once and from below, then U (1) ≤ U (2) If S ij (k),k=1,2 ~N(  (k),  (k) ) and  (1) <  (2) then U (1) ≤ U (2)

The Effect of Increasing Inventory Levels Consider two kanban systems, j=1,2. Then m i (1) ≥ m i (2) ; i=1,…,N implies U (1) ≤ U (2) j=1,2. Then m i (1) ≥ m i (2) ; i=1,…,N implies U (1) ≤ U (2) Tradeoff of inventory vs. service Although extra inventory improves service, it also reduces flexibility Also, inventory hides major sources of variability and allows us to live with problems that could be eliminated.

The Effect of Increasing Inventory Levels In a make-to-order push system with fixed lead time and constant throughput rate increasing WIP levels will degrade customer service. Little’s Law:

CONWIP Controlling WIP is more robust than controlling throughput The fact that WIP is bounded is more important than the practice of “pulling” everywhere CONWIP maintains a constant amount of WIP on each production line and does not pull at every station. Line production quantities are measured in terms of standard parts. CONWIP can be used when significant setup times exist

CONWIP While the pull in kanban occurs between stations and is to replenish the particular part that has just been used, the pull in CONWIP is over the entire line and for the parts having the same routing. CONWIP is similar to a closed queueing network. The flow time and throughput rate tend to be less variable than an equivalent open network with the same output.

Push-Pull-CONWIP

Modeling CONWIP These equations represent the relations between the completion times, service times and the demands in the kanban system.

Results T(i,j)- S ij ≥T(i-1,j) – S i-j, for i=1,2,…,N; j=1,2,…

Discussion CONWIP behaves like a closed queueing network, kanban looks like a closed queueing network with blocking. With the same card counts, CONWIP tends to have higher WIP CONWIP can dominate kanban in terms of both service and average WIP A simulation study is performed and it is seen that CONWIP exhibited customer service that was statistically superior.

Discussion Both CONWIP and kanban limit WIP growth. Implementation of CONWIP is simpler than kanban. CONWIP lines can split into many segments, then kanban is a subset of CONWIP. So, kanban cannot be superior to CONWIP.

Conclusion Customer service in both kanban and CONWIP production systems is improved by: Faster machines Faster machines Extra WIP Extra WIP Less variable processing times Less variable processing times CONWIP systems have better customer service than do pure kanban systems.