M2: Team Paradigm :: Milestone 3 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.

Slides:



Advertisements
Similar presentations
Status Specification definition (done) Architecture
Advertisements

M2: Team Paradigm :: Milestone 6 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
:: Discrete Cosine Transformation
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 6: Feb. 25 th Simulation Overall Project Objective: Design an Air-Fuel Ratio.
Team M1 Enigma Machine Milestone March, 2006 Design Manager: Prateek Goenka Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #7 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Feb 28 th, 2005 Functional.
Viterbi Decoder: Presentation #10 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 10: 5 th April Final Design Corrections.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
M2: Team Paradigm :: Final Presentation 2-D Discrete Cosine Transform Team Paradigm (Group M2): Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #2 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 Jan 24, 2005 Architecture.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VI: February 25 h 2004.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Huffman Encoder Project. Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee Huffman Encoder Project Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IX: March 30 th 2004.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 27 Overall Project Objective : Dynamic Control.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon. Sept 29 System Hardware Component Diagram.
M3: ProDiver 525 *Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Stage : 2 Feb 04 Size Estimates/ Floor Plan Overall.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
M2: Team Paradigm :: Pre-Final Presentation 2-D Discrete Cosine Transform Team Paradigm (Group M2): Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan.
Viterbi Decoder: Presentation #2 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
1 Team M1 Enigma Machine Milestone April, 2006 Adithya Attawar (M11) Shilpi Chakrabarti (M12) Mike Sokolsky (M14) Design Manager: Prateek Goenka.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage III: February 11 h 2004.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage VIII: March 24 th 2004.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
M2: Team Paradigm :: Milestone 6 Update 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager:
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Sprinkler Buddy Presentation #7: “Redesign of Adder Parts And Layout of Other Major Blocks” 3/07/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam.
Viterbi Decoder: Presentation #6 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 23 rd Feb Component Simulation Design.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 5: Feb. 18 th Component Layout Overall Project Objective: Design an Air-Fuel.
Viterbi Decoder: Presentation #5 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 5: 18 th Feb Component layout Design Manager:
M2: Team Paradigm :: Milestone 3 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 4: Feb. 11 th Gate Level Design Overall Project Objective: Design an Air-Fuel.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: 26 th January 2004.
M2: Team Paradigm :: Milestone 5 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
M2: Team Paradigm :: Milestone 4 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #6: “Optimized Schematics and Component Layout” 2/28/2007 Team M3 Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage III: February 9 h 2004.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 06 Overall Project Objective : Dynamic Control.
Viterbi Decoder: Presentation #4 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
M2: Team Paradigm :: Milestone 2 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
M2: Team Paradigm :: Milestone 8 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Encryption Transaction with 3DES Team W2 Yervant Dermenjian (W21) Taewan Kim (W22) Evan Mengstab(W23) Xiaochun Zhu(W24) Objective: To implement a secure.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage IV: February 18 h 2004.
GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 06 Overall Project Objective : Dynamic Control.
Random Number Generator Dimtriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
Viterbi Decoder: Presentation #9 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 9: 29 nd Mar Chip Level Simulation Design.
Viterbi Decoder: Presentation #3 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
Lucas-Lehmer Primality Tester Presentation 2: Architecture Proposal February 1, 2006 Team: W-4 Nathan Stohs W4-1 Brian Johnson W4-2 Joe Hurley W4-3 Marques.
Department of Communication Engineering, NCTU 1 Unit 5 Programmable Logic and Storage Devices – RAMs and FPGAs.
Group M1 - Enigma Machine Design Manager: Prateek Goenka Adithya Attawar (M1-1) Shilpi Chakrabarti (M1-2) Zavo Gabriel (M1-3) Mike Sokolsky (M1-4) Milestone.
Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee [M2] Huffman Encoder Project Presentation #3 February 7 th, 2007 Overall.
-1- Soft Core Viterbi Decoder EECS 290A Project Dave Chinnery, Rhett Davis, Chris Taylor, Ning Zhang.
Digital readout architecture for Velopix
ADPCM Adaptive Differential Pulse Code Modulation
Alpha Blending and Smoothing
Presentation transcript:

M2: Team Paradigm :: Milestone 3 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping Zhan Feb 2 nd 2004 Size estimates/Floor plan

M2: Team Paradigm Team Paradigm

M2: Team Paradigm Project status  Design Proposal (Complete)  Architecture Proposal (Complete) :Algorithm description (Done) :High level simulation (Done) :Mapping algorithm into hardware (Done) :Behavioral Verilog and test bench (Done, bug fixed)  Size estimates/floor plan (Complete) :Structural Verilog (Done) :More accurate transistor count (Done) :Floor plan (Done)

M2: Team Paradigm Design decisions  Do not include motion prediction  Go with 2-D DCT  Use SRAM  No pipelining  Will not run in real-time

M2: Team Paradigm 1D DCT architecture out_data(16) Selector RR Parallel to serial Control logic ROM in_data(16) in_valid out_valid out_ready out_done clk vdd vss reset Register file 8x16 Bit address generator Bit address generator ROM

M2: Team Paradigm 2D DCT : Two 1D DCT can operate in pipeline to boost throughput performance, this requires RAM can be read and wrote at the same time and each 1D DCT module read/write the RAM in row and column order alternatively. 1D DCT (on rows) 1D DCT (on columns) Transpose RAM Data in Data out Control logic

M2: Team Paradigm Transistor count and performance estimation : adderregisterROMControl logictotalpins 4x(15x24+14) 4x374= x16x15 =4320 8x16x2 = ~10.5k40 1DDCT module : 2DDCT = 2x1DDCT + SRAM ~ 29k throughputlatency 8 samples/64 cycle528 cycle Shift RegisterMuxesSRAM mux(44x20)+ ff(18x15)=

M2: Team Paradigm New vs old estimation adderregisterROMControl logicSRAMTotal k Old estimation: adderregisterROMControl logicMuxesSRAMTotal k New estimation

M2: Team Paradigm 1D DCT Simply repeat on rows to make 2D - Selector R0R7 R0 Bit Address Generator R0R7 Rom0Rom7 R5R6 S1 S0 Parallel to Serial bit

M2: Team Paradigm Verilog

M2: Team Paradigm Verilog

M2: Team Paradigm Layout Size Proposal :Using a reference of an inverter -5u x 2.3u =11.5u total area -Contain 2 transistors :Our design has total of approx 29k -add space for wiring :Total area estimation of around 162, ,000 :=190,000um 2

M2: Team Paradigm Layout Proposal 1D DCT MUX 4x1 32' Sub Add DeMux 4x1 DeMux 4x1 Reg 8x16' R7 R0 R6 R1 R5 R2 R4 R1 Take bits Take bits Add Rom Shift Reg Control Logic approx. 70,000um 2

M2: Team Paradigm Overall floor plan 1D DCT SRAM 1D DCT Dimensions: 550 x 350 =192500um 2

M2: Team Paradigm Interconnect :Metals 1 & 2 used locally -Metal 1 is horizontal -Metal 2 is vertical :Metals 3 & 4 used globally -Metal 3 is horizontal -Metal 4 is vertical :Metal 4 reserved for clk and rst

M2: Team Paradigm ::conclusion & questions :Roughly 29k transistor count :Will try to optimize design further and enhance performance