GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S 4.1.7 LAT.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
GLAST LAT ProjectOnline Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Elex Overview-Management V6 1 GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectGSFC Monthly, 15 Dec 2003 LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering.
GLAST LAT ProjectDOE Rebaseline Review, February 13, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Chief Engineer.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST June 8, 2000, P. Roger Williamson, BFP - 1 Balloon Flight Planning Roger Williamson June 8, 2000.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S September Status
GLAST LAT Project Quarterly Review, Aug. 14, 2001 Gunther Haller1 GLAST Large Area Telescope: Electronics, DAQ & Flight Software Gunther Haller Stanford.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 2, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 1, Version 3 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, DAQ & FSWV8 1 GLAST Large Area Telescope: Gunther Haller SLAC LAT Chief Electronics.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectGASU TRR, July, DAQ & FSWV1 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650)
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectEGSE Peer Design Review, August 17, S. WilliamsEGSE Overview Electrical Ground Support Equipment Overview Scott Williams Stanford.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project4.1.7 G. Haller V11 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectTower Power Supply Review Sept 22, 2003 Gunther HallerPart 3, Version 4 1 GLAST Large Area Telescope: Electronics, Data Acquisition &
GLAST LAT ProjectPDU/GASU MRR, February 4, DAQ & FSWV3 1 GLAST Large Area Telescope: B. Estey, G. Haller, D. Marsh SLAC
DAQ Development P. Roger Williamson Hansen Experimental Physics Laboratory Stanford University GLAST Collaboration Meeting GSFC February 10, 1999.
GLAST LAT Project – Cost and Schedule ReviewJanuary 27, 2004 AntiCoincidence Detector 1 GLAST Large Area Telescope: Cost/Schedule Review January 27, 2005.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 G. Haller Electronics V5 1 GLAST Large Area Telescope: Electronics, Data.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT Project4.1.7 G. Haller V2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S April Status Gunther.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 W. N. Johnson Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectGLAST Flight Software, 7 February 2003 FSW Development Plan 1 GLAST Large Area Telescope: Instrument Flight Software Development Plan.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: Gunther Haller SLAC (650)
GLAST Large Area Telescope Instrument Flight Software Jeff Fisher, FSW Manager Flight Unit Peer Review Overview/Management/Schedule September 16, 2004.
GLAST LAT Project Test Beam Meeting, Apr 18, 2006 E. do Couto e Silva 1/2 Beam Test Hardware Delivery Status Eduardo do Couto e Silva February 18, 2006.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 D. Nelson 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
EPU load – same as SIU load except…
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V41 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S LAT meeting- V4 July 17, 03 Gunther Haller, JJ Russell (650) Gamma-ray Large Area Space Telescope

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V42 Key Milestones, new schedule (1) TEM Pre-qual (with ASICs, everything as flight except board- material & non-flight ACTEL’s) Used for new EGSE stands Oct 1, 03 TEM Qual (flight material, flight FPGA, test of flight procurement package) Dec 1, 03 TEM, 1 st Flight (I&T AV MS was 3/15/04)June 15, 04 TEM, Last Flight (I&T AV MS was 9/24/04)Aug 15, 04 Tower Power Supply EM (new design with MAXIM DC/DC converters) Used for new EGSE stands Oct 1, 03 TPS Pre-qualNov 15, 03 TPS QualDec 15, 03 TPS, 1 st Flight (I&T AV MS was 3/15/04)June 15, 04 TPS, Last Flight (I&T AV MS was 9/24/04)Aug 15, 04 GASU EM2 (non-flight memories, FPGA’s), Used for ACD multiple FREE test Nov 1, 03 GASU Pre-qual (flight mem, non-flight FPGA’s)Feb 04 GASU QualMay 04 GASU Flight (I&T AV MS was 9/20/04)Aug 15, 04

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V43 Key Milestones (2) PDU EM (non-flight FPGA)Sept 15, 03 PDU Pre-qual (non-flight FPGA’s)Feb 04 PDU Qual (flight FPGA)May 04 PDU Flight (I&T AV MS was 9/20/04)Aug 15, 04 LAT Comm Board EM (PMC Card). Used for new EGSE standsAug 30, 03 LCB EM (cPCI card) Used for DAQ Internal test-standsSept 15, 03 LCB Pre-QualFeb 04 LCB QualMay 04 LCB Flight (I&T AV MS was 9/20/04)Aug 15, 04 Storage Interface Board EM (cPCI card) Used for DAQ Internal test-stands Sept 15, 03 SIB Pre-qualFeb 04 SIB QualMay 04 SIB Flight (I&T AV MS was 9/20/04)Aug 15, 04

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V44 Key Milestones (3) Crate Backplane EMSept 15, 03 CBP Pre-qualFeb 04 CBP QualMay 04 CBP Flight (I&T AV was 9/20/04)Aug 15, 04 Software EM1 (all SW to completely support TEM-based test- stand including monitoring, in addition filtering, etc) Sept 30, 03 Software EM2 (to run testbed and ACD multi-FREE, official release later) Dec 15, 03 Software FU (1 st version) April 04 Software FU (full version, official release later) Oct 04 EGSE TEM (with ASICs) test-stands ready (with EM1 FSW) Oct 1, 03 EGSE AEM GASU test-stands ready (with EM2 FSW)Dec 15, 03

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V45 Main Interdependencies TEM to TKR & CAL Oct 1, 03 GASU to ACD Dec 15, 03 TKR MCM (9) with latest ASICs to Elex (non-flight fab) Sept 1, 03 TKR MCM (36 each) with cables!, first flight production batch to Elex Sept 1, 03? CAL AFEE (8 each) with flight ASICs to ElexNov 1, 03? ACD FREE (12 each) to Elex (need ACD ASICS) Nov 1, 04? Calorimeter Mini Twr (with crystals, full tower) to ElexSept 1, 03? TKR Mini Twr (with 3-X and 3-Y layers) to ElexSept 1, 03? Need to keep these and/or make additional set TKR Mini TWR does need at least 4-X, 4-Y)

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V46 Flight Hardware Procurements Req’s for Omnirels, MAXIM’s, EEPROM in purchasing Writing req’s for Actels, MOSFET’s, memories, EMI filters, DC/DC hybrids

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V47 Flight Hardware Manufacturing First Board to be fabricated is TEM Qual –Need by Dec 1, 03 –Package for fab and assembly must be placed by Sept 1, 03 All assembly drawings final by Aug 15, 03 Tower Power Supply Module 2 weeks behind TEM Others ~ Jan 04

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V48 Engineering Model Testing Continuous testing up to commitment for flight fab (of course continuous beyond that but changes have impact) Must have full set of front-end electronics to verify DAQ hardware/software Must have CAL/TKR Mini Twr with detectors to debug/test/verify DAQ system including trigger hardware & software

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V49 Open Flight Design Issues Detailed routing of wires in GASU (~3,000 wires in enclosure) New Tower Power supply circuit needs to be tested

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V410 Cost/Schedule Status Pretty much on schedule (except TEM and TEM-PS, 4 weeks late, FSW is being assessed) Cost: overrun will occur in –Front-end simulator Had to be redone after move of project to SLAC –Storage interface board Added in each crate to simplify software –FSW needs more man-power –Tower Power supply cost being assessed –EGSE test-stands

GLAST LAT Project4.1.7 July 17, 03 LAT Meeting G. Haller V411 Issues/Concerns Concern of performance of Tower Power Supply –Need prototype to evaluate (Oct 1, 03) –Must connect to CAL and TKR tower and perform noise measurements Needs to be done by Cal and TKR system Concern that TKR and CAL will interfere with each other when integrated in TKR – CAL – TEM package (EMI/EMC) –Need detailed plan to test Who is taking care of this? Concern that DAQ HW and FSW may not have continuous access to TKR and CAL Mini TWR instrumented with detectors –Must plan for continuous access –Need more than 3-X and 3-Y layers Concern that FSW is late –Need to add promised man-power