Detector Systems Update MICO April 7, 2008. MICE Detector Systems  CKOV u Installed, first signals seen  TOF0/1 u 8 new H6533MOD assembly PMTs have.

Slides:



Advertisements
Similar presentations
MICE CM January 2009Jean-Sébastien GraulichSlide 1 EMR Issues o Detector o Front end electronics o Funding and Plan Jean-Sebastien Graulich, Geneva.
Advertisements

Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
LHCf: a LHC Detector for Astroparticle Physics LHCf: a LHC Detector for Astroparticle Physics Lorenzo Bonechi on behalf of the LHCf Collaboration * University.
MICE Beam Monitors - STATUS MICO Meeting January 9, 2008 Alan Bross.
M. Bonesini - VC TOF status M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini1 TOF design updates M. Bonesini – INFN Milano.
Linda R. Coney – 24th September 2009 MOM Update End of Sept Run Linda R. Coney 05 October, 2009.
Detector Systems Update MICO April 23, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u Tests to identify the source of the problems in the.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
Detector Systems Update MICO May 19, MICE Detector Systems  Beam Monitors u Over heating of sender boards has been s Solution.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Detector Systems Update MICO April 14, MICE Detector Systems  CKOV u Nothing new  TOF0/1 u H6533MOD PMT assembly reliability is the main concern.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO May 5, 2009.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
CMPB Alain Blondel 14 April STATUS OF MICE.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
MICE VC March 2009Jean-Sebastien GraulichSlide 1 EMR Status o Introduction o News o Detector Design o Simulations o Responsibilities o Plan Jean-Sebastien.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 M. Bonesini - CM 25 RAL 5/11/09 PID status report M. Bonesini Sezione INFN Milano Bicocca.
M. Bonesini - MICE CM18 RAL 16/06/071 M. Bonesini INFN Milano Updates on TOF project.
1 TOF Aging Discussion Background information Summary of results so far Examples of gain loss mechanisms Diagnostics Possible scenarios for 2006 Discussion.
MICE CMPB Alain Blondel 19 April spokesperson remarks CMPB MICE NEWS.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
The LHCf experiment Measurement of Photons and Neutral Pions in the Very Forward Region of LHC Letter Of Intent: May 2004 Technical report: September 2005.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
Detector Systems For May/June Run MICE Video Meeting April 24, 2008.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
CLAS12 activity at IPNO D2I: Design, realization and test of the Central Neutron Detector J. Bettane, J.L. Cercus, B. Genolini, G. Hull, M. Imre, A. Maroni,
March 12, 2006R. Abrams LCWS06 Bangalore1 ILC Prototype Muon Scintillation Counter Tests Robert Abrams Indiana University.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1M. Ellis - MICE VC - 1st November 2007 Cosmic Ray Test Preparations  The cosmic ray test was initially planned to be held in R12, but this proved to.
July 19, 2006VLCW-06 Vancouver1 Scint/MAPMT Muon Prototype Operation Robert Abrams Indiana University.
17 February All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 February Dedicated some.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
CEDAR Support Structure Peter Sutcliffe 24 th January 2011.
M. Bonesini - 22/10/05 RAL1 M. Bonesini INFN Milano MICE TOF stations construction & planning.
M. Bonesini - MICE Inst Meeting M. Bonesini INFN Milano TOF installation plans.
MICE CM January 2009Jean-Sébastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM23 o Detector DAQ o Trigger o Online Software o Front End.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
Summary of the WA104, T600 overhauling programme C. Montanari – INFN-PV, Italy M. Nessi – CERN, Switzerland weekly meeting, December 18,
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
All Experimenters MeetingDmitri Denisov Week of September 9 to September 16 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 4.0pb.
M. Bonesini - MICE RAL M. Bonesini INFN Milano PMTs tests in B field.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
MOM Report Linda Coney MICE Operations Manager University of California, Riverside MICE Video Conference May 20, 2010.
Electromagnetic Calorimeter for HADES at SIS100 Pavel Tlustý, NPI Řež Motivation Plans Current status Tests Outlook HADES Collaboration Meeting, Sesimbra,
E. Picatoste, D. Gascon PMT afterpulsing and SPD trigger 1 Looking to the problem from the instrumentation point of view LHCb Calorimeter Meeting – CERN.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
Status of the NOνA Experiment Satish Desai - University of Minnesota For the NOνA Collaboration APS Meeting - April 2013 Denver, Colorado.
The HyCal Calorimeter from PrimEx A. Gasparian NC A&T State University Greensboro, NC.
V0 present status of the V0 project at CERN A. Sandoval, R. Alfaro.
Michael Lindgren 1 Off-Axis Workshop March 13, 2003 CDF R5900 MAPMT Experiences l Outline wCDF usage wTesting wPerformance wComments l Not sure what to.
Tracker Neutron Detector: INFN plans CLAS12 Central Detector Meeting - Saclay 2-3 December 2009 Patrizia Rossi for the INFN groups: Genova, Laboratori.
Shashlyk DAQ and FEE Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA DAQ and FEE Workshop, Rauischholzhausen Castle.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
Fabio, Francesco, Francesco and Nicola INFN and University Bari
GEM-based Digital Hadron Calorimetry for SiD
GEM-based Digital Hadron Calorimetry for SiD
The Detector System of the MICE Experiment
Presentation transcript:

Detector Systems Update MICO April 7, 2008

MICE Detector Systems  CKOV u Installed, first signals seen  TOF0/1 u 8 new H6533MOD assembly PMTs have been delivered by Hamamatsu on 28th March. s One probably has a broken active divider (shown after one hour of tests). s The remaining 7 PMTs are under test to study behaviour under stress. s Apparently 4 are fine and the remaining 3 show minor problems. u Construction of new insulating PMTs holders is under way in INFN MIB mechanics shop (this will help for the discharge problems) to replace anti- corrodal ones in TOF0. u The PMTs testbench has been updated to pre-test and condition 6 barrettes at a time (under HV) and test other 6 barrettes with cosmics. u No news up to now from Hamamatsu about broken PMTs (8) and cause of discharges.  Tracker u Work continues on AFEII firmware  Calorimeter u Currently collecting cosmic ray data to test all readout channels in various operating conditions with the goal to equalise their response to MIPs.

 Beam Monitors u Beam Monitors have been installed and are working. First beam seen on March 31. A number of issues remain and will have to be worked out s New top support for Large Beam Monitor s Some electronics issues – cause unknown at the moment s The two MAPMTs on the Large BM showed breakdown behavior when powered at RAL. This was not observed at Fermilab. We have contacted Burle and asked for replacements.