P09713 – FRESH BREAD AND ROLL SCALING ROOM Week 3 Presentation Senior Design I: Winter 2008-2009 Cecilia Enestrom, Kate Gleason, Erik Webster, Grant Garbach,

Slides:



Advertisements
Similar presentations
The Ten Principles of Material Handling
Advertisements

Chapter 10 Material Handling.
The information contained in this presentation, the source code and underlying program are protected by copyright owned by PlusDelta Technologies, LLC.
WAREHOUSING MANAGEMENT
WAREHOUSING MANAGEMENT
Strategic Decisions (Part II)
Logistics Network Configuration
D-R Compressor Cell RIT Senior Design Team P13458 Week 4 Status Report.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees Faculty Guide: Professor Kaemmerlen 1R10002 Process Improvement.
Andreana Crance, Industrial & Systems Engineering Matt Syska, Industrial & Systems Engineering.
Eric Albanese Helen Jervey Barret Zeinfeld Josh Monsees Faculty Guide: Professor Kaemmerlen.
INDUSTRIAL & SYSTEMS ENGINEERING
P09713 – FRESH BREAD AND ROLL SCALING ROOM Customer Needs and Product Specifications Senior Design I: Winter Cecilia Enestrom, Kate Gleason,
Sifting and Screening Equipment and Action Items from MSD I.
Fresh Bread and Roll Scaling Room MSD II Final Presentation Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai May 15 th, 2009.
Wegmans Fresh Bread and Roll Scaling Area Project Review II Erik Webster Kate Gleason Cecilia Enestrom Grant Garbach Andrew Tsai.
P09713 – FRESH BREAD AND ROLL SCALING ROOM Senior Design Winter
R-I-T Project Improvement Project Matthew Bonaventura Jimmy Ichihana Eric MacCormack Cody Rath Colin Roy.
Fresh Bread and Roll Scaling Room Erik Webster, Cecilia Enestrom, Kate Gleason, Grant Garbach, Andrew Tsai March 20 th, 2009.
Lean Manufacturing Chris Poteet Scott Carroll.
Wegmans Fresh Bread and Roll Scaling Area Phase Review I Erik Webster Kate Gleason Cecilia Enestrom Grant Garbach Andrew Tsai.
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph Fitzery Cinthia Sanchez.
Project Status Update P09457 – Process Improvement Project Eric MacCormack (IE) Colin Roy (IE)
PowerPoint Presentation by Charlie Cook Copyright © 2004 South-Western. All rights reserved. Chapter 7 System Design and Implementation System Design and.
Dr. Muzaffer Kapanoğlu - Decision Support Systems © 2003 MATERIAL HANDLING (Textbook Chapter 5)
Actionable Process Steps and Focused Mitigation Strategies
Lean Supply Chain Action Learning Program September 2007.
SEMESTER PROJECT ISE 250: Organizational Improvement Capabilities and Skills Instructor: Dr. Baruch I. Saeed Team Members: Ramachandran Janakiraman Emma.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Wegmans Frozen Cookie Capacity Increase Final Project Presentation Richard Latham, Bridget Eggers, Tyler Brent, Valeria Gonzalez.
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right amount, in sequence,
Manufacturing Processes Copyright © Texas Education Agency, All rights reserved.
1 Employability skills (a) Employers value people who: fit well into their team and workplace use initiative to solve routine problems work productively.
P09713 – Bread and Roll Scaling Room Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Kate Gleason.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
Capital Health Medical Outpatient Unit April 12th 2007 Final Presentation Kyle Brown Hillary Higgins Justin Lang.
Visit us at E mail: Tele: www.globalmanagergroup.com.
6-1. Key Sanitation Condition No. 6: Proper labeling, storage and use of Potential toxic compounds.
IM MATERIAL HANDLING. Material Handling Material handling is the function of moving the right material to the right place in the right time, in the right.
IENG 471 Facilities Planning
2011 NPMA Conference Series III National Capital Area Conference Leaders in Asset Management National Capitol Area Conference Charles L. Robinson, Director.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
Preparation for Design Planning 1. Study trends 2. Update on design and equipment possibilities »personal visits »read catalogs & trade journals »ask others.
Sponsored by Wegmans R Modern Food Processing and Bakery Technology for Lean Production Systems Levi Stuck Evan DeCotis Kate Gleason Stephanie Rager.
P10712 CHEESECAKE PROCESS IMPROVEMENT Andreana Crance, Kevin Rodas, Rob Santora, Jeremy Smith, Matt Syska.
13 Step Approach to Network Design Steps A Systems Approach 8Conduct a feasibility Study 8Prepare a plan 8Understand the current system 8Design.
1 UW-Provision Company. 2 Outline Introduction –Project Team –Client Client Background Problem Criteria Best Practices Alternatives Considered.
Project Management Process Transition & Closure Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team.
2005 Update to the Business Case Analysis of the Parachute Industry Prepared by: Dr. Lisa Owens & Dr. Frances Kennedy Clemson University.
Operations Fall 2015 Bruce Duggan Providence University College.
P09712 Commercial Roll Line Shrink Reduction Evan DeCotis Levi Stuck Ryan Dennison Joseph FitzeryCinthia Sanchez.
INNOVATION PODIUM. 12: :00 NEXT SESSION BAG FACTORY UNCOVERED BEUMER GROUP MIDDLE EAST Dirk Fransen, Director of BEUMER Innovation and Automation.
1. STARTING POINT Data is an important part of helping State and Local HDs achieve better health outcomes for their constituencies. Currently there appear.
CHAPTER 15 LEAN SYSTEM. THE CONCEPTS Operation systems that are designed to create efficient processes by taking a total system perspective Known as zero.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Issue Analysis: Patient Safety Nursing 450 Annie Cordova Ashley Cruz.
Author name here for Edited books chapter 9 Facility Maintenance 9 chapter.
Best Practices Consortium

Material handling Defined as the art and science of moving, packing and storing of substances in any form. Creation of time and place utility Movement.
The University of Jordan Mechatronics Engineering Department
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Lifecycle Services for Advanced Wireless LAN (LCSAWLAN) practice-questions.html.
Lean Healthcare Deployment and Sustainability Overview
P09713 – FRESH BREAD AND ROLL SCALING ROOM
P09712 Commercial Roll Line Shrink Reduction
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
Limited Resources Concept
Project Coaching Steve Snelling.
Presentation transcript:

P09713 – FRESH BREAD AND ROLL SCALING ROOM Week 3 Presentation Senior Design I: Winter Cecilia Enestrom, Kate Gleason, Erik Webster, Grant Garbach, Andrew Tsai

Project Timeline  Define: Week 1 – Week 3  Project Scope  Team Roles  Work Breakdown Structure  Customer Needs Assessment  Measure: Week 3 – Week 5  Data Collection Plan  Baseline Data Collection  Project Specifications  Data Organization

Project Timeline (continued)  Analyze: Week 5 – Week 10  Perform the data analysis necessary to fully understand the process and make recommendations for improvement.  Improve: Senior Design II  Prepare formal recommendations and justifications for the necessary process improvements.  Control: Senior Design II  Re-evaluate the process following implementation by Wegmans.

Customer Needs Revisited Customer NeedDescription 1.0Layout Design for the New Scaling Area 1.1 Area for short-term storage 1.2 Area for long-term storage 1.3 Relocate the scaling area near the short-term storage area 1.4 AutoCAD drawing of the improved layout 2.0Sifting and screening dry ingredients 2.1 Obtain the appropriate sifting and screening equipment 2.2 Improve product quality by reducing contaminants 2.3 Maintain or decrease the process time 2.4 Maintain or improve process ergonomics 3.0Lean Process Improvements 3.1 Reduce process time 3.2 Reduce shrink 3.3 Determine the future inventory management strategy 3.4 Create necessary SOP documents 4.0Ergonomics Improvements 4.1 Eliminate the need to manually lift buckets 4.2 Eliminate the need to manually lift and manipulate 50-lb bags

Specifications Revisited Engr. Spec. # Source: Customer Need Specification (description) Unit of Measure Marginal Value Ideal Value 1.0 Layout Specifications 1.1 Volume of long-term storage areaft Volume of short-term storage areaft Transport distance from short-term storage to the scaling areaft , 1.2 Transport distance from short-term storage to long-term storageft 2.0 Sifting and Screening Equipment Specifications Defective batches due to contaminantscount/time Composed of non-contaminating materialyes/no Meets the necessary capacitylbs/batch Change in process time due to sifting and screeningminutes 3.0 Process Improvement Specifications 3.1 Total process time per cycleminutes Material loss per cyclelbs. 4.0 Ergonomics Specifications , 4.2 Manual Liftinglifting index , 4.2 Reported incidentscount; $$

Ergonomics Data Collection  Major Issue: The constant manual lifting tasks required throughout the process is of concern to the customer  Perform the initial analysis using the NIOSH Lifting Equation  Data to collect:  Weight and dimensions of the scaling buckets  Lifting origins and destinations  Worker posture  Lifting frequency  Will determine if further analysis is necessary for any process tasks  Potentially use 3DSSP

Layout Data Collection  Major Issues: Inventory is unorganized and there are large transport distances between the storage area and scaling  Obtain existing AutoCAD drawings and verify accuracy  Determine the space constraints within the facility for both storage areas and production areas  Square footage of long-term storage, short-term storage, and production areas  Storage rack capacity  Collect data to determine space requirements  Volume of ingredients used per day, week, month  Pallet dimensions  Volume of ingredients per pallet  Space required to support production process  Current transport distances between storage and scaling

Process Data Collection  Major Issues: The current process takes too long, is unpredictable, and work is not standardized  Need to gain a firm understanding of the current process and procedures  A list of dry ingredients and frequency of use  A list of products with associated ingredients and frequency of production  Map process steps and flow  Process cycle time  Task times  Operator utilization  Shrink  Examine current documents used for scaling

Equipment Requirements Data Collection  Major Issue: Contaminants get into the mix because there is no equipment to sift and screen the dry ingredients  Need to gain a firm understanding of what Wegmans needs and can support  Current rate of product contamination  Wegmans standards for equipment selection  Capacity requirements  Sanitation procedures and cleaning requirements  Physical space constraints  Manual vs. Automated  Safety issues associated with equipment placement  Contact suppliers to investigate possible solutions