Stefan Moeller X-Ray October 27, 2005 1 X-Ray Detectors Stefan Moeller.

Slides:



Advertisements
Similar presentations
Muon Tracking FEE R.E. Mischke Los Alamos 10 September, 1999 presentation to the PHENIX Muon Arm Technical Advisory Committee.
Advertisements

1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
CT Physics V.G.Wimalasena Principal School of radiography.
Research Opportunities at LCLS September 2011 Joachim Stöhr.
John Arthur X-ray October 12, 2004 X-Ray Detector Program Status John Arthur.
Stefan Moeller XES FAC Review – April 16, 2006 X-Ray Endstation Systems (XES) Status Stefan Moeller.
Richard M. Bionta XTOD October 12, 2004 UCRL-PRES-XXXXX X Ray Transport, Optics, and Diagnostics, Overview Facility Advisory Committee.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Stefan Moeller Revised XES April 7, 2005 Revised X-Ray Endstation Scope Stefan Moeller.
J. B. Hastings LUSI Overview LCLS FAC March 20, 2007 LUSI Overview J. B. Hastings January 2007 Lehman Review Response to Lehman Review.
John Arthur X-ray June 17, X-ray Overview XTOD current status XES current status Schedule to first experiments.
J. B. Hastings LCLS User October 12-13, 2004 LCLS User Program J. Hastings SLAC/SSRL.
Diffraction studies of stimulated dynamics (pump-probe) Coherent-scattering studies of nanoscale fluctuations Atomic, molecular and optical science High.
John Arthur Photon Systems April 16, LCLS Photon Systems Status Technical status and accomplishments Response to.
John Arthur Photon October 18, 2005 LCLS Photon Systems Status John Arthur SLAC.
John Arthur Photon October 29, Photon Systems Update FAC recommendations Current status New plan for Photon Systems.
John Arthur Photon October 27, Photon Systems Overview John Arthur SLAC.
John Arthur Photon April 20, 2006 Photon Systems Update John Arthur SLAC Photon Systems Manager.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
1 Michael Rowen 1 SXR Instrument FAC SXR Instrument Michael Rowen – Engineering Physicist June 9, 2009.
John Arthur X-Ray Endstation April 29, 2004 X-Ray Endstations Overview John Arthur.
John Arthur X-ray April 7, 2005 LCLS Detector Development Plans John Arthur.
John Arthur PIXEL Project April 7, 2005 Status of the Proposed PIXEL Project John Arthur SSRL/SLAC Photon Instrumentation.
John Arthur Photon October 12, Photon Systems Update John Arthur SLAC 1.
Richard M. Bionta XTOD Beam and Detector October 12-13, 2004 UCRL-PRES-XXXXX XTOD Beam and Detector Simulations Facility Advisory.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Stefan Moeller XES Plan for FAC Review - April 20, 2006 X-Ray Endstation Systems (XES) Status and Plan for FY06 Stefan Moeller.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
R. Kass US LC Conference 1 Design and Fabrication of a Radiation-Hard 500-MHz Digitizer Using Deep Submicron Technology R. Kass The Ohio State University.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Keith O. Hodgson SSRL Director Brief Update on the Linac Coherent Light Source - LCLS February 26, 2002 Basic Energy Sciences Advisory Committee Undulator.
ATLAS PIXEL SYSTEM OVERVIEW M. Gilchriese Lawrence Berkeley National Laboratory March 11, 1999.
Test Readiness Review 23 October 2003 CRAL - LYON.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
CBM RICH working group GSI, Germany Bergische Universität Wuppertal (BUW), Germany Hochschule Esslingen (HSE), Germany PNPI Gatchina, St. Petersburg, Russia.
Aug 2003 Craig Ogilvie 1 Landscape/Goals for R&D  Goal: Barrel+structure ready Summer/Fall 06 (run07)  Goal: Endcaps ready Summer/Fall 07 (run08)  RIKEN.
Max Cornacchia, SLAC LCLS Project Overview BESAC, Feb , 2001 LCLS Project Overview What is the LCLS ? Transition from 3 rd generation light sources.
L. Greiner1IPHC-LBNL Phone Conference 05/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
HEXITEC ASIC – A Pixellated Readout Chip for CZT Detectors Lawrence Jones ASIC Design Group Science and Technology Facilities Council Rutherford Appleton.
Workshop Overview, Charge and Deliverables Joachim Stöhr.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
L. Greiner1IPHC-LBNL Phone Conference 07/10/2012 STAR IPHC-LBNL Phone Conference News and updated ladder testing.
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
Proposal for ESS DTL Roadmap. Divide Into Four Phases 1.Conceptual Design Phase (In progress) 2.Technical Design Phase 3.Prototyping Phase 4.Construction.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
A discussion on the Readout Schedule leading to PDR Ganesan Rajagopalan Cornell University.
Time to resolve Design Issues 1. Disclamer Due to the engineering meeting last week I have not had time to coordinate this material with Tim or the L3.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
MAC meeting (12-13 January 2010) Machine Advisory Committee participants: B.Sharkov (ITEP/FAIR) P.Belochitskii (CERN) S.Ivanov (IHEP, Protvino) M.Steck.
Draft of 3 year CMOS Strip Programme Need to advise WG3 on likely resource requirement Draft Outline provided at Valencia Discuss and improve basis for.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Jim Fast Pacific Northwest National Laboratory
TK Upgrade report.
LCLS Ultrafast Science Instruments
LSST Camera Detector Status
A Cold SCU Phase-Shifter
Stefan Moeller – XES Manager May 14, 2009
FEE Electronics progress
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstations Update
Experimental Program and Endstations System (WBS ) J
NEH - Status Stefan Moeller.
X-Ray Endstation Design & Management/Commissioning
X-Ray Endstation Systems (XES) 2006 Schedule
Current Status for Ion Polarization Studies
LCLS Instrument MIE Project: Staffing, Schedule
LCLS Photon Systems Overview
Presentation transcript:

Stefan Moeller X-Ray October 27, X-Ray Detectors Stefan Moeller

X-Ray October 27, Overview LCLS presents detector challenges Signal comes in large pulses (many photons) Pulse rep rate at 120Hz Dynamic range/ low noise >requires significant R&D for new detectors Detector programs: LCLS and LUSI

Stefan Moeller X-Ray October 27, X-Ray Detectors Four detector prototypes planned: Beam Imaging Beam Intensity Streak Camera 2-D X-ray Detector

Stefan Moeller X-Ray October 27, LCLS Detector Advisory Committee (LDAC) Advises and reviews LCLS and LUSI detector development projects Meets regularly (1st. Meeting Febr./March ’05) Next early 2006 Members: G. Derbyshire (Rutherford Appleton Lab.) (Chair) L. Strueder (MPI Extraterrestrische Physik, Garching) E. Eikenberry (Paul-Scherrer-Institut, SLS) Y. Amemiya (Univ. Tokyo) E. Heijne (CERN) A. Walenta (Univ. Siegen)

Stefan Moeller X-Ray October 27, Based on LDAC comments LCLS decided to: Proceed with 2 D Detector program at Cornell Initiate a 2nd pixel detector at BNL (LUSI) Start a streak camera project with LBNL Assign detector projects to specific experiments Develop detector specifications matched to experimental requirements

Stefan Moeller X-Ray October 27, D X-Ray Detector Program Detector Specifications: 2D Pixel array detector FY05 phase based on generic specs FY06: Specifications will be defined to meet the requirements of the Single Bio Molecule Imaging Experiment (no impact on cost or schedule)

Stefan Moeller X-Ray October 27, D Detector Development Plan Overview Time1 st year2 nd year3 rd year4 th year Reviews/ Milestones - Complete SOW - Award initial funding early Progress review Jan Major review early Decision to proceed with final development - Progress review Fall Acceptance tests early 2009 Activity - Design pixel electronics - Fabrication of small- scale test chips - Continue R&D of pixel electronics of small-scale fab - Optimize design of small- scale fab - Design and fab of large- scale detector chips - Design and build of readout electronics - Development, fabrication and delivery of final detector system

Stefan Moeller X-Ray October 27, D Detector: Summary of completed tasks for 2005 Initial concept of pixel architecture Design of electronics (pixel and component level) Layout of CMOS Design and layout of test structures 1st prototype schematics 1st prototype layout First prototype submission to MOSIS fabrication* Design and fabrication of test electronics* Test of prototype performance* * ongoing

Stefan Moeller X-Ray October 27, Plans for FY06 Schedule Design Review (Jan./Feb. 06) Extend Contract for second year (TA) Establish detailed schedule for FY06 Refine and detail specs, cost and schedule, milestones End of 2nd year: Major Design Review

Stefan Moeller X-Ray October 27, X-ray Streak Camera Initiate R&D contract with LBNL Plan to start R&D program in FY06 Visit LBNL soon Develop specifications, MOU/TA

Stefan Moeller X-Ray October 27, XES Detector Status 2D Detector Project is on schedule Initiate Streak Camera Project with LBNL in FY06 Imaging and Intensity Detectors to start FY07 Hiring of Detector Engineer soon (Jan. 07)