Preliminary Design Review Week 9 THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 20, 2008.

Slides:



Advertisements
Similar presentations
Android Enabled Camera Positioning system Design Team 3 Chris Sigler Yan Sidronio Ryan Popa Jeremy Iamurri Austin Fletcher Facilitator: Dr. Oweiss Sponsor:
Advertisements

Using GPS/GIS in the Classroom
Greg Beau SerajAnanya. Outline  Project overview  Project-specific success criteria  Block diagram  Component selection rationale  Packaging design.
UAA Rocketry Critical Design Review Presentation.
AME Senior Design Group E3: Hewlett-Packers Concept Design Review April 24, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday March 25, 2008.
Alternate coordinate systems: Solutions for large-scale maps
John Wloch Wind-Aid Preliminary Design Review 19 February 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Preliminary Design Review HMS Bloodhound Matt Morris, Matt Prygoski, Jay Slaggert Fred Thwaites, Dan Zibton.
October 21, 2003 ECE Senior Design1 Autonomous GPS-BOT Preliminary Design Review by Kery Hardwick, Yevgeniy Khasanov, Naoya Kinuta, Zhe Chuan Luo.
Bad News Bots E2 Project Design Review 8 – 4/3/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Preliminary Design Review Week 6 Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday March 13, 2008.
‘Iole o Mãnoa Mouse of Mãnoa. Team Members Jeff Fines Designer, Fabricator, Programmer & Thomas Matsushima Designer, Fabricator, Programmer.
Preliminary Design Review HMS ‘Hound Dog’ Matt Prygoski Matt Morris Dan Zibton Fred Thwaites Jay Slaggert Thursday February 7, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Team Mejor – The Spyder Critical Design Review -12/7/04.
Preliminary Design Review Week 7 Group A3: HMS “Bloodhound” Matt Prygoski Matt Morris Jay Slaggert Fred Thwaites Dan Zibton Thursday March 20, 2008.
Engineering H193 - Team Project Spring Quarter 2003 P. 1 Performance Test 2 Week 4 Day 3.
Bad News Bots E2 Project Design Review 5 - 2/28/2008 Ryan Bove Kara Collins * Peter Courtney Kyle O’Reilly Benjamin Rowland.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Bangarang Musical Engineering University of Notre Dame Department of Aerospace and Mechanical Engineering Group Members: Roberto Ayala, Ryan Bradley, Pat.
Senior Project Design Review Remote Visual Surveillance Vehicle (RVSV) Manoj Bhambwani Tameka Thomas.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
John Wloch Wind-Aid Preliminary Design Review 25 March 2008 Andy CrutchfieldJames Gates Keri MacaulayDavid Rupp.
Robotic Football Group E1 Jesse Brawer Zach Eberbach Rob Mineo Laura Peveler Susan Sinclair.
Team HazardHawk Team HazardHawk Last Week  Trim Budget Complete ○ Select new driveshaft, sprocket, bearings ○ Select additional component: clips.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 3, 2008.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday February 21, 2008.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
AME Senior Design Group E3: Hewlett-Packers February 26, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Capstone Design Project Plan Team SAUSAGES Ryan Campbell Anne Carrier Gonzalo Gonzalez Bryan Grider Steve Kerkmaz Ziad Mohieddin EE 401 – EE Design I Instructor.
AME Senior Design Group E3: Hewlett-Packers March 11, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Bad News Bots E2 Project Design Review 2 - 2/7/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
GPS-Guided Autonomous Vehicle.
Team Migliore Controls and Interface Presented by: Matt Burkhardt Brendan Crotty.
Longitude North - South Meridians base point of world system is Greenwich, England Iowa - approximately 93 0 West.
By: Kayla Chronister. o Yellowstone National Park sits directly on top of the Supervolcano. o Yellowstone’s Supervolcano would be one of the most destructive.
Concept Design Review THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI April 24, 2008.
John Wloch Wind-Aid Preliminary Design Review 11 March 2008.
Autonomous Surface Navigation Platform Michael Baxter Angel Berrocal Brandon Groff.
Team HazardHawk Team HazardHawk 2008 April 24, 2008.
Critical Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Tuesday, April 22, 2008 Thursday, April.
Vanderbilt University Department of Biomedical Engineering  
Finding Your Way— Maps, Compass and GPS Eagle Vision 2005.
Bad News Bots E2 Project Design Review 4 - 2/21/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
Latitude & Longitude. ► Latitude Lines  Run parallel to the equator (also called Parallels)  (Think of the rungs of a ladder; latitude=ladder) ► Longitude.
AME Senior Design Group E3: Hewlett-Packers March 18, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
Which words from vocab #1 might be related to the word “grid”?
Team HazardHawk Team HazardHawk Last Week  Concept Finalization Complete  Preliminary CAD of Concept Complete  Budgetary Estimates Parts Selection.
Team 6 DOODLE DRIVE Alexander Curtis Peachanok Lertkajornkitti | Jun Pan | Edward Kidarsa |
1/29/2013 EEL4665 Spring ‘13 University of Florida Leonardo Falcon.
Team A ECE 496: Gyrobot Michael Tan Trey Moran Rod Petak Rob Slater Quy Quan.
Sophisticated Design Automatic Tailgate Final Presentation December 5, 2001 Ted Akiskalos June Doan Tarek Elshazly Maggie Kim David Nimitz Sharon Ramey.
All About Maps Types, Tools, and Use. Physical Maps – Show mountains, lakes, rivers, and other physical features Political Maps – Show boundaries such.
LAB 1 Navigation Coordinate System on Earth
EE/CS 481 Spring Founder’s Day, 2008 University of Portland School of Engineering Authors Matthew Gridley Nathan Oliver Tim Morris Advisor Dr. Rylander.
Revolutionary Technologies Group C1 Nicholas Arch, Nicholas Fraser, Robert Huth, Patrick Noble, Michael Toomey Preliminary Design Review February 21, 2008.
Smart Lens Robot William McCombie IMDL Spring 2007.
Latitude & Longitude Practice
2 meter long PVC tube Fitted with a lid in each end – see photos on next pages Brass top, to fasten a rope, and to help fasten the hinge for the top lid.
Preliminary Design Review Group A3: HMS “Bloodhound” Matt Morris Matt Prygoski Jay Slaggert Fred Thwaites Dan Zibton Thursday, April 10, 2008.
AME Senior Design Group E3: Hewlett-Packers (Robo-football Quarterback) March 27, 2008 Caitlin Feely Ben Nelessen JJ Rees Jamie Rowland Patrick Tennant.
P07122: Autonomous Quadcopter Jason Enslin – EE: Team Leader, Circuit Design/Testing Glenn Kitchell – CE: Programming, Software Design Richard Nichols.
Bad News Bots E2 Project Design Review 7 - 3/20/2008 Ryan Bove Kara Collins Peter Courtney Kyle O’Reilly Benjamin Rowland.
USCMS Pixel PMG, Nov 29, Mechanics Status Disks, ½ Service Cylinders Installation USCMS FPIX FNAL PMG Joe Howell Bruno Gobbi Nov. 29, 2006.
Which graph makes sense?
What do these have in common?
Latitude & Longitude Practice
Presentation transcript:

Preliminary Design Review Week 9 THE DUKES OF HAZARD CAMILLE LEGAULT, NEIL KENNEDY, OMAR ROJAS, FERNANDO QUIJANO, AND JIMMY BUFFI March 20, 2008

Previous Week’s Action Items Acquire Parts and Materials Acquired All Ordered Materials CAD Redesign Continue Working with GPS Begin Programming and Interface with GPS Began Programming Logic Digital Compass Continue Testing and Improve Accuracy Second GPS Test

Previous Week Action Items and Status CURRENT STATUS: On Schedule, No Showstoppers

Close Up of the Final Prototype Design

Close-Up of CAD Features

Acquired Parts 12” x 24” x 3/8” Gray PVC 12” x 24” x 3/16” Clear PVC 15 lb/in Springs 57 lb-oz Servo Motor Digital Compass Bumper – Maximum deflection of ”

More Parts to Order 6” Long 3/16” Dia. Precision Ground Rod 6 Brass Bushings C-Clips Set Screws L-Brackets 2 Hinges 4 Colored Light Bulbs 4 Light Bulb Mounts

Second Test GPS for Accuracy Distance between degrees of latitude ~ 69 miles Distance between degrees of longitude ~ 50 miles Latitude (deg)Longitude (deg) TrialNorthWest average st. dev % error0.000% st. dev. (feet)

Next Week’s Action Items Order All Necessary Parts McMaster-Carr Complete Machining of Platform Base and Fit to Chassis Continue Working on Program Interfacing with Peripheral Equipment Search Algorithm

QUESTIONS?