Sprinkler Buddy Presentation #12: “Final Presentation Outline” 4/25/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Sasidhar Uppuluri Devesh.

Slides:



Advertisements
Similar presentations
Presentation #M2 EZ Parking Wontaek Shin (M2-1) Shanshan Ma (M2-2) Nan Li (M2-3) Stage 1: 1/24/2006 Design Proposal Overall Project Objective: Design a.
Advertisements

[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 29 Overall Project Objective : Dynamic Control.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Nov. 19 Overall Project Objective : Dynamic Control.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #5: “Transistor Level Schematics and Another Floor Plan” 2/21/2007 Team M3 Sasidhar Uppuluri Kalyan Kommineni Kartik Murthy.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
WaitLess: Changing Restaurants Today for a Better Tomorrow Team Members: Jared Dubin, Terry Garove, Alex Runas Design Manager: Panchalam Ramanujan Where's.
Virtual Wallet Gates Winkler Yin Shen Jordan Samuel Fei /23/2009 A handheld device that saves time and money through smart budget management and.
1 Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation 13: Final Presentation.
Noise Canceling in 1-D Data: Presentation #13 Seri Rahayu Abd Rauf Fatima Boujarwah Juan Chen Liyana Mohd Sharipp Arti Thumar M2 April 20 th, 2005 Short.
The Wait-er Hater WaitLoss Program utilizing WaitLess Technology: Presentation #3 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 3: Feb. 4 th Size Estimates/Floorplan Overall Project Objective: Design an.
Viterbi Decoder: Presentation #11 M1 Overall Project Objective: Design a high speed Viterbi Decoder Stage 11: 12 th April 2004 Short Final Presentation.
Huffman Encoder Project. Howd - Zur Hung Eric Lai Wei Jie Lee Yu - Chiang Lee Design Manager: Jonathan P. Lee Huffman Encoder Project Final Presentation.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 10: April 5th Chip Level Simulation Overall Project Objective: Design an.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 11: April 12th Short Final Presentation Overall Project Objective: Design.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
M3: The Pro-Diver 525 Kavita Arora (M3-1) Lisa Gentry (M3-2) Steven Wasik (M3-3) Karolina Werner (M3-4) Design Manager: Steven Beigelmacher Stage 11: Mini-
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 9: March 31st Chip Level Simulatio Overall Project Objective: Design an Air-Fuel.
RF Triangulation: Indoor/Outdoor Location Finding Chip Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai Overall Project.
M2: Team Paradigm :: Pre-Final Presentation 2-D Discrete Cosine Transform Team Paradigm (Group M2): Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan.
Viterbi Decoder: Presentation #2 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Dynamic Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Dec. 3 Project Objective : Dynamic Control.
Sprinkler Buddy “Low Cost Irrigation Management For Everyone !”
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
High Dynamic Range Emeka Ezekwe M11 Christopher Thayer M12 Shabnam Aggarwal M13 Charles Fan M14 Manager: Matthew Russo 6/26/
Team W3: Anthony Marchetta Derek Ritchea David Roderick Adam Stoler Milestone 8: March 24th Chip Level Layout Overall Project Objective: Design an Air-Fuel.
Sprinkler Buddy Presentation #8: “Testing/Finalization of all Modules and Global Placement” 3/26/2007 Team M3 Kartik Murthy Panchalam Ramanujan Sasidhar.
Sprinkler Buddy Presentation #7: “Redesign of Adder Parts And Layout of Other Major Blocks” 3/07/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam.
E-Voting Machine - Design Presentation Group M1 Bohyun Jessica Kim Jonathan Chiang Chi Ho Yoon Donald Cober Mon, Nov 10 Analog Simulation for ExtractedRC.
Camera Auto Focus Presentation 3, February 7 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Sprinkler Buddy Presentation #3: “New and Improved Floor Plan and Structural Verilog” 2/14/2007 Team M3 Panchalam Ramanujan Kalyan Kommineni Kartik Murthy.
ELEN468 Lecture 11 ELEN468 Advanced Logic Design Lecture 1Introduction.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Wed. Oct. 20 Overall Project Objective : Dynamic Control.
ESE 570 Final Project Due Wednesday, May 5, 2004, 4:30 pm.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: February 4 th 2004.
Team W1 Design Manager: Rebecca Miller 1. Bobby Colyer (W11) 2. Jeffrey Kuo (W12) 3. Myron Kwai (W13) 4. Shirlene Lim (W14) Stage II: 26 th January 2004.
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Sprinkler Buddy Presentation #6: “Optimized Schematics and Component Layout” 2/28/2007 Team M3 Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan.
ELEN468 Lecture 11 ELEN468 Advanced Logic Design Lecture 1Introduction.
Camera Auto Focus Presentation 4, February 14 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
Viterbi Decoder: Presentation #4 Omar Ahmad Prateek Goenka Saim Qidwai Lingyan Sun M1 Overall Project Objective: Design of a high speed Viterbi Decoder.
1 GPS Waypoint Navigation Team M-2: Charles Norman (M2-1) Julio Segundo (M2-2) Nan Li (M2-3) Shanshan Ma (M2-4) Design Manager: Zack Menegakis Presentation.
Camera Auto Focus Group W1 Tom Goff Dave Hwang Kate Killfoile Greg Look Design Manager: Bowei Gai Final Presentation, April 30 th, 2007 Project Objective:
M2: Team Paradigm :: Milestone 7 2-D Discrete Cosine Transform Group M2: Tommy Taylor Brandon Hsiung Changshi Xiao Bongkwan Kim Project Manager: Yaping.
Sprinkler Buddy Presentation #10: “LVS” 4/11/2007 Team M3 Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Design Manager:
WaitLess*: Presentation #9 Team M2: Jared Dubin Terry Garove Alex Runas Manager: Panchalam Ramanujan Overall Project Objective: Table/bar service interface.
Camera Auto Focus Presentation 6, February 28 th, 2007 Team W1: Tom Goff (W11) David Hwang (W12) Kate Killfoile (W13) Greg Look (W14) Design Manager: Bowei.
WaitLess: Changing Restaurants Today for a Better Tomorrow Probably put a picture here of like a restaurant or something also maybe a better subtitle?
Idongesit Ebong (1-1) Jenna Fu (1-2) Bowei Gai (1-3) Syed Hussain (1-4) Jonathan Lee (1-5) Design Manager: Myron Kwai Overall Project Objective: Design.
Sprinkler Buddy Presentation #9: “Layout and a New Feature” 4/4/2007 Team M3 Panchalam Ramanujan Sasidhar Uppuluri Devesh Nema Kalyan Kommineni Kartik.
[M2] Traffic Control Group 2 Chun Han Chen Timothy Kwan Tom Bolds Shang Yi Lin Manager Randal Hong Mon. Nov. 24 Overall Project Objective : Dynamic Control.
RF Triangulator: Indoor/Outdoor Location Finding Architecture Proposal Giovanni Fonseca David Fu Amir Ghiti Stephen Roos Design Manager: Myron Kwai.
1 Design Goal Design an Analog-to-Digital Conversion chip to meet demands of high quality voice applications such as: Digital Telephony, Digital Hearing.
Group M3 Jacob Thomas Nick Marwaha Craig LeVan Darren Shultz Project Manager: Zachary Menegakis April 20, 2005 MILESTONE 13 Short Final Presentation DSP.
Virtual Wallet Gates Winkler Yin Shen Jordan Fei Project Manager: Prajna Shetty /02/2009 A handheld device that saves time and money through smart.
Group M1 Insik Yoon Mehul Jain Umang Shah SritejaTangeda Team Manager Prajna Shetty Secure unique Smart Card Reader Wednesday 2 nd December, 2009.
Sprinkler Buddy Presentation #3: “System Level View and Floor Plan / Sizing” 2/07/2007 Team M3 Kartik Murthy Kalyan Kommineni Panchalam Ramanujan Sasidhar.
CSE 494: Electronic Design Automation Lecture 2 VLSI Design, Physical Design Automation, Design Styles.
McKenneman, Inc. SRAM Proposal Design Team: Jay Hoffman Tory Kennedy Sholanda McCullough.
IMPLEMENTATION OF MIPS 64 WITH VERILOG HARDWARE DESIGN LANGUAGE BY PRAMOD MENON CET520 S’03.
Integrated Microsystems Lab. EE372 VLSI SYSTEM DESIGNE. Yoon 1-1 Panorama of VLSI Design Fabrication (Chem, physics) Technology (EE) Systems (CS) Matel.
EMT 351/4 DIGITAL IC DESIGN Week # 1 EDA & HDL.
ASIC Design Methodology
ADPCM Adaptive Differential Pulse Code Modulation
Alpha Blending and Smoothing
Presentation transcript:

Sprinkler Buddy Presentation #12: “Final Presentation Outline” 4/25/2007 Team M3 Kalyan Kommineni Kartik Murthy Panchalam Ramanujan Sasidhar Uppuluri Devesh Nema Design Manager: Bowei Gai “Low Cost Irrigation Management For Everyone !”

Current Status Determine Project Develop Project Specifications Plan Architectural Design –Determination of all components in design –Detailed logical flowchart Design a Floor Plan Create Structural Verilog Make Transistor Level Schematic Layout Testing (Extraction, LVS, and Analog Sim.)

Final Presentation Outline Marketing (Kalyan) Project Description (Panchalam) Behavior/Algorithmic Description (Panchalam) Design Process (Sasi) Floor Plan Evolution (Sasi) Layout (Kartik) Verification (Devesh) Issues Encountered (Devesh) Specifications (Kartik) Conclusions (Kartik)

Sprinkler Buddy Marketing Why Sprinkler Buddy ?

$52 Million market potential 1.1 Billion potential customers 100% yearly market growth 6 month payback to customer Sprinkler Buddy at-a-glance

Large and Untapped Market 95% of the 1.1 billion farmers are from developing nations 60% of irrigation water wastage in these nations

The South Asian Farmer Average yearly income is $ % of yearly earnings are lost In water costs

Current Solutions: Expensive/Un-automated Prohibitively expensive for the average farmer Customer forced to make a choice Do not adhere to standard guidelines

Sprinkler Buddy: The low cost, automated solution !

The Sprinkler Buddy Advantage Simple ease of use Low Power Design Exhaustive Metrics Low Cost Solution Rain Bird Gorman-Rupp Jain Sprinklers Sprinkler Buddy Minimal Setup and Service Solar Powered Design UN Certified Water Output Calculations Low Cost Alternative

Project Description Overview of Chip’s features –Brief description of water equation –Breakdown of modes –Key Feature Listing Power Gating Quiet bit line SRAM Semi-Clocked Architecture

Behavioral Description Detailed description of each mode using flowcharts –Translation of algorithm to hardware –FSM specifications –Sharing of FPUs Interaction between modes Detailed description of main FSM (power)

Design Process Verilog –Verification and simulation of FSM control Floor Plan –Describe placement method Schematic –Optimal Sizing –Selection of logic style according to power requirements –Power shut off integration Layout –Compact custom shaped designs –FSMs –Power and Clock Distributions

Floor Plan Evolution Show all iterations Describe reasoning behind differences Display all 7 versions

Layout Show cool layouts –All major components –Power Gating –FSMs Show different metal layers

Verification Verification methodology Outputs from all modes VDD gating simulation

VDD Rise Verification

VDD Fall Verification

Mode Output Verification

Final Error Output Verification

Final Valve Enable Output Verification

Issues Encountered Routing of Control Signals Partitioning of work Gnd gating Lots of other problems…

Sprinkler Buddy Specification Chip Specification –Area, Density, Transistor Counts, etc.

Conclusion Wrap it up