PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich.

Slides:



Advertisements
Similar presentations
Conditioning of MWPCs for the LHCb Muon System Katharina Mair for J.-S. Graulich, H.-J. Hilke, A. Kachtchouk, K. Mair, B. Schmidt, T. Schneider LHCb Muon.
Advertisements

Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
Present Status of GEM Detector Development for Position Counter 1.Introduction 2.GEM 3.Readout Board 4.Fabrication Test 5.Large GEM 6.Readout Electronics.
HEP Experiments Detectors and their Technologies Sascha Marc Schmeling CERN.
E/π identification and position resolution of high granularity single sided TRD prototype M. Târzilă, V. Aprodu, D. Bartoş, A. Bercuci, V. Cătănescu, F.
DESY Zeuthen 1 Precision drift chambers (MDT) for ATLAS muon system. G.Chelkov JINR (Dubna) DESY Zeuthen 10 September 2002.
GEM Detector Shoji Uno KEK. 2 Wire Chamber Detector for charged tracks Popular detector in the particle physics, like a Belle-CDC Simple structure using.
1 VCI, Werner Riegler RPCs and Wire Chambers for the LHCb Muon System  Overview  Principles  Performance Comparison: Timing, Efficiency,
PNPI in LHCb A.Vorobyov HEPD Scientific Board meeting, December 26,2003 Status report for 2003.
Christine KOURKOUMELIS University of Athens ATLAS Muon Chamber construction in Greece and alignment studies for H  ZZ  4μ decay Como, 8/10/03.
Ionization. Measuring Ions A beam of charged particles will ionize gas. –Particle energy E –Chamber area A An applied field will cause ions and electrons.
Mauro Raggi Status report on the new charged hodoscope for P326 Mauro Raggi for the HODO working group Perugia – Firenze 07/09/2005.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
2012 IEEE Nuclear Science Symposium Anaheim, California S. Colafranceschi (CERN) and M. Hohlmann (Florida Institute of Technology) (for the CMS GEM Collaboration)
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
Chamber parameters that we can modify and that affect the rising time Number of ionisation clusters produced in the drift gap: Poisson Distribution Probability.
Jeroen van Hunen The LHCb Tracking System. May 22, 2006 Frontier Detectors for Frontier Physics, Elba, Jeroen van Huenen 2 The LHCb Experiment LHCb.
1 Status of the Test System of the MWPC for the LHCb Muon System Andre’ Massafferri (Universita’ Tor Vergata – INFN sezione II - Roma) V. Bocci, R. Nobrega.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
First results of an aging test of a full scale MWPC prototype for the LHCb muon system Workshop on “Aging Phenomena in Gaseous Detectors”, October 2-5.
T.Schneider/LHCb Muon EDR
NanoPHYS’12 – December 17-19, 2012 K. Nakano, S. Miyasaka, K. Nagai and S. Obata (Department of Physics, Tokyo Institute of Technology) Drift Chambers.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
27 Octobre 2005IEEE2005 Nuclear Science Symposium, Puerto Rico, Niels Tuning 1/18 A High-Efficiency and High- Resolution Straw Tube Tracker for the LHCb.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
1 A.Andronic 1, H.Appelshäuser 1, V.Babkin 2, P.Braun-Munzinger 1, S.Chernenko 2, D.Emschernmann 3, C.Garabatos 1, V.Golovatyuk 2, J.Hehner 1, M.Hoppe.
5 th RD51 meeting (WG1) 25 May 2009 Atsuhiko Ochi ( Kobe University )
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Status of MWPC production and quality control The measure of the gas leakage, is obtained by correcting the P(t) behavior by using the data of the reference.
M. Bianco On behalf of the ATLAS Collaboration
GEM basic test and R&D plan Takuya Yamamoto ( Saga Univ. )
First Results from the NA62 Straw Spectrometer E uropean P hysical S ociety 2015, Wien Vito Palladino - CERN On Behalf of NA62 Collaboration.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
26 June 2006Imaging2006, Stockholm, Niels Tuning 1/18 Tracking with the LHCb Spectrometer Detector Performance and Track Reconstruction Niels Tuning (Outer.
M. Staib, M. Abercrombie, B. Benson, K. Gnanvo, M. Hohlmann Department of Physics and Space Sciences Florida Institute of Technology.
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
Muon Meeting April 2004JsG Status of Chambers Production at CERN Jean-Sebastien Graulich o Open Questions from the PRR O-ring Aging, Aging tests, Storage.
CBM workshop on Muon ID B.Schmidt Muon Identification in LHCb Workshop on Muon Detection in the CBM Experiment Outline: Introduction –Physics.
Radioactive source and cosmic-ray test for the MWPC Davide Pinci on behalf of the Frascati-Roma1 MWPC group.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
Chamber Quality Control Before the construction several checks are performed on:  Panels (cathode and pad PCB)  GEM foil Tests on assembled detector.
E. Robutti TOTEM T1 Engineering Design Review CERN, March 7, 2006 CSC detector requirements and perfomance Enrico Robutti I.N.F.N. Genova.
10/7/2003Thomas Schneider1 Status report of CERN/PNPI Tooling support for PNPI M2R2 Prototype Plans towards the PRR.
To measure 0, mechanical oscillations of the wire to be tested are induced by applying a periodic high voltage (about 900 V) with a frequency of 300 ÷
Status of production at LNF E.Dane’ and C. Forti – Meeting with LHCb referees Firenze 14-mar-05 Christmas 3 ch/week Ch. 43.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
LHCb Muon System TDR Outline: Introduction –Physics requirements –Background conditions Overview of the Muon System Physics Performance –L0 muon trigger.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
ATLAS Transition Radiation Tracker End-cap Quality Control and the Characterization of Straw Deformations Michael Kagan University of Michigan Supervisor:
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
1 PANDA FWD Meeting, GSI-Darmstadt, Preparation of the TDR for the forward tracker University Ferrara + Jagiellonian University, Cracow Main.
TPC R3 B R3B – TPC Philippe Legou Krakow, February nd
TOTEM CSC construction and Quality Control Status report A.Krivshich Petersburg Nuclear Physics Institute March 07, 2006 CERN.
R&D activities on a double phase pure Argon THGEM-TPC A. Badertscher, A. Curioni, L. Knecht, D. Lussi, A. Marchionni, G. Natterer, P. Otiougova, F. Resnati,
(University of Sofia “St. Kliment Ohridski”)
CMS muon detectors and muon system performance
Status of MWPC production and quality control
MWPC prototyping and testing of STAR inner TPC upgrade
LHCb Muon Detector MWPC & GEM
Development of Gas Electron Multiplier Detectors for Muon Tomography
Pre-installation Tests of the LHCb Muon Chambers
Simone Brusa / INFN – Ferrara On behalf of LHCb muon group:
Engineering Design Review
Gain measurements of Chromium GEM foils
A DLC μRWELL with 2-D Readout
Presentation transcript:

PRODUCTION and CERTIFICATION of Multi Wires Proportional Chambers for the LHCb Muon System at CERN K.Mair for the LHCb Muon Group CERN* Poster anlässlich der 55. Jahrestagung der Österreichischen Physikalischen Gesellschaft, September 2005 * J.-S. Graulich (Université de Genève), A. Kachtchouk (Petersburg Nuclear Physics Institute), K.Mair (CERN), B. Schmidt (CERN), T. Schneider (CERN) 5 Muon Stations Calorimeters Tracker RICH-2 Vertex Locator Magnet RICH-1 Muon Detectors Iron Filters The Large Hadron Collider beauty experiment for precise measurements of CP violation and rare decays: The aim of the LHCb experiment is to fully investigate CP violation in the B d and B s systems, and to possibly reveal new physics beyond the Standard model. Multi Wire Proportional Chambers (MWPC) in the LHCb Muon System MWPC Production at CERN A muon trigger is given by a coincidence of all 5 muon stations within 25ns >99% efficiency/station in 20ns time window Time resolution <3ns Up to 500 kHz/cm 2 total of 1368 MWPC in the Muon System for fast muon triggering and offline muon identification Design Parameters: Wire: Gold-plated Tungsten, 30 μm Ø Wire spacing: 2 mm Wire length: 250 to 310 mm Wire mechanical tension: 65 gr Gas gap: 5 mm Gas mixture: Ar/CO 2 /CF 4 (40:55:5) Operation Voltage: HV = kV Field on wires: 262 kV/cm Field on cathodes 6.2 kV/cm Gas gain: G ≈ Gain uniformity: ≤ 30% Rate/channel: < 1 MHz Cross section of a 4-gap MWPC Anode Wires Cathode Pads Segmentation: Catode Pads on PCB with gold-coated copper foil Gold plated tungsten anode wires grouped in strips 4-gap MWPC-Sandwich: 2 double-side wired panels in between 3 non-wired cathode panels Chamber Certification 3. Gas Gain Uniformity Test 2. Chamber Conditioning 1. Gas Leak Test Wire Conditioning: apply negative HV up to -2300V tip-like dirt on wires → e - -emission electromagnetic wire cleaning test: apply positive HV up to +2900V check currents with radioactive source Cathode Conditioning: apply positive HV, turn gamma-ray on observe Malter currents due to deposits on cathode (~15% of all gaps) “heal” with gamma–ray exposure (GIF) and CF 4 (~ 100 hours exposure time) no dark current → conditioning finished Specifications: < 2 mbar leak / hour at 5 mbar overpressure Measurement principle: Test against a gas-tight-proved reference chamber measure overpressure for 4 hours measure internal parameters: T, P Procedure: panel fixed between 2 bolts along HV and read-out bar to guide wire 1 bolt ring-like, 1 bolt double spiral bolt pitch 2mm panel in wiring automate first wire aligned by hand, then automatic spooling wires glued and soldered to panel 2. Panel Wiring 3. Panel Finalization wires cutting components soldering final inspection (microscope) HV training 4. Chamber Assembly Automatic Wiring Machine sandwich: 3 non-wired, 2 wired panels gap size defined by 2.5 mm bars mm spacers between layers gas tight by O-rings T Ch = T Ref = const. dV/V ~ d(  P Ch -  P Ref )/P Ch absolute error on P atm cancels out Wiring Tolerances: nominal wire distance: 2 mm 95% of all distances within  50 μm all within  100 μm nominal wire tension: 65 gr all values above 50 gr 1. Panel Production Cathode Panel: Printed Circuit Board (PCB) coated by 35 μm copper 5 μm nickel, 0.2 μm gold Cathode Panel  TEST: half gap size HV bar read out bar side bar panel Non-wired Panels: Gas inlets Connectors for pad read out Kapton foil Wired Panels: 2 wire fixation bars (HV, read-out), 2 side-bars bar thickness defines half-gap size: 2.5 mm Precise bars gluing  TEST: wire pitch: measured by 2 cameras with telecentric lenses wire tension: measurement of wire oscillation, excited by high voltage pulses Specification: Nominal Gas Gain: G 0 = uniformity within one gas gap: 95% of gap area must provide a gas gain within  30% G 0 uniformity between different gas gaps: average gap gas gain variation within  25% G 0 Principle: 241 Am source emits 60 keV gamma rays excitation of copper in panel → 8 keV gamma rays (absorption length less than 1 mm) photoelectric effect in Ar (gas) → electrons of few keV collected signal on anode → ADC counts distribution with peak position proportional to gas gain MWPC Sandwich Test setup Principle camera shot of 3 wires wire distance measurement wire pitch and tension measuring device Specification: half-gap size: 2.5 mm tolerance:  50 μm [mbar] Relative Gas Gain distribution over one gas gap relative gas gain [G 0 ] pad number in y pad nr in x wire sample