Optics for Skew Correction and Emittance Measurement Leo Jenner This talk is going to look familiar if you were at the recent LC-ABD meeting in Manchester…

Slides:



Advertisements
Similar presentations
Sha Bai, Philip Bambade, Glen White FJPPL – FKPPL ATF2 workshop LAL, 11~13 February, 2013 Orthogonality of beam waist corrections in the presence of IPBSM.
Advertisements

5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
Electron Model Components and Costing C. Johnstone Summary talk, C. Johnstone FFAG04 Oct 12-16, 2004 KEK, Tsukuba, Japan.
Coupling Correction in ATF2 EXT 7 th ATF2 Project Meeting, december 2008 C.Rimbault, LAL Orsay.
Ultra Low Vertical Emittance at the Australian Light Source Mark Boland on behalf of Rohan Dowd 1.
Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
ILC BDS Alignment and Tuning Studies Glen White SLAC/QMUL 8 November 2005 Progress report and ongoing plans for BDS alignment and tuning strategy.
12th January 2006Cockcroft, Liverpool/Daresbury1 ATF, ATF2 and a Beam Diagnostics Section for the ILC ATF, ATF2 and a Beam Diagnostics Section for the.
Mon 03 July 06Laserwire Mini-Workshop1 Using Laserwires to Measure Emittance at the ILC Leo Jenner, Daresbury Labs.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
1 ATF2 Tuning and its application to ILC and CLIC FFS/IR region ASTeC and MAN : working together on tuning methods for the ATF2 and ILC IR/extraction design.
Status of very high priority beam tuning software Special ATF2 project meeting, Korea, 1 st October 2008 Cécile Rimbault, on behalf of High Priority task.
Trajectory Correction and Tuning James Jones Anthony Scarfe.
Relative Error on Parameter Pessimistic Estimate Optimistic Estimate β function at the LW 3% 1% LW readout error 2% 1% Laser spot waist 10% Laser Pointing.
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
6. betatron coupling sources: skew quadrupoles, solenoid fields concerns: reduction in dynamic (& effective physical) aperture; increase of intrinsic &
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ILC BDS Static Beam-Based Alignment and Tuning Glen White SLAC 1.Aims. 2.Error parameters and other assumptions. 3.Overview of alignment and tuning procedure.
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
Laser-wire at ATF2 and PETRA Grahame Blair CERN, 18 th October 2007 Introduction Overview of errors Ongoing technical work in this area Plans for the future.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
EXT: Summary of activities, software development, and tuning performance 11th ATF2 Project Meeting, January M. Woodley1/29.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
Vertical Emittance Tuning at the Australian Synchrotron Light Source Rohan Dowd Presented by Eugene Tan.
1 Update on Tuning Studies for the ILC and Application to the ATF2 James Jones ASTeC/Cockcroft Institute Daresbury Laboratory.
J. Brossard, C. Rimbault a P. Bambade LAL / / 8-9 nov LAL 1 Exercising emittance measurements in the ATF EXT line Upgrade.
Design options for emittance measurement systems for the CLIC RTML R Apsimon.
Placet based DFS simulations in the ILC Main Linac. Some preliminary results of error scans open for discussion Javier Resta Lopez JAI, Oxford University.
Emittance Tuning Simulations in the ILC Damping Rings James Jones ASTeC, Daresbury Laboratory.
DMS steering with BPM scale error - Trial of a New Optics - Kiyoshi Kubo
ATF2: Laser-wire Scheduling Strategy Grahame Blair Current Status Funding application Possible Scheduling Strategy Second ATF2 Project Meeting, KEK, 31.
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
Simulation of the α, dispersion, coupling and β multiknobs in large β optics Sha Bai, Philip Bambade, Benoit Bolzon, Javier Resta Lopez
Status of EXT coupling measurement analysis 9 th ATF2 project meeting C.Rimbault (LAL) S. Kuroda, T. Tauchi, N. Terunuma (KEK), G. White, M. Woodley (SLAC)
1 RTML Emittance Measurement Station Yuri Kubyshin (1), Robert Apsimon (2), Hector García (1,2) (1) Technical University of Catalonia (UPC) (2) CERN CLIC.
Tuning Knobs for ATF2: An Update Anthony Scarfe, James Jones The Cockcroft Institute LCWS’07 31 st May 2007.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
Status and plan of Beta-matching in Extraction line Kiyoshi Kubo.
Wakefield effect in ATF2 Kiyoshi Kubo
ATF2 Lattice v4.5 Matching and Tuning Performance with Lucretia Glen White, SLAC LCWS2011 Granada, Spain.
2nd ATF2 Project Meeting (May 30, 2006)M. Woodley [SLAC]1 ATF2 Layout/Optics (v3.3) nBPM (SLAC) nBPM (KEK) FONT Compton / laserwire ODR Existing ATF Extraction.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
8 th February 2006 Freddy Poirier ILC-LET workshop 1 Freddy Poirier DESY ILC-LET Workshop Dispersion Free Steering in the ILC using MERLIN.
4 th ATF2 Project Meeting, 31 May 2007 A. Seryi 1 Summary of SLAC simulation study of emittance growth in the ATF extraction line SLAC team: J. Amann,
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
ILC BDS Alignment, Tuning and Feedback Studies
Show that the (beam size ^2) varies quadratically with distance in a drift section with no quadrupoles.
Emittance Dilution and Preservation in the ILC RTML
Beam Dynamics in Curved ILC Main Linac (following earth curvature)
at Royal Holloway Univ. London
Coupling Correction at the Australian Synchrotron
ILC BDS Emittance Diagnostics: Design and Requirements
Beam Optics Set-Up at SLAC End Station A
3rd ATF2 Project Meeting, December 18-20, 2006
Emittance Diagnostics
Emittance Diagnostics
ATF2 Layout/Optics (v3.6) Existing ATF Extraction Line
Motivation Technique Simulations LCLS LCLS DOE Review, April 24, 2002
DTL M. Comunian M. Eshraqi.
ILC Beam Switchyard: Issues and Plans
Presentation transcript:

Optics for Skew Correction and Emittance Measurement Leo Jenner This talk is going to look familiar if you were at the recent LC-ABD meeting in Manchester…

2 4D symmetric beam matrix =  Coupling terms To minimise the vertical emittance, especially for a flat beam, it is desirable to remove any cross-plane (x-y) correlations/couplings

3 Sources of Skew Linac is main source of skew in ILC Skew correction section comes immediately afterwards and is the first sub-system of BDS

4 Ideal Skew Correction + Emittance Measurement Layout 4 orthogonal skew quadrupoles correct xy, x’y’, x’y, xy’ 4 wire scanners / laser wires for emittance measurement

5 4D measurement simulation – 6 wire scanners required Measured Emittance Input Emittance Perturbed Projected Emittance Unperturbed Projected Emittance High Rejection Factor with realistic measurement errors

6 2D Measurement simulation with 4 wires scanners Only 4 scanners – shorter, cheaper Scan in x and y separately Coupling is inferred from difference between measured and expected emittance – it seems this is good enough! Calculated projected emittance Unperturbed projected emittance

7 Correction procedure Perturb beam with skew quads Perturb beam with skew quads Measure beam parameters with scanners Measure beam parameters with scanners Infer coupling Infer coupling Calculate skew correction Calculate skew correction Apply to skew quadrupoles Apply to skew quadrupoles (Iterate) (Iterate)

8 Skew Quad Scanning Scan quad strength around nominal value to find minimum Fit parabola Extract parameters

9 Coupling Correction in Action Skew Quad Scan Number Projected/Actual emittance

10 Application1: ATF2

11 Application 2: ILC BDS Skew Section

12 Summary and Future Plans Use ‘real’ ILC errors Use ‘real’ ILC errors Investigate alternative 4D methods Investigate alternative 4D methods Investigate 2D/4D and/or BPM method Investigate 2D/4D and/or BPM method Incorporate simulation of Laserwire Incorporate simulation of Laserwire Tweaking of ATF2/ILC optics Tweaking of ATF2/ILC optics