Trending ACD performance Parameters of interest Online tests (CPTs) TCI (charge injection) -> PHA TCI -> Veto mapping Timing PHA Pedestals Offline tests.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
Advertisements

June 1, 2005Milagro Collaboration Meeting TPed Shifting and the Crab Curtis Lansdell University of Maryland.
1 Summary on the Wednesday access of BBC FEM 07/28/05 Kazuhisa Yamaura Koutaro Kijima Daisuke Watanabe Misaki Ouchida.
Veto Wall Test Hyupwoo Lee MINERvA/Jupiter Group Meeting Feb, 13, 2008.
Checking the Acd hardware veto setting The hardware veto is generated in the front-end electronics Discriminator with coarse and fine settings Both are.
SVAC/ISOCInstrument Analysis Workshop, February 27, 2006 Anders W. Borgland 1 Overview Of LAT Data Taking Anders W. Borgland Science Verification, Analysis.
GLAST LAT Project Instrument Analysis Workshop 6 – 06/02/27 F. Piron & E. Nuss (LPTA) 1 Trending CAL performance and mapping crystals Gamma-ray Large Area.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
Analysis of AcdPedestal during EMI runs During the EMC-EMI scans we are looking for discrete changes in the behavior of the ACD as we scan the frequency.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT Project11/18/04 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review Particle Test Elliott.
GLAST LAT Project IA weekly meeting, February 3, 2006 ACD subsystem Alex Moiseev 1 ACD Pedestals ACD Team at Goddard: Alex Moiseev Dave Thomspon Bob Hartman.
GLAST LAT ProjectOnline Roadmap Progress Report – April 22, 2004 R. Claus1 Online Roadmap to the July 2004 Freeze Progress report for April 22, 2004 (to.
GLAST LAT Project Instrument Analysis Workshop 5 – 05/08/29 F. Piron & E. Nuss (IN2P3/LPTA – Montpellier) 1 Comprehensive review of CAL calibrations Gamma-ray.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT Project LAT Instrument Analysis Meeting – May 26, 2006 Hiro Tajima, TKR Efficiency Trending 1 GLAST Large Area Telescope: TKR Efficiency Trending.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
SVAC Instrument Analysis Meeting Aug 5, 2005 E. do Couto e Silva and Anders W. Borgland 1/7 SVAC 8 tower testing+ACD Anders and Eduardo.
GLAST LAT Project LAT System Engineering 1 NCR Status Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
SVACInstrument Analysis Meeting, January 13, 2006 Anders W. Borgland 1 Data Is (Nearly) Here! Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT Project IA Workshop, July 14, 2005 ACD subsystem Alex Moiseev 1 GLAST Large Area Telescope: IA Workshop July 14, 2005 AntiCoincidence Detector.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
Alex Moiseev NASA/GSFC 12/16/2005 Some ACD Calibration issues I.ACD mip peak monitoring 1. ACD mip peak monitoring requires the measurements to be done.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
SVACInstrument Analysis Meeting, October 21, 2005 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
ACD calibrations Pedestals Measured from online script Measure PHA w/ HV off, no charge injection Use cyclic triggers ~ ADC counts, very narrow.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test L. Miller 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
Sep/26/05Trigger test plan Trigger ACD/LAT Test Plan Eric Grove, Martin Kocian, Su Dong.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
MuTr HV Optimization RIKEN/RBRC Itaru Nakagawa 1.
ACD Calibrations in L&EO Needed Calibrations Pedestals (low and high range) Low range gains via MIP peak positions Veto and HLD discriminator set points.
GLAST LAT ProjectDelta PDR/Baseline Review July 29-August 1, 2002 Section 7.3 AntiCoincidnce Detector Technical Status 1 GLAST Large Area Telescope: AntiCoincidence.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
GLAST LAT Project SVAC Workshop, February 27, 2006 ACD subsystem Alex Moiseev 1 GLAST Large Area Telescope: SVAC Workshop February 27-28, 2006 AntiCoincidence.
GLAST LAT Project LAT Instrument Analysis Workshop – Feb 27, 2006 Hiro Tajima, TKR Data Processing Overview 1 GLAST Large Area Telescope: TKR Data Processing.
1 BNL report ~ the history of Run7 start up ~ Yoshihide Nakamiya.
T0 offline status Alla Maevskaya for T0 team 8 March 2011 ALICE offline week.
1 SDD: DA and preprocessor Francesco Prino INFN Sezione di Torino ALICE offline week – April 11th 2008.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 9 of 12 LAT Test Results 1 GLAST Large Area Telescope LAT Pre-Shipment Review LAT.
GLAST LAT ProjectI&T Test Planning Telecon, 8 Nov 2004 CAL Test and Calibration DefinitionJ. Eric Grove GLAST LAT GLAST LAT Calorimeter Subsystem Gamma-ray.
GLAST LAT Project Instrument Analysis Meeting– Feb 28, 2006 Tsunefumi Mizuno TowerTrend_ ppt 1 Tracker Parameters Trending Monitor GLAST I and.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
GLAST LAT Project LAT Instrument Analysis Meeting– Aug 29, 2005 Hiro Tajima, TKR Updates at SLAC 1 GLAST Large Area Telescope: TKR Updates at SLAC Hiro.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
Acd Veto Latching The Acd front end electronics generate a veto primitive when a discriminator goes above threshold. But. The signal is split: One path.
Calorimeter Status Electronics Installation and Commissioning
Overview of Acd Reconstruction
Single-CAL Test and Calibration
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
Calorimeter calibrations with Flight Software.
Overview Goal Study GEM variables in SVAC ntuple
GLAST LAT System Engineering
GLAST LAT System Engineering
GLAST Large Area Telescope: I&T Test Readiness Review
Eduardo do Couto e Silva Feb 28, 2006
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

Trending ACD performance Parameters of interest Online tests (CPTs) TCI (charge injection) -> PHA TCI -> Veto mapping Timing PHA Pedestals Offline tests (muon runs) PHA Pedestals MIP peaks Test phases 20 CPTs GSFC, SLAC) Hot & cold in GSFC W/ and W/out LICOS/FSW 5 blocks (20 sub-blocks) of muon runs in Jan. and Apr.

CPT Test Phases At GSFC (08/05 – 09/05) Reference (not shown) PostVibe (1) Cold_1, Cold_2, Hot_2, Cold_3, Hot_3, Cold_4 (2-7) tvac_ambient, tvac_dooropen (8-9) At SLAC Pre-install (09/05) (off LAT, EM GASU) (10) Lat_1, Lat_2 (12/05) (11-12) Voltage drop b/c of Veto driver issue Licos (13-19) Various timing changes Hitmap delay (5  16), hold delay, trg_seq (80  89) Test point 13 was actually done with LATTE, but with LICOS-style scripts The TCI-strobe, poll trigger sequence is different from LATTE

Pedestal from online script GSFCSLAC TVAC LICOS/FSW (April 06) LATTE (‘05) In SLAC runs outliers are all from GAFE 17 channels Zero suppress is Set at 15 counts One Entry Per PMT

Hitmap Latching Delay GSFCSLAC TVAC LICOS/FSW (April 06) LATTE (‘05) Changing trg_seq from 80 to 89 caused a corresponding 9 count shift in the optimal hitmap_delay (delay before latching the discriminator status) One Entry Per PMT

Front End Hold Delay Timing GSFCSLAC TVAC LICOS/FSW (April 06) LATTE (‘05) The values at -35 are null values from a failed test. Otherwise this just reflect the change in trg_seq There is more scatter than hitmap delay b/c this is the analog hold time One Entry Per GARC

TCI to PHA mapping GSFCSLAC TVAC LICOS/FSW (April 06) LATTE (‘05) Need to confirm that effects in TP come from new strobe-poll sequence & that they were corrected by the trg_seq change One Entry Per GARC

TCI Linearity & Noise GSFCSLAC TVAC LICOS/FSW (April 06) LATTE (‘05) Moving from ACD- only to full LAT seems to have increased the noise in the TCI runs and slightly affected the goodness of fit This is just more scatter in the points, not non- linearity One Entry Per PMT

TCI to Veto Mapping GSFCSLAC TVAC LICOS/FSW (April 06) LATTE (‘05) One Entry Per PMT Many channels changed about 8-10% with LICOS (also changed hitmap_delay) The NA channels changed by up to 50%

Muon Run Test Phases Reference is Jan. SVAC runs Block 1 (04/04 – 04/18) Both Veto Drivers Enabled -> small Voltage FE (~3.2V) 10 “sub-blocks” of runs (~ 10 M events) each LAT-7xx and B-31 runs Block 2 (04/20 – 04/26) Single set of Veto Drivers -> FE voltages close to nominal (3.3V) 8 “sub-blocks” LAT-7xx runs Block 3 (04/27 – present) Using veto settings and zero suppression values from veto scan done on 04/26 2 “sub-blocks” as of 04/28 Sub-block 1 is ACD triggered.

PHA Pedestals from muon runs Reference is Jan. SVAC B-13 runs The first block of muon runs were taken with both sets of veto drivers enables. This caused a voltage sag which affected the pedestals, esp. on the GAFE 17 channels One Entry Per PMT

Muon Peak positions Block 1Block2Block3 Two of the subsets were taken with the LAT on its side Many of the tiles had limited statistics & poorer fits One subset was taken w/ the ACD only allowed to trigger the LAT. Tiles not used in the trigger have low statistics & poor fits One Entry Per PMT

Summary Tools in place to trend ACD performance All basic quantities being tracked Some cross checks should be implemented Online v. Offline Pedestals, Veto Offset, Slope Most features of trending analysis understood Hitmap & Hold timing ok Pedestals ok, both online & offline Depended on FE TCI  PHA mapping ok Depended on trg_seq setting TCI linearity got worse on LAT, but steady since install TCI  Veto mapping changed w/ LICOS / FSW runs Still need to understand this Muon MIP peaks very steady