SciFi Tracker Beam Test outline The performance TOF which is needed to Beam Test & Guide7 Simulation TOF calculation TOF ACC estimation test for Beam Test.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

SKS Minus Detectors in detail Tohoku Univ. K.Shirotori.
TJR Feb 10, 2005MICE Beamline Analysis -- TRD SEPT041 MICE Beamline Analysis – TRD SEPT04 Tom Roberts Muons, Inc. February 10, 2005.
KEK beam test H. Sakamoto. Purpose To optimize a concentration of the second dopant for scintillating fibers KEK beam test to study light yields for various.
1 EMCal & PID Rikard Sandström Universite de Geneve MICE collaboration meeting 26/6-05.
30 March Global Mice Particle Identification Steve Kahn 30 March 2004 Mice Collaboration Meeting.
1 Downstream PID update Rikard Sandström PID phone conference
KEK Analysis Report Makoto Yoshida Osaka Univ. 2006/06/10 MICE CM15.
TJR Sept 22, 2004MICE Beamline Analysis -- SEPT041 MICE Beamline Analysis – SEPT04 Tom Roberts Muons, Inc. September 22, 2004.
1 September 09Mark Rayner – Emittance measurement by The TOFs1 Emittance measurement by the TOFs Via trace space reconstruction of individual muons. Complementary.
Mar 31, 2005Steve Kahn -- Ckov and Tof Detector Simulation 1 Ckov1, Ckov2, Tof2 MICE Pid Tele-Meeting Steve Kahn 31 March 2005.
1 PID Detectors & Emittance Resolution Chris Rogers Rutherford Appleton Laboratory MICE CM17.
KEK Beam Test Koji YOSHIMURA KEK MICE Collaboration Meeting Koji YOSHIMURA KEK MICE Collaboration Meeting
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
Review of PID simulation & reconstruction in G4MICE Yordan Karadzhov Sofia university “St. Kliment Ohridski” Content : 1 TOF 2 Cerenkov.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
Simulated real beam into simulated MICE1 Mark Rayner CM26.
1 KEK Beam Test Analysis Hideyuki Sakamoto 15 th MICE Collaboration Meeting 10 st June,2006.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
MICE tracker meeting Prototype TOF test for tracker KEK Osaka university Atsushi Horikoshi.
1 G4MICE Analysis of KEK Test Beam Aron Fish Malcolm Ellis CM15 10th June 2006.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
Jun 27, 2005S. Kahn -- Ckov1 Simulation 1 Ckov1 Simulation and Performance Steve Kahn June 27, 2005 MICE Collaboration PID Meeting.
18 August 09Mark Rayner – Momentum measurement by The TOFs1 Momentum measurement by the TOFs A correction to an O(4 MeV/c) bias on the current muon momentum.
TOF/ACC test Overview M. Yoshida Osaka Univ.. TOF / ACC in the prototype test For the prototype test in May, we will need PID: –TOF counter Distinguish.
1 EMCal design MICE collaboration meeting Fermilab Rikard Sandström.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Report of the NTPC Test Experiment in 2007Sep and Others Yohei Nakatsugawa.
ハイパー核ガンマ線分光用 磁気スペクトロメータ -SksMinus- 東北大学 大学院理学研究科 白鳥昂太郎 ATAMI.
New particle ID detector for Crystal Ball at MAMI-C Daniel Watts, University of Edinburgh John Annand 1, B. Briscoe 3, A. Clarkson 2, Evie Downie 1, D.
Measurement of 'intrinsic' properties of scintillating fibers H. Sakamoto Osaka University, Japan A.Sato M. Yoshida Y. Kuno Osaka Univ. K. Yoshimura KEK.
Feb 10, 2005 S. Kahn -- Pid Detectors in G4MicePage 1 Pid Detector Implementation in G4Mice Steve Kahn Brookhaven National Lab 10 Feb 2005.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
Status of Aerogel detector for high pT upgrade at PHENIX Budget from US-J project for next two years : (1) 400 liters of Aerogel (2) 600 photomultiplier.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
PANDA FTOF Prototyping Anton A. Izotov, Gatchina
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
PANDA Anton A. Izotov, Gatchina A.A.Izotov, Gatchina, PANDA Forward TOF Walls. Side TOF walls in dipole Magnet SiPM/PMT187.
PID for super Belle (design consideration) K. Inami (Nagoya-u) - Barrel (TOP counter) - Possible configuration - Geometry - Endcap (Aerogel RICH) - Photo.
A search for deeply-bound kaonic nuclear states in (in-flight K -, N) reaction Hiroaki Ohnishi RIKEN.
MICE PID size &scraping MICE CM16, RAL, Oct V. Palladino, Univ & INFN Napoli for R. Sandrstrom and others contributing to this effort Yagmur, Holger,
MEG Run 2008 液体キセノンガンマ線検出器 東京大学 素粒子物理国際研究セン ター 西村 康宏、 他 MEG コラボレー ション 2008 年秋季物理学会@山形大学小白川キャンパス.
Nov Beam Catcher in KOPIO (H. Mikata Kaon mini worksyop1 Beam Catcher in the KOPIO experiment Hideki Morii (Kyoto Univ.) for the KOPIO.
KEK beam test in May 2005 Makoto Yoshida Osaka Univ. MICE Frascati June 27 th, 2005.
SksMinus status Hyperball collaboration meeting 2009/3/11 K. Shirotori.
Frank L. H. WolfsDepartment of Physics and Astronomy, University of Rochester Status of the TOF February 22, 2001 Straight-line tracking What have we learned?
NuFact02, July 2002, London Takaaki Kajita, ICRR, U.Tokyo For the K2K collab. and JHF-Kamioka WG.
PID simulations Rikard Sandström University of Geneva MICE collaboration meeting RAL.
2005/10/24 MICE CM at RAL, KEK test beam, Makoto Yoshida 1 KEK Beam Test for MICE SciFi Tracker - KEK-PS T585 - M. Yoshida MICE 2005/10/ /10/24.
KEK Test Beam Phase I (May 2005) Makoto Yoshida Osaka Univ. MICE-FT Daresbury Aug 30th, 2005.
00 Cooler CSB Direct or Extra Photons in d+d  0 Andrew Bacher for the CSB Cooler Collaboration ECT Trento, June 2005.
Performance of Shower Maximum Detectors Saori Itoh (Shinshu Univ.) GLC calorimeter group (KEK,Kobe,Konan,Niigata,Shinshu,Tsukuba) Introduction Detector.
J-PARC でのハイパー核ガンマ線分光実験用 散乱粒子磁気スペクトロメータ検出器の準備 状況 東北大理, 岐阜大教 A, KEK B 白鳥昂太郎, 田村裕和, 鵜養美冬 A, 石元茂 B, 大谷友和, 小池武志, 佐藤美沙子, 千賀信幸, 細見健二, 馬越, 三輪浩司, 山本剛史, 他 Hyperball-J.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
M. Bonesini - CM 22 RAL October 081 TOF0 status M. Bonesini Sezione INFN Milano Bicocca.
TOF Reconstruction, Calibration & Test-beam Simulation Jiang Linli 2005/6/1 (13th BES Annual Meeting )
Tracker Summary M. Yoshida (Osaka Univ.) MICE 2005.Feb.12 th.
Design of Time zero(T0) counter contents Characteristic of p+p collision Time of Flight method Systematic scintillator performance Scintillator selection.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
TOF Emittance Emittance measurements with the TOFs Mark Rayner 4 December 2008.
Tracker Neutron Detector: INFN plans CLAS12 Central Detector Meeting - Saclay 2-3 December 2009 Patrizia Rossi for the INFN groups: Genova, Laboratori.
Prospect of SiPM application to TOF in PANDA
Seoul National University On behalf of J-PARC E18 Collaboration
TOF Software and Analysis Tools
Measurement of track length and time-of-flight hypothesis
Central detector for CLAS12: CTOF and Neutron detector
T32 status as of 17-Oct.
New particle ID detector for Crystal Ball at MAMI-C
Presentation transcript:

SciFi Tracker Beam Test outline The performance TOF which is needed to Beam Test & Guide7 Simulation TOF calculation TOF ACC estimation test for Beam Atsushi Horikoshi, Osaka-U

phase Ⅰ :estimate of basic SciFi tracker performance particle tracking w/magnetic field, detection efficiency, high beam rate performance phase Ⅱ :detailed test low momentum μ(300 ~ 400MeV/c) detection, reconstruction of emittance ’ 05 Beam Test : SciFi Tracker test schedule

Phase Ⅰ setup ( Apr 2005, KEK pi2 ) 5x5 hodoscpe

to estimate longitudinalμmomentum, SciFi tracker is put in magnetic field magnetic field : superconducting magnet, Super-JACEE(1T) L Phase Ⅰ: particle tracking in magnetic field

Phase Ⅱ setup (Oct 2005, KEK pi2) ・ μmomentum : 300~400MeV /c ・ low beam rate ・ but, defuser makes many condition of beam

TOF timing resolution to devide pi & μ π-μ sigma=50ps ・ ~700MeV/c PID>3σ ( >99.7% ) ・ 1GeV /c PID=1.65σ ( >95% ) Phase Ⅰ (high σ<50ps needed ! π 2 beamline : μ,e,π,p ⇒ we want to select μ momentum(MeV/c) TDC(ns)

shape of TOF unit : mm ・ very long light guide ⇒ to avoide strong magnetic field ・ PMT:R6504S fine mesh PMT (used by BESS, 19DY, strong resistance of magnetic field)

S-JACEE side view magnetic PMT 3000 GAUSS TOF shape requirement

magnetic PMT ⇒ PMT direction is parrarel to magnetic field

TOF shape requirement magenta : scintillator length : 40cm long light guide : 50cm front view : isotropical position ⇒ same magnetic field ・ long light guide : lower resolution (60ps) near to SciFi tracker It is easy to make isotropical poistion ・ short light guide : high resolution (50ps per counter) but, design of light guide is very difficult we selected long TOF

guide7 Simulation timing resolution of counter 64.59ps per PMT If PMT resolution is same, σ(counter)=1/1.41σ(PMT) ⇒ 45.80ps per counter

TOF & ACC estimation testπ 2 Beam Line(KEK) ’ 05 2/1~2/7 done define beam position of TOF ・ coincidence with ref1 & ref2 ・ coincidence with ref1 & cube ref 1 & ref 2 : 100mm x 5mm(t)

TOF construction scintillator & light guide is wrapped by Aluminized Mylar(50μmthin) scintillator EJ230(BC420) EJ204(BC404)

ACC construction 10PMTs used acc index : 1.03

beamline setup right: ref1&ref2 down:beamline setup

estimation of the resolution(preliminary) TOF1rt-TOF1lt ⇒ effect of external counter of sigma is center of counter σ=1.662count 28.8ps/count ⇒ 47.8ps Guide 7 Simulation 45.8ps

measurement of resolution(preliminary) all plots are time walk calibrated

position dependence of resolution (preliminary) good resolution~ pos

summary We performed TOF & ACC estimate pi2 beam line, in feb1st~feb7th TOF timing resolution is sufficiently to distinguish pion calculated resolution is ~ 50ps