CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak.

Slides:



Advertisements
Similar presentations
Status of Sensor and Hybrid Production LHCb Zurich Week T. Bowcock.
Advertisements

Status Brussels GANTRY Ê We have observed a significant influence due to temperature 4 we had a lot of problems with our cooling system (ventilation) Ë.
Module Production Brussels Ê Problems with vacuum chambers in plate solved 4 Almost all plates back in Brussels (repaired in Aachen) Ë Problem with rotation.
US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
TEC Production in the US N. Bacchetta, J. Incandela,…and October 14, 2003.
Tracker Week – UCSB Gantry Status – April 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara Dean White.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
1 UCSB Module Assembly Week of 5/16-5/20. 2 UCSB Parts Inventory 5/23/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd
TEC Production in the US J. Incandela Level 2 Manager US CMS Silicon Tracker Project October 8, 2003.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
Recent TOB Developments First LT failure and Stereo Module Status J. Incandela With slides provided by E. Chabalina, A. Affolder, Dean White.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
Zachary Wolf Undulator Tuning June 17, 2008 Undulator Tuning Status Z. Wolf, S. Anderson, R. Colon, S. Jansson, S.Kaplunenko,
Tracker Week – UCSB Gantry Status – Febuary 10, 2004 – Dean White 1 Gantry Status University of California Santa Barbara UCSB Gantry Team: Andrea Allen.
Slide 1CMS Database Issues-Derek BargeDOE review, January 20, 2004 CMS Database Issues Derek Barge.
CMS Week – UCSB Gantry Status – March 15, 2005 – Dean White 1 Weekly Status Report Production: 84 hybrids bonded last week, all tested fine. 45 modules.
1 UCSB Module Assembly Week of 5/23-5/27. 2 FNAL & UCSB Inventory HybridsSensorsFrames FNALUCSBFNALUCSBFNALUCSB STHPKITSTHPKITSTHPKITSTHPKIT L12pu /
1 UCSB Module Assembly Week of 4/11 – 4/15. 2 UCSB Parts Inventory 4/4/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
1 CMS week 15/03/05, Module Production Meeting, Dean White - UCSB Status of Sensor Bias Connection Dean White For the US CMS Group.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
1 UCSB Module Assembly Week of 5/9-5/13. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 7 July 2003 Sam Burke UCSB HEP Group.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
1 UCSB Module Assembly Week of 5/2-5/6. 2 UCSB Parts Inventory 5/9/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu L12pd L12su
1 UCSB Module Assembly Week of 4/25 – 4/29. 2 UCSB Parts Inventory 5/2/05 Hybrids Sensors Frames STHPKITSTHPKIT L12pu ST193 L12pd ST193.
Uli Schäfer 1 JEM: Status and plans Production / commissioning Plans.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
Individual Subsystem Testing Report New Jersey Space Grant Consortium with Rutgers University Stevens Institute of Technology 2/13/2012.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
G. Steinbrück 6/21/ Premounting of AOHs for the TEC in Hamburg Georg Steinbrück Hamburg University AOH Meeting, CMS Week 6/21/2005  Status of AOH.
CMS Tracker Week, CERN, Oct Oct 2005CMS Tracker Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Brussels Gantry Ê Problems with vacuum chambers in plate 4 mostly solved by the workshop in Aachen (thanks) Ë Problem with rotation motor (U-motor) 4 motor.
Status Brussels GANTRY
US Module Production Status
Vienna Module Production
UCSB Module Assembly Week of 11/28 – 12/2/05 Week of 11/28 – 12/2/2005.
Module Production in Brussels
Hybrid Status/Deliveries
OGP Surveying & DB Entry
L.Fiore Gantry Meeting during the CMS TK week
Module Production in Brussels
UCSB Module Assembly Week of 12/5 – 12/9/05 Week of 12/5 – 12/9/2005.
TOB Module Production Overview and Plan
Wirebonding UCSB FNAL Machines
Recent TOB Developments
Recent TOB Developments
FNAL Hybrid Testing Status
Presentation transcript:

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave Staszak Russell Taylor (unfortunately he has gone back to London) Dean White

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 2 Overview 1.Review module re-measure data on our 5 TOB assembly plates. 2.Update on recently commissioned R5 & R6 assembly plates. 3.Other miscellaneous items.

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 3 TOB Module Re-Measurement  As reported at the last Tracker meeting, we discovered a problem with the consistency of module measurements on in a couple positions on our 5 TOB assembly plates.  After replacing several damaged mounting pins and recessing them all as far as practical, we did a re- measure of 3 modules on all positions on the 5 TOB assembly plates.  The following charts show all the x axis values and the sensor angles (S1, S2, & delta S1/S2).  The original after-cure surveys for each of the 3 modules used showed the x values all within +/-6 um.

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 4 Module 5160 Re-Measurement Sili1-x1 Sili1-x2 Sili1-x3 Sili1-x4 Sili2-x1 Sili2-x2 Sili2-x3 Sili2-x4 S1 ANGLE S2 ANGLE S1-S2 ANGLE

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 5 Module 5115 Re-Measurement Sili1-x1 Sili1-x2 Sili1-x3 Sili1-x4 Sili2-x1 Sili2-x2 Sili2-x3 Sili2-x4 S1 angle S2 angle S1-S2 angle

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 6 Module 5141 Re-Measurement Sili1-x1 Sili1-x2 Sili1-x3 Sili1-x4 Sili2-x1 Sili2-x2 Sili2-x3 Sili2-x4 S1 angle S2 angle S1-S2 angle

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 7 Module Re-Measurement Conclusions  The Y axis values for the 3 modules all re-measured under 20 microns with the majority of the measurements being under 10 – looked fine.  For module 5115, the range of measurements is the same (~ +/- 25 microns) as the other two but they are shifted in the positive direction. This seems to be a characteristic of the module which was built before we reworked and re-measured all the pins on these plates.  As can be seen by this data the x axis accuracy when mounting the modules in rods at the end away from the pins could be up to +/- 25um larger than the module after- cure survey.

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 8 Assembly Plate Status Assy Plate Type # Fabricated # Commissioned# Modules Built On TOB R-phi755 TOB Stereo311 TEC R5 R-phi222 TEC R5 Stereo222 TEC R6553 Total191513

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 9 Survey Results–6 New Assy Plates Over the last month we have built our 1 st modules on 2 – R5N, 2 – R5S and 2 – R6 assembly plates. Following is some of the final survey data on those 18 modules:

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 10 Survey Results Sensor Angles

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 11 Survey Results Hybrids

CMS Week – UCSB Gantry Status – June 8, 2004 – Dean White 12 Other Miscellaneous Items Assembly Plate Commissioning Procedures: I have made a list of the steps we go thru in commissioning an assembly plate. This is available at: (I will put a link on our gantry webpage when I get back) Other items that Russell recently posted on the UCSB gantry site: A copy of the UCSB gantry code A copy of the UCSB OGP code. Soon to come: A CMS Note on module production at UCSB (Russell is still completing final editing).