Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.

Slides:



Advertisements
Similar presentations
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Advertisements

Joe Frisch LCLS FAC Oct. 30, Linac/BC2 Commissioning (Dec through Sep., 2008) J. Frisch, et al. LCLS FAC Meeting.
Eric Bong LCLS FAC Injector-Linac April 7, 2005 LCLS Injector/Linac Systems Update E. Bong LCLS FAC April 7, 2005 LCLS.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
RF Waveguide & Structures Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Jose Chan FAC - BC2/Linac Installation Status & 4/16/07 1 BC2/Linac Installation Status & Schedule Jose Chan.
P. Emma, SLACLCLS FAC Meeting - April 29, 2004 Linac Physics, Diagnostics, and Commissioning Strategy P. Emma LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.
Paul Emma LCLS Commissioning Status Nov. 11, 2008 SLAC National Accelerator Laboratory 1 LCLS Commissioning Status P. Emma for The.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
LCLS Linac Long Lead Procurement Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator.
New 135-MeV injector energy requires minor changes to linac operating point…
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
RF Systems and Stability Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Hamid Shoaee LCLS Facility Advisory Committee 20 April Plans for 2006 Installation April 20, 2006 Injector commissioning.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
C.Limborg-Deprey LCLS FAC, Oct Oct 27th Injector Physics C.Limborg-Deprey GTL final design Wakefield budget Final.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
Marjorie Widmeyer LCLS Injector Magnet Power March 30, LCLS Injector, Sector 21 and BC1 DC Magnet Power and Control.
WIR SCHAFFEN WISSEN – HEUTE FÜR MORGEN Steps towards beam commissioning: RF system group Paolo Craievich :: RF Section :: Paul Scherrer Institut SwissFEL.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
Thermal emittance measurement Gun Spectrometer
Injector Performance Requirements Conventional Facilities Update
LCLS Injector: Introduction D. H
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LCLS Gun Commissioning Status & Plans David H
Electron Source Configuration
Advanced Research Electron Accelerator Laboratory
Linac/BC1 Commissioning P
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Commissioning P. Emma, et al
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Linac LLP Outline LINAC Long Lead Procurements
Linac Physics, Diagnostics, and Commissioning Strategy P
Linac Diagnostics Commissioning Experience
LCLS Injector Commissioning P
Two-beam Test-stand Design and Construction Status
E-Beams Systems Manager
LCLS Injector System Overview D. H
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Electron Beam Systems ETC and Methodology
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
LCLS Control System Personnel Linac & BC2 Controls progress
Injector Physics C.Limborg-Deprey Feb.8th 2006
LCLS e- Beams Systems Manager
Injector/Linac RF Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005 LCLS

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector - Linac System Overview Installation – Progress & Emphasis Region Designs Diagnostics Gun, Linac & RF

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector and Linac Installation Dates (RF phase:  rf = 0 is at accelerating crest) SLAC linac tunnel research yard Linac-1Aug-Nov2006Linac-2July-Sep2007Linac-3July-Sep2007 BC-1 Aug- Nov 2006BC-2July-Sep2007 LTU Oct 2007 Dec 2007 DL-1Aug-Nov2006 undulator SLAC linac 21-1b21-1d X RF Gun Nov b24-6d25-1a30-8c E-Dump Dec 2007 Feb 2008 Inj Vault Jun-Jul2006 L0a&b rfgun Installation in SLAC Linac tunnel only during down-time Forces priority to components and systems in Linac housing Linac-X Aug-Nov2006 Linac Down: August – November 2006 July – September 2007

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector Installation Drive Laser June 2006 Laser Launch July 2006 Gun Region July 2006 Accel Region June 2006 Heater Region June 2006 Wall Region October 2005 Injection Region Aug-Nov 2006 Spect Region Aug-Nov 2006 Waveguide through wall and up penetration October 2005 Gun installation November 2006 Following Hot Test in Klystron Lab Injector Commissioning Start December 2006 Priority – Linac Housing Installation

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Linac 2006 Installation Quad + BPM, YCOR,XCOR, QE, Toroid Emittance Diagnostics. Bunch Compressor & Diagnostics Two short accelerator structures, refurbished Quads+BPMs,X&YCOR Linac 1 (L1) Electrons Bunch Compressor 1 (BC1) L1 design and details complete & in fab Short structures available X-Band design complete & in fab BC1 Compressor articulation design & details complete & in fab BC1 emittance diagnostics section design going BLM moved to SLAC design, two devices, need for feedback Must install during 2006 downtime Remove 5 S-Band Structures X-Band Structure (NLC) LX

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector Wall Region Spans through shielding walls separating Injector Vault form Linac Housing. October 2005 installation included pipes through walls and stopper installation of wire scanners, profile monitors and quad on Linac side of shielding wall. Device designs complete and in fab or on hand. Low risk for 2006 install.

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector Insertion/SAB Region Support modal analysis complete stiffened as result to meet vibration tolerance. Common OTR optics design late. Special OTR at spect end from ANL. Magnets designs complete. On order or received except spect bend. Chamber designs complete. Second least mature region design.

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 L1 Region All detail drawings complete and part on hand or in fabrication less correctors Low risk for 2006 installation

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 XL4 Klystron fabrication complete. Waveguide fabrication in progress. Structure support design complete & in fab Need LLRF, modulator mods Vacuum assy install required. Region operation not necessary for ’06/’07 commissioning. X-Band System (LX)

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 BC1 Articulation Region Design Beamline segment from X-Band system to structure BC1-Out diagnostics section. Compressor articulation in fabrication at outside vendor. Fabrication halted and restarted to modify chamber to provide sufficient aperture for BLM. Manget design reviewed at vendor. Compressor diagnostics incomplete. Manpower added. Most risk in diagnostics package; collimator, BPM & OTR.

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 BC1-Out Region Design Beamline segment from BC1 compressor articulation to structure Li21-2b. Downstream emittance section layout complete. Uses existing wire scanner, quadrupole, stopper and BPM designs with support stands modified to mount on accelerator lightpipe. Collaboration with UCLA on single shot bunch length monitor dropped. Design to be done at SLAC. Two devices to be built. See later talk. Design most at risk. Relative bunch length measurement required for RF feedback. SLAC Engineer and top physics support assigned to BLM project

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector Vault Installation of stub columns started. Water system design critical to commissioning start.

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector Waveguide Design Installation penetration-wall October ’05 Installation Vault & Gallery starting Spring ’06. Waveguide design complete, fabrication underway. Waveguide supports in final design. 3-D Layout integrated into Injector system assembly. Gun and structures fed from Li-20-6, 7 & 8 klystrons, T-Cav fed from Li-20-5d structure exhaust. Old waveguide runs have been disconnected from Klystrons.

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector Gun Region Installation July 2006 except gun November 2006 Component designs in check Gun in fabrication hot test to be performed in Klystron test lab must have priority Solenoid delivered Spectrometer bend design complete YAG/OTR optics package incomplete Base support design incomplete

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector Accelerator Region Installation June 2006 Dual feed structure in fabrication Quads delivered Solenoid due next week Need floor support design L0a and solenoid on common support girder to allow relative alignment in lab prior to install.

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector Heater Region Design Beamline segment Between Accelerators and Shielding Wall Installation June 2006 Undulator installation 2007 Transverse structure on hand. Quads received OTR actuator design complete need optics Bend magnet design reviewed at vendor Floor support design in progress

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Region Design Status (2006 Install) Linac Housing First Priority (due to fixed down) Wall RegionComplete Insertion RegionIn Process SAB Spectrometer RegionIn Process L1Complete LXComplete BC1Articulation Complete, BC1-Out In Process Injector Vault Second Priority Gun RegionIn Process Accelerator RegionIn Process Heater RegionIn Process

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Actions to Achieve 2006 Installation Goals Monitor P3 schedule against design and fabrication activities Monitor critical path to installation against device fabrication progress Analyze any schedule variance impact on installation Adjust assignments to recover from any schedule variance Complete Injector & Linac region designs Prioritize design activities based on downtime schedule dates Complete Gun fabrication and testing Receive & test vendor magnets Complete X-Band component fabrication Fabricate Insertion/SAB, L1, BC1 Articulation & BC1 Diagnostics Section Complete water system design and install Finish detailed installation plan, update P3 Complete commissioning plans, update P3

Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design Injector Design / Diagnostics / Gun & Linac RF Design Conclusion Progress is being made toward completing beamline and component design for 2006 installation supporting January 2007 commissioning but with some risk Priority of design activities must be placed on components to be installed in Linac Housing during 2006 downtime Injector Vault water system design and installation must be expedited