Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel and.

Slides:



Advertisements
Similar presentations
Establishing Performance Standards for PARCC Assessments Initial Discussion PARCC Governing Board Meeting April 3,
Advertisements

How electricity is made
MICE Magnetic Investigation of T2 MICE/ISIS Target Meeting 17 th September 2010 P J Smith – University of Sheffield.
MICE MICE Target Mechanism Paul Smith University of Sheffield 8 th June 2010 (Based upon talk given by Chris Booth at CM26)
MAIN ELECTRICAL SURVEY ITEMS, GENERATORS AND GOVERNORS,, CIRCUIT BREAKERS, SWITCHBOARDS AND FITTINGS (Adapted from:D.T. Hall:Practical Marine Electrical.
Target Paper Status Summary 21 st December 2010 Chris Booth 1.
Target Paper Status Summary 13 th December 2011 Chris Booth 1.
MICE Target Report Chris Booth (for target team) Sheffield 7 th May 2009.
Trip Report on the visit to ICST of HIT, Harbin, China Derun Li Mike Green Steve Virostek Mike Zisman Lawrence Berkeley National Laboratory (from December.
K. Long, 14 June, 2015  Target K. Long, Friday, 24 th April 2009.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Inspection of T2#2 documented in MICE Note 272 Some issue with Notes site … couldn’t.
Status of Electronics & Control System P J Smith University of Sheffield 16/12/2009.
Financial Upgrade 8.8 Update. Status Fit Gap Complete Fit Gap Complete Design in Progress Design in Progress Development in Progress Development in Progress.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
A Tale of Two Targets … 7 th September 2009 Chris Booth The University of Sheffield.
Target: K. Long, 21Dec2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel delivery.
Target: K. Long, 16Nov2009. Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Delay in material delivery: » Torlon delivery expected.
Target Assembly and Installation Update 20 th August 2009 Paul Hodgson The University of Sheffield.
MICE TARGET WORKSHOP – SHEFFIELD 2 nd December Target vibration and general design issues 2. Simple Vibration - causes and forces. 3. Not so simple.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
(FEA) Analysis P J Smith University of Sheffield 27 th November 2008.
MICE Target Report Video Conference 05/07/07 Chris Booth Sheffield 5 th July 2007.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
The Generator. Electricity Generator Energy: The ability to do work Two Examples: Mechanical Energy: Energy that comes from the motion of an object Electrical.
Target Report Introduction Chris Booth Sheffield 20 th November 2008.
NSW SG 19 Nov Nov 2014 S. Zimmermann, NSW SG 1.
1 MICE PM Report Completion of Infrastructure Target, solenoids Phase Two planning & schedule Non-MICE costs Staffing & visitors Don’t have time for a.
1 Progress On The Design And Manufacture Of The New Stator Geoff Barber Imperial College.
Welcome to Everybody. পরিচিতি দিলীপ কুমার পাল টেকনিক্যাল টিচার্স ট্রেনিং কলেজ ইইই বিভাগ.
Status of installed target Preparation of “demonstrator” target Chris Booth Sheffield 25 th January 2008.
Superconducting Corrector Magnet Progress Report P. Wanderer Superconducting Magnet Div; Dec. 15, 2007 T2K US B280 collaboration meeting.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
Unit 4 Day 7: Magnetic Fields due to Wires Magnetic Field in a Straight Wire Magnetic Fields in 2 Parallel Conducting Wires, Side by Side Magnetic Forces.
1 MICE PM report Target News Outcome of Spectrometer Solenoid Review New plans for Steps II & III RF Power news MICE CMPB, 4th December, 2009.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Motors and Generators.
Elec467 Power Machines & Transformers Electric Machines by Hubert, Chapter 12 Topic: Self-excited and compound generators, load distribution.
Capstone Design - Personal mobility - Group name : 올라가 조 박경원 정태산 이효진 강석우.
Last collaboration meeting B. Plaster nEDM February 2008 Collaboration Meeting Attention now focused on construction of a 1/2-scale prototype modified.
1 MICE PM report – status of Phase II Target update Spectrometer solenoid FC & coupling coils Schedule considerations Project accommodation & management.
How Does a Wind Turbine Work?
PASI OsC meeting 12th July 2012
Hi-Lumi Conductor Procurement A.Ballarino, B. Bordini, L. Oberli HL-LHC/LARP International Review of Superconducting Cable for the HL-LHC Inner Triplets.
Programme for “Target 3” – test of alternative bearing materials (from Jason Tarrant) –Drawing updates by 11 th November –Bearings: Material approval –
Target Status Report Chris Booth & Paul Hodgson Sheffield 18 th Sept ember2008.
Correctors for the J-PARC Proton Beam Line Peter Wanderer BNL Superconducting Magnet Div. September 8, 2007 T2K US B280 Collaboration Mtg.
Year 1 In-Service Cert Ed / PGCE/PGDipE Session 21 Individual Progress Review Independent Study.
Planning and Monitoring in Pursuit of Goals Preparation of the Body KC5.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
DC Motor For students of the second stage in the Department of Electrical Engineering Introduction by Salam Mohammed Atiyah Master of Electrical Engineering.
MICE Target – Status & Plans Chris Booth Sheffield 28 th February 2006.
Target Status 27 th August 2009 Chris Booth The University of Sheffield.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
BSS Prep work at CERN and Acceptance of Parts
Oversight Board Meeting October 3, 2017 Rob Michnoff
Overview of Project Management
Overall Project RAG Status:
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
QXF schedule and milestones
EUC Project Timelines Key Upcoming Dates:
Overall Project RAG Status:
Overall Project RAG Status:
Overall Project RAG Status:
Overview of Project Management
Globus-M2 will be constructed by the end of 2015
Presentation transcript:

Target: K. Long, 16Nov2009

Schedule for T2 re-instatement: T2#2: – Next steps: Non-DLC bearings: – Continuing delay in material delivery! » Vespel and Torlon delivery expected ~12 December In parallel: – Checking forces generated with mis-aligned coils using OPERA model (PS, TB): ongoing – Devising magnetic QA rig (GB + Shf): ongoing – Devising concept for winding coils that is more precise Schedule T3: – Machining of parts progressing well – Coils for T3 prepared in Sheffield: » Will consider whether to use new coils or present coils based on: magnetic analysis; Magnetic QA on T2 stator

T3 schedule: T3 schedule still looks OK: – Need to expedite ‘R&D’ work on T2#3 Which is in hand

Controls schedule: Stage 1 of controller upgrade still on track for early next year