1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis,

Slides:



Advertisements
Similar presentations
ALICE DCS, Heidelberg 8 Sept G. De Cataldo, CERN CH and INFN Bari;A. Franco INFN Bari 1 Updating on the HV control systems in ALICE The DELPHI HV,
Advertisements

JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
DCS workshop 13-14/6/2005G. De Cataldo, CERN-CH and INFN bari1 Common FSM’s updates An exercise to design the standard FSMs for the DCS, the HV and the.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
The ALICE TRD - HVDistribution System A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Normal text - click to edit RCU – DCS system in ALICE RCU design, prototyping and test results (TPC & PHOS) Johan Alme.
MDT PS DCS for ATLAS Eleni Mountricha
DCS workshop CERN, Mar 5, 2007 Kai Schweda 1 TRD Status Kai Schweda, University of Heidelberg B. Doenigus, J. de Cuveland, T. Dietel, D. Emschermann, M.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
D etector C ontrol S ystem ALICE DCS workshop G. De Cataldo CERN-CH, A. Franco INFN Bari, I 1 Finite State Machines (FSM) for the ALICE DCS:
TPC Prototype III TPC module anode HV edge LV module analog digital Cool sensor Gas sensor Shift Expert DCS Ch Skirt.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
André Augustinus 10 March 2003 DCS Workshop Detector Controls Layout Introduction.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
21/6/2004 Colmar, DCS Work. G. De Cataldo Cern-CH&INFN Ba,I; A. Franco INFN BA,I 1 The candidate STANDARD diagram for the HV FSM in ALICE TO WHAT AND WHY.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
I. Vankov, NEC’2003, September ‘03, Varna HV PS System NEC’2003, September 03, VARNA CMS HCAL High Voltage Power Supply System Dimitrov L.(*), Kunov B.(*),
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
1 LHCb CALO meeting Anatoli Konoplyannikov [ ITEP / LAPP ] Introduction Status bits of the LHCb readout supervisor ODIN HVSB board specification.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
XXVI workshop on resent developments in High Energy Physics and Cosmology Ancient Olympia,16-19 April 2008 Tsarouchas Charilaos NTUA Detector Control System.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Dcs meeting, CERN, Mar 13  14, HV Control box HV Box from Athens Kai Schweda, University of Heidelberg P. Mantzaridis, A. Markouizos, P. Mitseas,
CALO DCS upgrade A. Konoplyannikov, M. Soldatov, A. Ostankov, Yu. Guz (IHEP, Protvino) V. Kudryavtsev (BINP, Novosibirsk)
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
DCS for TRD Pre-trigger Ken Oyama Jan. 22, 2007 DCS Workshop in Heidelberg.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
CSC Detector Control System of Silicon Drift Detector in ALICE Jiří Král Czech Technical University.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
EE EDR Workshop CERN March 2002 R M Brown - RAL 1 The VPT HV System lOverview of the architecture lThe HV filter card lRadiation tolerance lPower supply.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Yu. Guz 14/03/20121 CALO HV ** See also Anatoli’s slides for the 2009 piquet training **
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
Outline Upgrade status of the ECAL/HCAL HV control mezzanine board;  Firmware design,  Setup for making functional tests and validation FPGA firmware.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
ATLAS MDT HV – LV Detector Control System (DCS)
The LHCb Run Control System
TPC Detector Control System
Presentation transcript:

1 Integration of the HV Distribution System to the First TRD Super Module P. Mantzaridis, A. Markouizos, P. Mitseas, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University Workshop on the DCS for the TRD Heidelberg, January 2007

2 Outline Installation of the first HVDS at CERN Specifications of the HVDS Control of the HVDS Performance of the HVDS Current Status (hardware, software)

3 Installation of the first HVDS at CERN (October 2006)

4 Installed Hardware at CERN 1+1 Crates ( positions: 007_9, 007_16 ) 1+1 DCS Boards ( with auxiliary DCS cards ) 1+1 Backplanes supplies the Master HV to each card distributes the isolated LV to the active components enables the CAN bus communication 5 Anode + 5 Drift Cards 3+3 isolated LV Auxiliary Power Supply Cards LV Power Supplies (5V, ±12V)

5 Specifications of the HVDS Anode Voltage - dynamical range900 – 1900 V - ramp-up rate30 V/s - ramp-down rate100 V/s - voltage stability  V < 50 mV - voltage readout10 Hz - max. current 7  A - response time < 50 ms (e.g. overcurrent)

6 Specs. (cont) Drift Voltage - dynamical range1450 – 2500 V - ramp-up rate30 V/s - ramp-down rate100 V/s - voltage stability  V < 50 mV - voltage readout 10 Hz - max. current230  A - response time < 50 ms (e.g. overcurrent)

7 Control of the HVDS

8 The TRD Overview Drawing

9 DCS Board 0 Crate 0 DCS Board 1 (Optional) Module 2 (Internal architecture similar to module 0) Crate 1 (Internal architecture similar to crate 0) Module 0 Card 0 Card 1 Card 2 Card 3 Card 4 Module 1 (Internal architecture similar to module 0) Architecture of the CAN network

10 HVDS Card Control Panel

11 ISEG Control Panel (G. Tsiledakis)

HVDS Channel Control Panel (Test on the SM 1 at CERN, 8/10/2006)

13 Ramping and Status Procedures

14 Error Messages Voltage Errors  Over Voltage  message: max allowed voltage is exceeded  action: voltage is set to the max allowed value  Under Voltage  message: min allowed voltage is out of range  action: voltage is set to the max allowed value  Limits Error  message: set value is out of limits  action: limit is set to the default value Current Errors (Hardware Error)  Over Current  alarm: max allowed current is exceeded or a short-circuit occurred Ramping Errors  Ramping Rate  message: max allowed rate is exceeded  action: rate is set to the max allowed value  Ramping End Value  message: end value is out of limits  Action: value is set to the max allowed  Limits Error  message: set value is out of limits  action: limit is set to the default value

15 HV State Diagram (G. De Cataldo)

16 Control of the HVDS Performance of the HVDS

17 Voltage Stability Test on the Detector at HD ( ) Voltage Measurements

18 Current Stability Test on the Detector at HD ( ) Operating 3 channels from one HV Anode Card Current Measurements

19 Voltage Stability Measurements on the SM1 at CERN (9/10/2006) 6 anode channels HV set at 1450 V

20 Voltage Resolution Measurement on the SM1 at CERN (9/10/2006) Anode ChannelHV set at 1450 V

21 Long Term Voltage Stability Test (Athens - Jan 2007) ΔV (FWHM) < 30 mV ΔV / V < 1.6 E-5

22 Control of the HVDS Current Status

23 Hardware New Schroff Crate + LV Power Supply Two parallel orders to Q-Print 2 Anode + 2 Drift cards for testing purposes 30 (+10) Anode + 30 (+10) Drift cards to power 6 Supermodules + 5 Backplanes, Auxiliary DCS cards, connector card, Isolated PS cards Define testing procedure Magnetic field tests of a full crate at CERN Installation of the 2+2 HV Crates at P2 Documentation

24 Archiving Amanda Server Manager (AliRoot) ORACLE Database Alarm Handling Recipes and logical views Integration to the TRD-DCS PVSS project according to the ALICE DCS guidelines Implementation of the FSM Installation of final software project at CERN Documentation Software

25 Thank you!