GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR-03213-01 Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
Advertisements

GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Feb , 2001 IOC – S.Williams SAS - R.Dubois 1 Instrument Operations Center (IOC) and Science.
GLAST LAT Project I&T Meeting – Jan 20,2004 E. do Couto e Silva 1 GLAST Large Area Telescope: EM1 Data Analysis and Calibration Summary Report Eduardo.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.31 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
SVAC/ISOCInstrument Analysis Meeting, April 14, 2006 Anders W. Borgland 1 The LAT In Every Which Way You Want It! Anders W. Borgland Science Verification,
GLAST LAT ProjectISOC Peer Review March 2, 2004 Document: LAT-PR Section 5 LAT Operations Facility 1 GLAST Large Area Telescope: Section 5: LAT.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
GLAST LAT Project Apr 1, 2005 E. do Couto e Silva 1/31 Overview of End to End Runs Eduardo do Couto e Silva April 1, 2005 ( not it is not a joke, we finally.
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectLAT Operations Planning, 23 March GLAST Large Area Telescope LAT Operations Planning 23 March 2005 Rob Cameron
GLAST LAT ProjectISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.1 Requirements 1 Gamma-ray Large Area Space Telescope GLAST Large.
GLAST LAT Project 1 Tracker “mini-tower” Full Size Calorimeter module Face to Face IDT meeting March 20, 2002 Convener: E. do Couto e Silva Engineering.
GLAST LAT ProjectOnline Peer Review – July 21, Integration and Test J. Panetta 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope:
GLAST LAT Project Instrument Analysis Workshop June 7, 2004 E. do Couto e Silva 1/19 Introduction to the Workshop Series Eduardo do Couto e Silva Instrument.
GLAST LAT Project July 19, 2005 E. do Couto e Silva 1/17 Science Verification Analysis and Calibration GLAST Large Area Telescope Eduardo do Couto e Silva.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
GLAST LAT Project Analysis Meeting March 22, 2004 E. do Couto e Silva 1/8 LAT Instrument Test Analysis Eduardo do Couto e Silva March 23, 2004.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Section Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review 7.2.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectTest Planning Meeting Aug 2, 2004 E. do Couto e Silva 1/6 SVAC EM2 Goals Develop distributions for E2E tests that involve comparison of.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT Project SE Test Planning meeting October 4, 2004 E. do Couto e Silva 1/13 SVAC Data Taking during LAT SLAC Oct 4, 2004 Eduardo.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
GLAST LAT Project28 March 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST Large Area Telescope - OperationsDOE Review, 15 June GLAST Large Area Telescope Operations Review Rob Cameron Instrument Science Operations.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT Project Analysis Meeting April 22, 2004 E. do Couto e Silva 1/5 SVAC Status SVAC Status Eduardo do Couto e Silva April 22, 2004.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
GLAST Large Area Telescope:
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 K.Young 1 LAT Data Processing Facility Automatically process Level 0 data.
GLAST LAT ProjectIntegration and Test CDR Peer Review, March 28, 2003 Document: LAT-PR Section 8 - Page 1 GLAST Large Area Telescope: I & T Peer.
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
1 Stepping in everyone’s toes ( but for a good cause….) Eduardo do Couto e Silva Software Meeting – January 2001.
Feb. 7, 2007First GLAST symposium1 Measuring the PSF and the energy resolution with the GLAST-LAT Calibration Unit Ph. Bruel on behalf of the beam test.
GLAST LAT ProjectMonthly Status Review - ISOC, 3 Nov GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Monthly Status Review.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project IA Workshop 4 July 14, 2005 E. do Couto e Silva 1/7 Introduction to the Instrument Analysis Workshop 4 Eduardo do Couto e Silva July.
GLAST LAT ProjectSAS PDR, Aug. 17, 2001 R.Dubois1 Schedule Balloon Science Tools, Analysis Platforms Calibrations Performance Tuning, Tracking Data Production.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
GLAST LAT ProjectFace to Face, 14 April 2004 LAT System Engineering 1 GLAST Large Area Telescope: EGSE and Interface Verification Pat Hascall SLAC System.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT ProjectSLAC Internal Review, April 16-18, 2002 LAT-PR Electronics and Flight Software WBS GLAST Large Area Telescope: Electronics,
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
GLAST LAT Project SE Test Planning Dec 7, 2004 E. do Couto e Silva 1/27 Trigger and SVAC Tests During LAT integration Su Dong, Eduardo do Couto e Silva.
GLAST Large Area Telescope Instrument Science Operations Center
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
GLAST Large Area Telescope Instrument Science Operations Center
Mini Tower Preliminary Results
GLAST Large Area Telescope:
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review Section 7.1 Pre Launch Operations and Calibrations Eduardo do Couto e Silva Manager of the Science Verification Analysis and Calibration Department of I&T Subsystem

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 2 Outline Connection between I&T/SVAC and ISOC/SOG I&T/SVAC Requirements Examples of I&T/SVAC activities –Lessons Learned from I&T/SVAC –Examples of preliminary data analysis Summary

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 3 Connection between SVAC/I&T and SOG/ISOC The Science Verification Analysis and Calibration (SVAC) Department of the I&T subsystem will gradually transition into the Science Operations Group of the ISOC. The main responsibilities of the SVAC Department are Coordinate Data Analysis for Science Verification Perform final pre launch calibrations Perform first in-flight calibrations prior to hand off to ISOC/SOG (see talk in section 7.2) Deliver calibration products to ISOC/SOG

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 4 I&T Pre Launch Experience with EM The Science Operations Group (SOG) has been recently created and does not yet have all of its documentation in place In this talk we will present an overview of the I&T/SVAC experience using the Engineering Model (EM) test as an example of the activities that will be performed by the SOG during mission operations The lessons learned on following items will be discussed –Documentation –Data Processing –Operations –Calibrations –Data Analysis

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 5 LAT Performance Specifications Science Verification, Analysis and Calibration (SVAC) Plan CalibrationData AnalysisScience Verification GLAST LAT SVAC Plan LAT-MD LAT-SS Science Requirement Document 443-SRD ACD, CAL, TKR Specifications LAT-SS-00016, LAT-SS LAT-SS-00018, LAT-SS-00152, LAT-SS Level II Levels III and IV Level III Science and Calibration requirements from Subsystems Plans were captured in LAT-MD-00446

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 6 SVAC Plans and Technical Documents SVAC Plans and Technical Documents Engineering Model EM LAT LAT-MD LAT-TD LAT-TD LAT-TD LAT-TD LAT-MD LAT-MD LAT-MD Hardware Test Plan/Results Calibrations Simulations Databases Interfaces LAT-MD LAT-TD SAS responsibility LAT-TD LAT-TD LAT-MD-00446LAT-MD-01587LAT-MD Co-owned with Systems Engineering Co-owned with Project Scientist LEVEL III LEVEL IV LAT-TD LAT-TD LAT-TD Co owned with Instrument Operations Center Contributed Manpower Plan Existing docs are shown in red boldface At this time we are reviewing the EM documents and lessons learned to produce the necessary documentation for the LAT Integration

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 7 Level III Documents - Contents LAT-MD SVAC Plan –Instrument Calibrations –SVAC Compliance –Pre Launch Test Matrix –Post Launch Test Matrix LAT-MD – SVAC Test Requirements Plan –Hardware Required –Flight Software Required –Test Configuration –EGSE Required –MGSE Required –Test Software –Support Instrumentation –Test Data Record –Data Format –Test Products –Analysis Activities –Environmental Conditions –Test performance Procedures –Facility Requirements –Quality Program Performance Requirements –System Assurance Requirements –Test Equipment Calibration Co owned with Systems EngineeringCo owned with Project Scientist LAT-MD SVAC Plan –Engineering Model TKR,CAL,SAS –Calibration Unit ACD,TKR,CAL,SAS,IOC –LAT ACD,TKR,CAL,SAS,IOC Contributed Manpower Plan

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 8 Level IV Technical Documents – Contents Test Plan/Results –LAT-MD – SVAC EM Plan Describes the hardware data taking configurations, infrastructure needed for calibrations, calibration types, data analysis requirements. Run time estimation using MC simulation –LAT-MD – SVAC Results from the Engineering Model Test Describes the results and how requirements were met Calibrations – LAT-TD – Calibration Algorithms for the Engineering Model Describes the calibration algorithms developed in conjunction with SAS and subsystems Simulations – LAT-TD – EM Geometry for the Monte Carlo Simulation Describes the geometry used in the simulation, includes table to translate nomenclature from software developers to engineers and also contains traceability Database – LAT-TD – SVAC Database for the Engineering Model Describes the table schema and how a web based engine will allow access to a subset of calibration data for the purpose of tracking changes in time. Interfaces –LAT-TD – SVAC/SAS Interface Control Document Describes the responsibilities between SAS and SVAC for data analysis (Statement of work) –LAT-TD – SAS Calibration Infrastructure Describes SAS calibration infrastructure that holds the primary calibration data Using Engineering Model as an example

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 9 Documentation – Lessons Learned EM Lessons Learned –Lots of documents and not enough time for people to read them (i.e., less than optimal feedback from subsystems) –In some cases ideas were discussed in details but were not mature enough to be implemented (e.g. EM database) –Difficult to keep up with update needs given the manpower limitations within I&T For SOG –Documentation shall be kept at a level that is adequate to guide planning while allowing for technical reviews –Interfaces need more attention and shall be more detail oriented

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 10 Data Analysis Chain ROOT tree Files (digi) SAS/ONLINE Converter ROOT tree Files (recon) SAS Recon “GENERAL” USER Online Analysis tools online scripts Calibration Constants Calibration scripts ROOT ntuple files IDL Structures SAS Converter SAS User Interface EBF EM In the future the FSW Filter will go in here

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 11 Data Processing – Lessons Learned EM Lessons Learned –Data transfer was tedious and was partially automated –Reprocessing of data occurred more often than expected –The Information about datasets necessary for data analysis was not available through a user friendly interface (despite our planning!) For SOG –Fix communication problems between interfaces and devise system tests to minimize needs to reprocess data –Investigate with SAS how to automate Data Processing –Create better requirements to implement database queries

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 12 Calibrations – Lessons Learned EM Lessons Learned –In some cases procedures were developed on the fly (not a serious impact since we did not have to deal with many software versions) –I&T was not directly involved in all calibrations For SOG –Implement better configuration control of data and procedures to produce data –Develop sufficient expertise within SOG to handle all possible calibrations –Understand better requirements for interfaces with FSW

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 13 Operations – Lessons Learned EM Lessons Learned –In some cases it was difficult to determine the data taking configuration –Not all information was available during data taking –New configurations were added during the data taking period without adequate planning For SOG –Implement better user guides and operator training –Develop a process to critically review operational procedures and to address unscheduled configuration changes –Understand interface with FSW

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 14 EM Ground Calibration Set-up CALTKR Gammas:66% 17.6 MeV 34% 14.6 MeV, FWHM = 1.5 MeV + lots of electrons Cosmic Background Electrons are produced by gamma conversions in the iron shield in front of the accelerator Beam pipe Not a monochromatic beam!

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 15 CAL Energy Spectrum CAL Energy Spectrum Photon Source OFF Photon Source ON Energy (MeV) Mostly photons From Gary Godfrey Preliminary

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 16 Source Calibration From Gary Godfrey Expect two energy lines Preliminary

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 17 Flux Measurement Top TKR face Extrapolation to Photon Source EM Rec Direction cosine In 0.02 bins 10% error is dominated by the knowledge on the BGO position 9% of the of photons produced by the source are measured by the EM From Gary Godfrey Preliminary

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 18 Energy Measurement ROOT tree Files (digi) Raw spectrum of individual crystals Calibration Constants Perform Calibrations C14,C15,C16,C18 on each crystal Operational Settings Perform C18,C19,C20,C22,C23,C24 to establish baseline for data taking ROOT tree Files (recon) Produce Energy Calibrated Spectrum using all crystals ROOT ntuple files Use Data Analysis Cuts and VDG Flux Calibration to obtain final spectrum Data Analysis Calibrations IDs are described in LAT-MD-00446

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 19 EM Energy Spectrum (VDG DATA) Event selection: nTkrTracks>=1 && zDir 4MeV Expected  Spectrum Delta function (17.6 MeV) Breit-Wigner (mean 14.5, width=1.5MeV ) Energy (MeV) From Xin Chen Preliminary

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 20 Energy Spectrum (VDG MC) Events converted in top layer of Tracker only From Xin Chen Event selection: nTkrTracks>=1 && zDir 4MeV Expected  Spectrum Delta function (17.6 MeV) Breit-Wigner (mean 14.5, width=1.5MeV ) Energy (MeV) Preliminary

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 21 Data Analysis – Lessons Learned EM Lessons Learned –Expected experimental backgrounds were not thoroughly studied prior to the test –Some algorithms and pieces of the offline software were not validated prior to the data taking period –Calibrations took longer than expected For SOG –Develop with SAS, I&T and LAT Collaboration tools for instrument and sky simulations to address needs of first- year operations –Develop better communications across interfaces and sharpen calibration requirements

GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 7.1 Pre-launch Operation and Calibration 22 Summary Lessons Learned –The I&T/SVAC group will revisit all EM technical issues to ensure a successful LAT integration. I&T/SVAC will participate in the planning process to build the infrastructure required for the SOG during the I&T integration Concerns –More discussions and planning are needed to address how the operational procedures and calibrations exercised during Integration will be adapted to the Flight Software environment (not present during EM)