Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.

Slides:



Advertisements
Similar presentations
The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
DOE/NSF Review of ATLAS, 1 Mar 2000, BNL Muon MDT Front End Electronics (WBS 1.5.9) James Shank DOE/NSF Review of U.S. ATLAS Detector (with help from:
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
Feb 26, 2004 Mike Hildreth – DØ Collaboration Meeting Run IIb Trigger Simulation Report Mike Hildreth & Ela Barberis for the Run IIb Trigger Simulation.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
AFE II Status. Analog Front-End (AFE) Board  Approximately 200 AFE boards are needed to readout CFT (&CPS/FPS) u 512 channel (2/cassette) u Analog output.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
WBS 1.7: AFE II Project Cost and Schedule Alan Bross DZero Run IIb AFE II Director’s Review April 13, 2005.
October 28-th, 2005Straw tracker 1 Status of Straw Tracker for P236 P.L. Frabetti, V.Kekelidze, K.Kleinknecht, V.Peshekhonov, B.Peyaud, Yu.Potrebenikov,
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
MICE Tracker Readout Status VLPC – Cryo – Front End Electronics A.Bross Berkeley, February 2005.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
SPSC Questions to the 2014 NA62 Status Report 1 Beam: which is the beam structure expected in October? Which is the intensity you can reasonably expect?
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Status of the Beam Phase and Intensity Monitor for LHCb Richard Jacobsson Zbigniew Guzik Federico Alessio TFC Team: Motivation Aims Overview of the board.
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Example NAMEROLE Ron LilleyProject Manager ???Project Inspector ????County Planner ????Zoning Inspector HBACivil Engineer ????Architect ????Mechanical.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.
MTest Pixel Telescope – Status Update David Christian September 11, 2007.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
12/7/2015 Paul Rubinov PRR Mar Production Readiness Review  Welcome!  Our motto: When you earnestly believe you can compensate for lack of talent.
MICE Phase 1 Koji Yoshimura KEK June
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
1 October 2003Paul Dauncey1 Mechanics components will be complete by end of year To assemble ECAL, they need the VFE boards VFE boards require VFE chips.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
AFE Meeting June 5, 2001 SIFT UPGRADE Marvin Johnson.
ASIC Activities for the PANDA GSI Peter Wieczorek.
WBS 1.2.8: AFE II Status and Plans Alan Bross for the DZero Central Fiber Tracker Group DZero Run IIb Detector Upgrade Director’s Review July 15, 2004.
1 FVTX Monthly/Quarterly Report January 2009 Cost Summary Schedule Summary Current technical status of each WBS item.
D. Lincoln Run II MTG May 12, Y2K What will it take to get data out of the CFT?* Don Lincoln CFT Commissioning Czar Fermilab Run II Meeting May 12, Y2K.
09/10/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
January 17, MICE Tracker Firmware Dead Time and Muon Detection Studies for the MICE Tracker Tracker Data Readout Basics Progress in Increasing Fraction.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
D0 PMG 2/3/00 PMG Agenda Feb 3, 2000  Overview u Project Manager’s Report – Tuts u Fallback options – Weerts  Silicon Support Cylinder Modifications.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
13Apr05 Directors Review Apr ’05 Status of the AFEII(-t) AFEII proto testing AFEII (-t or final) design Paul Rubinov and Stefano Rapisarda.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
VMM Update Front End ASIC for the ATLAS Muon Upgrade V. Polychronakos BNL RD51 - V. Polychronakos, BNL10/15/131.
Jan. 25, 2011 Status of the Aerogel RICH Readout Trig/DAQ Meeting in Beijing 1 S. Nishida (KEK) S. Nishida Status of the Aerogel RICH Readout Belle II.
S. Smith LCLS Facility Advisory October 12, Beam Position Monitors Facility Advisory Committee October 12, 2006.
Status report 2011/7/28 Atsushi Nukariya. Progress Progresses are as follows. 1. FPGA -> Analyze data from FPGA, and some revise point is found. 2. Software.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
KRB proposal (Read Board of Kyiv group)
AFE II Status First board under test!!.
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
Muon Recording Studies and Progress for the MICE Tracker
DEVELOPMENT OF A TOF-PET PROSTATE PROBE READOUT SYSTEM
FEE Electronics progress
Presentation transcript:

Paul Rubinov TriP-t & AFEII status

AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for L3 and offline 8 photons 80 fC Central Fiber Tracker cylinder

Overview Ancient history STOP build/test TriP for 132ns running TriP works very well at 396ns and adding time info can help CFT a lot. Build TriP-T Build AFEII prototype Summer 04 milestone Aug 04 Build AFEII (with time Info) by end of 2005 AFE1 problems

AFEII proto current status Schematic design is 99% complete. …an internal review has been completed. The review committee made a number of suggestions (minor) and these are being implemented. Layout of the board is about 80% complete… However, this is going very slowly. Still 3 weeks work left. This puts the work about 3-6 weeks behind schedule. Has impact on D0. Test of AFE II prototypes with beam this August is now NOT likely. Specifications for the new microcontroller code requirements are 75% complete… Design of the FPGA is 75% complete…

TriP  The existing TriP ASIC (7000 die on hand)  Lots of testing over about 18 months- described in Fermi TM 2226, 2227 and 2228

TriP-t: the new idea  About 1% additional components:  7bits t-info offline: 120ns full scale=> 2ns time => ~35cm resolution in Z

TriP-t current status  The chip designers are chip designing.  End date is given as Aug ’04  The new chip is the “critical path” item for the project u Assuming D0 makes decision to use Tript  Some prep work going on now u We will need new packaging u We had some concerns about features used on the new chip, but where not used on the old (current!) TriP chip.

TriP-t prep work  Bench testing  New package