Paranal 60th STC meeting. 2 What does the VLTI infrastructure do? Put the light in the one place at the one time. –Inject the image plane in the.

Slides:



Advertisements
Similar presentations
The Very Large Telescope Interferometer EuroSummer School Astrometry and Imaging with the Very Large Telescope Interferometer Keszthely, Hungary June.
Advertisements

CMSC 2006 Orlando Active Alignment System for the LSST William J. Gressler LSST Project National Optical Astronomy Observatory (NOAO) Scott Sandwith New.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Optics in Astronomy - Interferometry - Oskar von der Lühe Kiepenheuer-Institut für Sonnenphysik Freiburg, Germany.
Preparing MIDI for science operations on Paranal Markus Schöller Jean-Gabriel Cuby, Sebastien Morel, Andrea Richichi Schloss Ringberg, September 03, 2003.
Error budget for the PRIMA conceptual design review Bob Tubbs, Richard Mathar, Murakawa Koji, Rudolf Le Poole, Jeff Meisner and Eric Bakker Leiden University.
VIRGO: WHERE WE COME FROM WHERE WE ARE GOING GIOVANNI LOSURDO - INFN Firenze Advanced Virgo Project Leader for the Virgo Collaboration (and the LIGO Scientific.
Topic 11.3 Diffraction.
S.H.H.S Building Construction
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
1 Virgo Commissioning progress and plans ILIAS, Jan 23 rd 2007 Matteo Barsuglia on behalf of the Commissioning Team.
Designing High Power Single Frequency Fiber Lasers Dmitriy Churin Course OPTI
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
ASTRI SST-2M The Prototype monolithic 1.8 m
I. The Problem Telescopes on small, light, orbiting observatories are susceptible to pointing errors caused by reaction wheel rumble. The Jupiter Magnetosphere.
Unit 1 Physics Detailed Study 3.1 Chapter 10: Astronomy.
Cophasing activities at Onera
Blue Dot Team « Multi aperture imaging ». BDT sept MAI techniques High accuracy visibility measurement Differential interferometry Nulling.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
J. Large Binocular Telescope (LBT) Operational Readiness
LIGO-G W Status of LIGO Installation and Commissioning Frederick J. Raab, LIGO Hanford Observatory.
ANATAC Meeting Line Length Correction Status 2004-Apr-23.
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) Institut für Atom- und Molekülphysik Detector Characterization of GEO 600 during.
Joshua Smith December 2003 Detector Characterization of Dual-Recycled GEO600 Joshua Smith for the GEO600 team.
Interferometer Control Matt Evans …talk mostly taken from…
IPBSM status and plan ATF project meeting M.Oroku.
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
EAGLE Active Optics Components E.Hugot - M.Ferrari Target Acquisition Workshop Paris 11/07/2007.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
BROOKHAVEN SCIENCE ASSOCIATES BIW ’ 06 Lepton Beam Emittance Instrumentation Igor Pinayev National Synchrotron Light Source BNL, Upton, NY.
Low order modes sensing for LGS MCAO with a single NGS S. Esposito, P. M. Gori, G. Brusa Osservatorio Astrofisico di Arcetri Italy Conf. AO4ELT June.
Tomographic reconstruction of stellar wavefronts from multiple laser guide stars C. Baranec, M. Lloyd-Hart, N. M. Milton T. Stalcup, M. Snyder, & R. Angel.
AO review meeting, Florence, November FLAO operating Modes Presented by: S. Esposito Osservatorio Astrofisico di Arcetri / INAF.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
An Approach to Stabilizing Large Telescopes for Stellar Interferometry It shakes like a…. [G. Vasisht, 31 March 2006] N. Di Lieto J. Sahlmann, G. Vasisht,
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
The AMBER & MIDI instruments of the VLTI (Observationnal Astronomy II) Lecture by Stéphane Sacuto.
LIGO-G0200XX-00-M LIGO Scientific Collaboration1 First Results from the Mesa Beam Profile Cavity Prototype Marco Tarallo 26 July 2005 Caltech – LIGO Laboratory.
December 3-4, 2003 Green Bank GBT PTCS In Progress Review Future Development Program Kim Constantikes, Richard Prestage.
March 31, 2000SPIE CONFERENCE 4007, MUNICH1 Principles, Performance and Limitations of Multi-conjugate Adaptive Optics F.Rigaut 1, B.Ellerbroek 1 and R.Flicker.
Na Laser Guide Stars for CELT CfAO Workshop on Laser Guide Stars 99/12/07 Rich Dekany.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Pre-focal wave front correction and field stabilization for the E-ELT
Beam Instrumentation in Monolith Stephen Molloy PBI Taskforce Leader.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Adaptive Optics in the VLT and ELT era Optics for AO
Charts for TPF-C workshop SNR for Nulling Coronagraph and Post Coron WFS M. Shao 9/28/06.
More about Light “Let there be Light”—Gen.1:3 SPH4U – Grade 12 Physics Unit 2.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
24 September 2001ATNF Imaging Workshop1 The Sydney University Stellar Interferometer (SUSI) John Davis School of Physics University of Sydney 24 September.
Theme 2 AO for Extremely Large Telescopes Center for Adaptive Optics.
Observations with AMBER  General overview  P2VM  OB preparation with P2PP P2PP / OB / templates Available templates for observation procedure Typical.
Joshua Smith August Identifying and eliminating limiting noise sources of GEO600 LSC Meeting, Hanford WA, August `04 Joshua Smith for the GEO team.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
STAR SVT Self Alignment V. Perevoztchikov Brookhaven National Laboratory,USA.
The Very Large Telescope Interferometer Neon School, Garching 29 August, 2008 Andrea Richichi European Southern Observatory.
January 6, 2005 URSI Nation Radio Science Meeting, Boulder, CO. Pointing and Focusing the GBT K. T. Constantikes NRAO Green Bank.
다양한 창문을 통한 우주 내용 왜 다양한 창문 ? 왜 다양한 창문 ? 대기의 영향 대기의 영향 망원경의 성능 망원경의 성능 관측에서 얻는 정보 관측에서 얻는 정보 중요 망원경들 중요 망원경들 차세대 망원경들 차세대 망원경들.
David Woody Caltech Owens Valley Radio Observatory
Lecture 14 AO System Optimization
Visit for more Learning Resources
Status of LIGO Installation and Commissioning
Thermal lensing effect: Experimental measurements - Simulation with DarkF & Finesse J. Marque (Measurements analysis: M. Punturo; DarkF simulation: M.
Observational Astronomy
Leveling By : Parveen Kumar.
Optics Measurements in the PSB
Presentation transcript:

Paranal 60th STC meeting

2 What does the VLTI infrastructure do? Put the light in the one place at the one time. –Inject the image plane in the lab –OPD variations should only be atmospheric –Make the pupils coincide All of this has to more-or-less function to make fringe tracking work. Not all of this needs to be at peak capability to get science on bright sources since the photons from 8-m telescopes approximate an infinite number in those cases.

3 How does VLTI do it? Each UT has a MACAO system that concentrates the bulk of the photons within the Airy ring. The beam is propagated via the relay optics to the delay lines The delay lines correct in ‘open loop’ geometric OPD (telescope and star locations) The VCMs on the delay lines move the pupil in the ‘axial’ direction. IRIS corrects for drifts in the conjugation between the MACAO reference and the lab reference FINITO corrects for atmospheric OPD variations through the delay lines

4 Where are we now? 6 delay lines installed (4 operational), VINCI, FINITO, IRIS, ARAL, MIDI and AMBER installed and able to execute scientific programs at the bright end. 2 ATs operational with tip-tilt correction. 30 docking stations installed and aligned, 6 docking stations used with siderostats or ATs. 4 UTs operational with AO correction. 35 refereed publications including 2 Nature papers.

5 Process. Following the review in December 04, the organization chose to pass the VLTI infrastructure ‘as is’ to Paranal. This acceptance by Paranal of the system was along the lines of every other delivery to the site from the UTs to the instruments (the review issues become punch list items) By taking the VLTI infrastructure over the lines of responsibility were clarified. What we did was to establish a team that would be given a simple task. Answer the Big Finito Question (BFQ).

6 Difficult areas Beam injection. We have frequent flux dropouts. Weather in the tunnel? Spasms in the delay lines? Spasms of polarization? …. OPD variations have significant non atmospheric components. Where do they come from, where do they go… Delay line alignment is insufficiently robust to allow the operation of the VCMs that control the pupil.

7 FINITO tiger team report (June 2005) The primary limitation to fringe tracking using the UTs is OPD vibrations in the telescope and beam transport; with the ATs it is flux drop-outs due to poor coupling onto the FINITO fibers. Although it needs improvements, fringe tracking with FINITO essentially has the potential to deliver stable fringes to instruments slaved to it. In our review of the existing documentation, we conclude that known vibrations dominate the OPD fluctuations and constitute the primary limitation to fringe tracking at VLTI. In addition to mitigation of the vibrations, we believe a global approach is needed to identify and monitor the interferometer vibration sources. Beyond the primary limitations, secondary limitations exist and are identified; these include: –Tilt and Strehl induced intensity fluctuations ・ – Phase unwrapping errors in FINITO. Essential improvements: – Vibration mitigation, particularly in the 20 to 150 Hz frequency range. –Tunnel seeing mitigation to allow stable coupling and improving the bandwidth of the proposed tip-tilt control system to 1 Hz or higher. –Increase the priority of commissioning the variable curvature mirrors. Key additional recommendations: –Improve FINITO behavior at stroke transitions. –Make central fringe identification robust. –Improve the large-signal servo bandwidth of the delay line control. –Investigate the nature of coupling fluctuations on ATs/UTs using IRIS.

8 Beam injection Beacon from Nasmyth A to IRIS

9 Beam injection Star to IRIS

10 Injection drop outs? MACAO suffers from ‘saturation’ events. The mirror does not have enough voltage to correct the request and the loop opens. The cause is fairly well understood and is a result of cross talk between aberrations which results in high order modes carrying small amounts of tip-tilt. The original ‘fix’ that permits operation was to manipulate the interaction matrix to reduce the voltage requests. This reduces the duration of the open loop events but does not make them go away. Good for an AO system bad for injecting to a fringe tracker. Current state of affairs: problem understood and present in the simulations. Fix tested in simulation (saturation management rather than fixing the IM). First test deployment possibly next week.

11 OPD variations The telescopes have been designed taking great care to minimize vibrations. They were also tested during commissioning (one of the many certifications) to comply with the requirements. Changes were made on M4 and the M3 tower following those tests and improvements made to the cooling pumps. Another campaign to improve the pumps on UT1 is planned. The other UTs appear quiet(ish).

12 MACAO cabinet fans an ongoing battle

13 Hang’em low Acoustic propagation?

14 Cooling pumps of the telescope 96 Hz: –Passive damper (December) –Replace alt. platform cooling hoses (December)

15 Non-atmospheric OPD Current state: OPD variations are still higher than specified. BFQ critical until the planned improvements. Long term solution is probably active tracking of vibrations either with accelerometers ala Keck or with lasers going off M4 and back to the tunnel. Strategy: Wait, measure and think.

16 Delay lines and VCMs Delay lines is a simplification for a complex system. Rails, carriages, metrology altogether get called delay lines. From the review: to maintain the alignment of the delay lines required much expert (or even better than expert) manpower and even then is unpredictable. Importance: Without aligned delay lines we cannot inflate the VCMs which in turn implies negligible field in the ATs (also a cause for flux drop outs) and also poor pupil location (in piston) for MIDI and AMBER.

17 Delay lines… We took DL5 and 6 out of ‘operation’ and experimented on them. The other 4 continue in operations

18 VCMs Without the VCMs functioning the field of view of the ATs is limited to an arcsecond or so (approx the diffraction limit of a 1.8- m telescope at 10 microns). J moon in IRIS Fwhm = 7.6 arcsec AT2 pupil on ARAL through DL6

19 Delay Lines : DELIRIUM -two 2D capacitive sensors (+water pots for earth horizon referencing) -One inclinometer for roll measurement -Metrology (laser or coarse) -Complete (6 DOF) trajectory reconstruction DELIRIUM raw data (DL5). Diff between 2 scans with wire sags of resp. 9 and 6 mm DELIRIUM linearity Weird, but goes away with laser metrology (TBC)

20 DL rail shape control Closed loop control based on global reconstruction –Influence function measurements (on one support) –Construction of IM / CM (assuming same response on all supports) –Scan results multiplied by CM to produce correction sequence (control gain = 1) –Corrections clipped to 10% of max error (or 5 microns ~ limiting accuracy) Noise : replace by 0s

21 Residual errors DL5, Aug 22nd, 22: x wheel frequency (210cm): not understood wheel frequency: wobble PSDs ? Pupil position (ARAL) vs. OPL

22 DL rail drift DL6 was aligned in Dec 2004 (summer time) DL6, June 10th, before alignment DL6, June 17th, after alignment DL6, Aug 2nd, after 6 wks and T drop of 2degC in tunnel DL5, Aug 5th, before alignment Concrete junctions Missing coils

23 Iquique Earthquake Blue: DL6 at 08:38 UT Red: DL6 at 23:23 UT June 13th, 22:44 UT (during rail alignment campaign) Richter 7.9 Distance 500 km north (i.e. wf // to rail) The rail did not deform at all

24 So where are we? Delay line alignment may be close to being solved for the not- so-far ends of the carriage travel. We have tested and now are deploying. Surprises may come but we like where we are. Hysterisis of the carriage is under study. Activation of the VCM mount (in the original plan for the recovery and suspended during the investigations) may still be required to overcome the wobble at the far end of the delay lines. Vibrations are being addressed but slower than we would like. However, no show stopper as yet identified for H and K. J is a bit harder. We think we understand the flux drop outs both for ATs and UTs. For UTs the solution may be at hand, for ATs it may require low order AO. We need to walk first… this may come sooner or later.