1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status August 1, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.

Slides:



Advertisements
Similar presentations
GLAST LAT Project Calibration and Analysis Meeting, 28 Nov 2005 E. Grove et al. 1 Proposed Flight Trigger Configuration: Engines and Scheduler Table J.
Advertisements

GLAST LAT ProjectManager’s Face to Face - ISOC, 17 March GLAST Large Area Telescope WBS 4.1.B Instrument Science Operations Center Manager’s Face.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status June 6, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status October 29, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray.
GLAST LAT Project June 6, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status May 2, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 6 of 12 LAT Test Results 1 GLAST Large Area Telescope Pre-Environmental Test.
GLAST LAT ProjectGLAST Flight Software IDT, October 16, 2001 JJRussell1 October 16, 2001 What’s Covered Activity –Monitoring FSW defines this as activity.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
Event Context Information: Particle Data Run Information Platform, Run ID, TimeStamp Configuration Information Hardware and software configuration keys.
Section 15-1GLAST Ground System Design Review August 18&19, 2004 ISOC Organization ISOC Manager R Cameron Commanding, H&S Timeline Planning Command Generation.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 3 LOF Operations Concept 1 Gamma-ray Large Area Space Telescope GLAST.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 4.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT Project Oct 5, GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems Engineering.
GLAST Large Area Telescope Engineering Meeting 23 November 2004 Charge Injection Calibration James Swain Stanford Linear Accelerator Center
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST Large Area Telescope ISIS Post Acceptance Test Review 28 January 2005 ISIS Completion Status Jana Thayer Stanford Linear Accelerator Center
GLAST LAT Project May 2, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
CRASH AND BURN ARIANE 5 Kristen Hieronymus SYSM6309 Advanced Requirements Engineering
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Current Status Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 LAT Housekeeping Sergio Maldonado Stanford Linear Accelerator.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Diagnostics Framework James Swain Stanford Linear Accelerator.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Software Watchdog Steve Mazzoni Stanford Linear Accelerator.
GLAST LAT ProjectT&C Database Management, 1 July GLAST Large Area Telescope T&C Database Management 1 July 2005 Bryson Lee
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 5 Report Tuesday 29 th July 2008 Jack Hickish.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Systems Engineering Mike DeKlotz GSFC Stanford Linear Accelerator Center Gamma-ray Large.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Suites (Backup) Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration James Swain Stanford Linear.
GLAST LAT Project CU Beam Test Workshop 3/20/2006 C. Sgro’, L. Baldini, J. Bregeon1 Glast LAT Calibration Unit Beam Test Status Report on Online Monitor.
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.21 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR Section 5 IOC Subsystem 1 GLAST Large Area Telescope: IOC Subsystems WBS: 4.1.B.
GLAST Large Area Telescope – ISOC Overview and StatusDOE Annual Review, 13 June GLAST Large Area Telescope Instrument Science Operations Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR FSW Overview Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 4 of 12 Flight Software 1 GLAST Large Area Telescope LAT Pre-Shipment Review Flight.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Test Environment Sergio Maldonado FSW Test Team Lead Stanford Linear Accelerator Center.
GLAST Large Area Telescope LAT Flight Software System Checkout TRR Software Quality Assurance Kelly Burlingham SQE Stanford Linear Accelerator Center Gamma-ray.
GLAST Large Area Telescope Instrument Flight Software Flight Unit Design Review 16 September 2004 Instrument Configuration by File James Swain Stanford.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test Two Tower Integration Readiness Review SVAC Elliott.
I&T&C Organization Chart
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope
LAT Test Results GLAST Large Area Telescope LAT Pre-Shipment Review
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
LAT Operations Scenario Subsystem Meetings
GLAST Large Area Telescope
GLAST Large Area Telescope
GLAST Large Area Telescope
Overview Cost to Complete
GLAST Large Area Telescope
Integration & Test Instrument Operations Coordination
GLAST Large Area Telescope Instrument Science Operations Center
GLAST Large Area Telescope:
Presentation transcript:

1 GLAST Large Area Telescope Monthly Mission Review LAT Flight Software Status August 1, 2007 Jana Thayer Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

2 FSW Status No reboots –610 reboot-free hours since fix was installed (B0-9-0) B1-0-1 on the LAT is still working beautifully – no major issues –190 hours with B1-0-1 Problem during LAT ACD power up traced to PPS –(see Pat’s presentation) Testing of GRB algorithm continues with new Monte Carlo B1-0-2 will be released on 8/17/07

3 GRB testing Received new MC sample from Richard Dubois in mid-July –Uncovered a bug in the list of gammas passed to localization algorithm Learned that performance of the algorithm could be greatly improved –Performance improvements in CPU usage (FSW-966) were achieved through modifications in the structure of ― the code that updates the clusters the code that scans the clusters looking for clusters over threshold Performance varies greatly with cluster size and input rate: –Cluster sizes: 80 photons, 200 photons, 500 photons –Input rates: 200 Hz, 400 Hz Caveat lector: –Non-linear effects could push these numbers up or down –These measurements are derived from basic time measurements, not measurements of CPU usage (as reported by housekeeping) Estimated time to do the cluster update for maximum cluster size = 80: OldNew 200 Hz10.2%1.75% 400 Hz20.4%3.5%

4 Scheduled FSW builds B1-0-2: –Build date: 8/15/07 –Testing: 8/15 – 8/17 –Release date (available for upload to LAT): 8/17 –Build contents: FSW-305, FSW-806, FSW-934 (leftover from B1-0-1) FSW-966, FSW-952, FSW-954, FSW-953 (newly approved) B2-0-0: First post-launch build –Phase in B2-0-0 JIRAs in small incremental builds prior to launch: B1-0-3 (FSW internal, tentatively 10/07) –LCI updates B1-0-4 (FSW internal, tentatively 12/07) –LATC updates B2-0-0 (tentatively, 1/07) –Remainder of JIRAs Of course, if the opportunity presents itself, FSW is more than happy to upload any “FSW internal” build to the LAT.

5 B1-0-2 Changes to onboard flight software: FSW-305 Summary/statistics telemetry stream needs to be created for on-board event processorsLPA FSW-934* Add telemetry to report on LAT power state and state/configuration of physics data acquisition FSW-918, FSW-954 In command confirmations, the "signalled" bit should always be suppressedITC FSW-953 Incorrect designation of some GARC registersLRA FSW-952 Decompression Failures discovered during Observatory EMILSE, QSE FSW-966 GRBP bug fixes and performance improvements GRBP Changes to ground software constituents: FSW-959 Allow LATC exception specifications to inherit default valuesLATC FSW-960 B1-0-1lat_tlm_itos.dbx mnemonic issuesLCAT FSW-964 LPA Config packets 0x2e0-0x2e3 contain identical mnemonicsLCAT FSW-961 Do CAL single-range readout when performing ACD and TKR calibrationsLCI FSW-958 Potentially misleading LCI XML tag LCI FSW-965 Misspelled ITOS mnemonics in file-system-status packet.LFS FSW-957 Inconsistent bitfield definition of LFSDEMPTFILE in dbx outputLFS FSW-962 GRB Alert, Update, Closeout packets have duplicate mnemonicsLPA New configurations FSW-917 Implement the filter parameters described in TD XFC_DB

6 B1-0-3, B1-0-4, B2-0-0 KeySummaryComponent/s FSW-872 Illegal memory reference in LCBD after request list fetch errorLCBD FSW-287 Anti-flooding for MSGMSG FSW-931 Increase number of housekeeping schedule slotsLHK LCI improvements: FSW-790 Tracker calibration doesn't work correctly with uneven splitsLCI FSW-576 Bug in CAL data compression algorithmLSEC FSW-789 LCI event data is inconsistent if TEM errors or diagnostics presentLSEC, QSEC FSW-419 If LSEC cannot encode an event, nothing is placed into the datagram.LSEC LATC improvements: FSW-582 Capture of layer splits in LATC does not consider the FE mode registersLATC FSW-729 LATC verify error responseLATC FSW-538 There is no way to ignore the AEM when the LATC_verify operation is performed.LATC FSW-791 High and low splits are not separately ignorableLATC PIG improvements: FSW-414 Add internal resources to PIG and eliminate the LEM_micr argument present in most function prototypes/LIM, PIG FSW-280 CAL and ACD bias voltage settingsLEM Survey FSW-838 PPC compiler is treating a char as an unsigned quantity rather than a signed FSW-703 Ensure all registers are setPIG FSW-562 Make sure that PIG's power sequence is still correctPIG

7 JIRA Metrics as of 31 July 2007 Open issues are divided as follows –30 items planned for B items associated with a single housekeeping JIRA; split into 16 for tracking purposes 8 items are changes to ground software –2 being investigated –2 on Project CCB agenda Note: graph no longer includes candidate post-launch items (i.e., “Deferred”, “B2-0-0”)

8 GLAST Large Area Telescope Monthly Mission Review Backup Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

9 GRB algorithm performance improvements Performance is sensitive to cluster size and input rate. Cluster sizes: 80 photons, 200 photons, 500 photons Input rates: 200 Hz, 400 Hz Caveat lector: There are non-linear effects which could push these numbers up or down. These measurements are derived from basic time measurements, not measurements of CPU usage (as reported by housekeeping) 80 photons200 photons500 photons RateOldNewOldNewOldNew 200 Hz3.4%1.3%N/A3.6%50%10% 400 Hz6.8%2.6%N/A7.2%100%20%

10 B1-0-1 leftovers KeySummary FSW-305 Summary/statistics telemetry stream needs to be created for on-board event processors FSW-806 Revisit rate counter implementation FSW-789 LCI event data is inconsistent if TEM errors or diagnostics present FSW-582 Capture of layer splits in LATC does not consider the FE mode registers FSW-938 LMC Delta timestamp telemetry field description is incorrect FSW-917 Implement the filter parameters described in TD FSW-948 Add LPA_DB instance ID to housekeeping FSW-946 Add LATC info to housekeeping telemetry FSW-950 Add GRB GBM and EPU states in housekeeping FSW-949 Add default values of LATC, LPA_DB and LATC ignore files for physics acquisitions to housekeeping FSW-947 Add LCI program file ID to housekeeping FSW-945 Add PDU/GASU power and CRU Configuration register info to housekeeping FSW-944 Add LHK configuration files in use to housekeeping FSW-943 Put LRA in charge of tracking GEM sent, prescaled, discarded, livetime, deadzone for housekeeping FSW-942 Add simulating/not simulating info for THS time tone and time hack to housekeeping FSW-941 Add memory scrub info to housekeeping FSW-918 Include Run ID in housekeeping FSW-934 Add telemetry to report on LAT power state and state/configuration of physics data acquisition FSW-951 Add "dirty" flag in housekeeping to indicate non-nominal configuration change FSW-939 Add LTC configuration file ID to housekeeping Configuration file changesAddition to housekeeping – tracked as individual JIRAs