GLAST LAT Project Technical/Cost/Schedule Review 03/30/06 4.1.9 - Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.

Slides:



Advertisements
Similar presentations
GLAST LAT ProjectMonthly Review, Aug-1, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Advertisements

GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT Project Managers F2F Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test April.
GLAST LAT Project Online Peer Review – July 20, Integration and Test R. Claus 1 GLAST Large Area Telescope: I&T Integration Readiness Review.
GLAST LAT Instrument GLAST Monthly Mission Review May 2, 2007 K.A. Fouts, SLAC 1 Monthly Mission Review Project Status Overview May 2, 2007 Ken Fouts SLAC.
GLAST LAT Instrument GLAST Monthly Mission Review August 6, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview August 6, 2007 Ken Fouts.
IFCT Plan for Next 3 Months Larry Wai June 26, 2003.
GLAST LAT ProjectMonthly Status Meeting Jan 26, Project Status January 26, 2006 Gamma-ray Large Area Space Telescope Lowell A. Klaisner Project.
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 Online 1 GLAST Large Area Telescope: I&T Integration Kickoff Meeting EGSE Hardware March 9th,
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
GLAST LAT Project LAT System Engineering 1 Test Definition Planning Pat Hascall SLAC System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectNovember 04, 2005 Phase 0 TRR 1 GLAST Large Area Telescope: Integration and Test -Electrical Test- Phase 0 TRR Key Requirements Documents.
GLAST LAT Instrument GLAST Monthly Mission Review October 29, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 29, 2007 Ken.
GLAST LAT Project Aug 1, 2007 NCRs and Waivers 1 GLAST Large Area Telescope Systems Engineering Test Status, NCRs and Verification Status Pat Hascall Systems.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT Instrument GLAST Monthly Mission Review October 5, 2007 K. Fouts, SLAC 1 Monthly Mission Review Project Status Overview October 5, 2007 Ken Fouts.
GLAST LAT Project Managers F2F 6/15/ Integration and Test 1 GLAST Large Area Telescope: Face to Face Managers Meeting LAT Integration & Test.
GLAST LAT Instrument GLAST Monthly Mission Review July 12, 2007 N. Johnson, NRL 1 Monthly Mission Review Project Status Overview July 12, 2007 Neil Johnson.
GLAST LAT Project Technical/Cost/Schedule Review 03/31/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT Project Technical/Cost/Schedule Review 09/01/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectNovember 3, 2005 I&T Phase 0 IRR/TRR 1 GLAST Large Area Telescope: Integration and Test Phase 0 IRR/TRR November 3-4, 2005 Introduction.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
ISOC/SVACInstrument Analysis Meeting, Quatorze Juillet, 2006 Anders W. Borgland 1 Announcements Anders W. Borgland Science Verification, Analysis and Calibrations.
GLAST LAT ProjectDOE/NASA Status Review, March 30 & 31, 2004 Integration and Test 1 Integration, Facilities, Configuration, and Test (IFCT) Flow Procedure.
ISOC Peer Review - March 2, 2004 Section GLAST Large Area Telescope ISOC Peer Review Test Bed Terry Schalk GLAST Flight Software
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
1 GLAST LAT Arrival at Spectrum Assuming That the LAT Transport Container Arrives on Flatbed Truck Question: Can Transport Cover Support Crane Lift With.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT Project Test Planning Meeting Dec 5, 2005 E. do Couto e Silva 1/5 Final Proposal for Phase 1 and 2 SVAC, E2E Tests (hereafter LAT 70X, 80X) Eduardo,
GLAST Large Area Telescope:
GLAST LAT I&T GLAST Monthly Mission Review Nov 3, 2005 wnjohnson 1 Monthly Mission Review LAT Environmental Test Planning November 3, 2005 W Neil Johnson.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT Project4 April 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
GLAST LAT Project Technical/Cost/Schedule Review 06/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT Project Technical/Cost/Schedule Review 04/26/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
GLAST LAT Project LAT System Engineering 1 GLAST Large Area Telescope: LAT System Engineering Pat Hascall SLAC System Engineering Manager
1 GLAST LAT ProjectMechanical Systems Mechanical Systems September 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems November 2003 GSFC Status Marc Campell, Subsystem Manager.
GLAST LAT Project13 June 2005 LAT System EngineeringLAT Test Planning Meeting GLAST LAT GLAST LAT System Engineering Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review Project Overview 1 Presentation 1 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review W.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Mechanical Integration
Environmental Test Planning
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST LAT System Engineering
LAT Pre-Environmental Test Plan
GLAST Large Area Telescope: I&T Integration Kickoff Meeting
EPU load – same as SIU load except…
Thermal Vacuum Test: Plans and Procedures
Integration and Test Organization Chart
Environmental Test Planning Meeting
GLAST Large Area Telescope: I&T Test Readiness Review
GLAST Large Area Telescope: I&T Test Readiness Review
Presentation transcript:

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Monthly Technical/Cost/Schedule Review 03/30/06 Ken Fouts SU-SLAC I&T Manager Gamma-ray Large Area Space Telescope

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 2 Last Month's Accomplishments (1 of 2) Management –Maintaining Daily Planning/Hand-off Meetings –Supporting Environmental Test Planning –Chair LAT I&T CCB IFCT –Removed (for RAD750 board inspection) and reinstalled 1 SIU and 2 EPUs –Installed FSW B0-6-3, B0-6-4, B0-6-5, B0-6-6 –Completed Pathfinding II (TVAC and Radiator handling ops) activities at NRL.

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 3 SVAC –Preparing for full LAT tests Online –Developing LICOS scripts Last Month's Accomplishments (2 of 2)

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 4 Steps to Ship to NRL Phase 0 – Hardware check out –Hardware ACD Flt PDU, Flt GASU (EM GASU), Flt Cables, EMI Skirt, no SIU/EPU –Software LATTE 4 –Exit Successful LATTE 4 CPT Phase 1 – Software check out –Hardware Flt PDU, Flt GASU, 2 Flt SIU, 3 Flt EPU, VSC, Control/Pwr Racks –Software FSW, VSC, LICOS, Configuration Database –Exit Successful LICOS CPT Phase 2 – Run for the record –Hardware Full complement of flight hardware (See Above) –Software Flight release of FSW, VSC, LICOS, Configuration Database –Exit Successful LICOS CPT, SVAC, E2E, Verification w/SIIS

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 5 Weight & CG CPT Sine Vibe Offload & Set-up LAT Offload & Set-up LAT 5 days 9 days Install Radiator s 2 days EMI/EMC Test 11 days Acoustic Test 7 days 3 days Remove Radiator s Remove Radiator s 2 days LAT Test Flow Pack and Ship 2 days T- Bal Pre TV T- Cycle 40 days CPT NOTE: Durations for moving and setup have been incorporated into the total duration for the test. SIIS Verification will be worked in as appropriate. Shipment Install X- LAT/LPT System Commissioning/ System Test 5 days 3 days 4/20/06 4/28/06 6/20/06 8/21/06 8 days

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 6 Detailed Plan (1 of 5)

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 7 Detailed Plan (2 of 5)

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 8 Detailed Plan (3 of 5)

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 9 Detailed Plan (4 of 5)

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 10 Detailed Plan (5 of 5)

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 11 Online Script Status

GLAST LAT Project Technical/Cost/Schedule Review 03/30/ Integration and Test 12 Issues and Concerns Schedule –Using weekends for additional troubleshooting. –Rapid turnaround on NCR disposition and resolution. Script Availability –Addition resources from ISOC to Online to parallelize script development Availability of FMX/MOOT