Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 – End Of Day:  Progress Update  Concept.

Slides:



Advertisements
Similar presentations
R. I. T Mechanical Engineering Engineering Design Brief Case Study: What is the Engineering Design Process and Why is it Critical? Rochester Institute.
Advertisements

P08026: Modular Hemodynamic Flow Simulator Jason Brown Mechanical Engineering Amanda Clark Mechanical Engineering Matthew Hicks Electrical Engineering.
System Level Design Review P10029: Control Enhancements for Air Muscle Biomimetic Hand Customer: Dr. Lamkin-Kennard Faculty Guide: Ed Hanzlik Team Members:
Project Review. Current State Currently on track to meet our mission objectives and cover all customer needs – Unpredictable to know whether or not sensors.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 3:  Progress Update  Specifications 
Team #1: Brandon Fichera Dave Rabeno Greg Pease Sean Gallagher Sponsor: Dr. Stephanie Wright Delaware Aerospace Academy Advisor: Dr. Michael Keefe Mission.
Status Update for P09321 Automatic Medicine Dispenser.
Week 3: End of Day P Progress Edge Organized page for ease of additional document addition Added New Documents.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 4 Presentation:  Selected Concepts  Engineering.
Cooper Vision Team Status Update Friday December 19, 2008.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 Presentation:  Work Breakdown Structure.
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 4 End of Day Presentation:  Design Review.
EDGE™ Centering Magnet Device P08028 By: Aaron Burger.
Project Overview E911 Provisioning System Royal Flush Software
WBS & AO Controls Jason Chin, Don Gavel, Erik Johansson, Mark Reinig Design Meeting (Team meeting #10) Sept 17 th, 2007.
EDGE™ Final Project Presentation P09141 – Satellite Thermal Heater Controller Anthony Berwin (Mechanical Engineer)
Minor program 1 Aerospace Systems Design & Technology Goals: To introduce the student to the relationships between physical processes and their numerical.
Design Reviews.1 KGCOE Multidisciplinary Sr. Design Borkholder 2007 R I T Design Reviews Objectives of the Design Review Participants for a successful.
Detailed Design Review of Magnetic Field Centering Device Project # P08028 “Develop a Design and Methodology to Ensure the Concentricity between the Magnetic.
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Jon Klein Project Manager Kyle Menges Technical Lead Priya Narasimhan Electrical Engineer Julie Coggshal Industrial and Systems Engineer Christine Lowry.
Six Steps to a Better WBS Presented by 41 Bloomfield Street Lexington, MA USA © 2011 Project Management Partners.
Sponsored by Wegmans P Automation/Improvement of Packaging on the Cookie Line Stephanie Rager Bruno Coelho.
Lecture 4: Phases of Engineering Design
Project Management Process Overview
Project Requirements COP 4331 OO Processes for Software Development © Dr. David A. Workman School of EE and CS University of Central Florida March 22,
Jon KleinISEProject Manager Nguyen VuMETechnical Lead Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer Priya NarasimhanEEElectrical.
The Iterative Process of Project Planning 13 Structure the project
First-Year Engineering Program Performance Test 2: Operational Objectives Objective and Goals Analysis Test Readiness Review.
Biochar Concrete Roofing Sheets for Nicaragua
Managing Engineering Design - Infrastructure. Presentation Overview 1.Tools and Techniques 2.Design and Documentation 3.Estimating and Scheduling.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
Data Teams and Tiered Intervention Response Presented by the Center for Performance Assessment Dr. Elle Allison February 2, 2006 NHSAA Presented by the.
MA Educational Data Warehouse Project MADOE and School District Collaboration Maureen Chew MADOE MA Digital Govt Summit 12/11/2007.
GOVERNOR’S EARLY CHILDHOOD ADVISORY COUNCIL (ECAC) September 9, 2014.
Project Proposal Document Optimization 15 February 2007 Team members: Chris Catalano Chun-Yu Chang Chris Joson David Matthes.
RSS News Feed Generator Team Even Steven Phil Light, Carol Coon, Madura Mahenhthiran, Becky Vanderhoff, Chris Mamorella, Lars Avery.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
First-Year Engineering Program Performance Test 3: Energy Optimization Objective and Goals Lab Procedure Analysis Test Readiness Review.
Prof. Roy Levow Session 10.  Inputs the Client Checkpoint  Questions to Be Answered During Client Checkpoint  Adjusting Functionality for the Next.
Gravity Fed System Team Members: Chris Kulbago, Lauren Pahls, Ted Rakiewicz, Patrick O’Connell, Sarah Salmon, James Brinkerhoff Group Number: P
These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer Science.
PRJ566 Project Planning and Management Project Management Concepts 1.
ITER- TBM Planning and Costing Activity DCLL TBM Mechanical Design ( ) & TBM-Port Interface ( ) Presented by Mo Dagher December
Institute for Space Systems Analysis and Design College of Engineering Virginia Tech College of Engineering Virginia Tech Chris Hall Aerospace and Ocean.
Jon KleinISEProject Manager Nguyen VuMETechnical Lead (MSD1) Kyle MengesMETechnical Lead Christine LowryMEDesign Engineer Chris SteinMEDesign Engineer.
Dr. John MacCarthy UMBC CMSC 615 Fall, 2006
Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall.
P16680: AATech Universal Oil and Bag System System Design Review 9/29/15.
Chapter 2 Project Management Methodologies. A project life cycle PlanDesignDevelop Integrate (including test) DeployMaintain They can be iterative and.
Intelligence and Information Systems 1 3/17/2004 © 2004 Raytheon Company USC/CSE Executive Workshop on Agile Experiences March 17, 2004 A Raytheon Agile.
Computer Troubleshooting Intelligent System (CTIS) is being developed for Computer Services Department of the Student Health Center at UCF EEL 5874 EXPERT.
7 November 2006Program Management Basics Purdue FIRST Programs Slide 1 Program Management Basics Purdue FIRST Programs Chris Fultz Rolls-Royce Corporation.
Information Technology Project Management, Seventh Edition.
Midpoint Project Review P10454 VAD Test Loop
Project management Software development typically includes:
Inputs Outputs Tools and Techniques.
Tracking Performance Data
Cold Pressure Fusing II Team Fusion
Chemical Solidification and Breakdown
Dr. Samer Odeh Hanna (PhD)
HEMODYNAMIC SIMULATOR II P09026
P07107: Mission Control Procedures Aerospace Systems and Technology
Project Readiness Review P10029 – Air Muscle Artificial Limb
Lancaster ISD 2015 Bond Program Update
Team name Pictures/names of your team members Logo (if applicable)
Team P09007 Derek Horton Matthew Sennett Lucas Sienk Matt Sones
Systems Level Design Review
NOTICE! These materials are prepared only for the students enrolled in the course Distributed Software Development (DSD) at the Department of Computer.
Presentation transcript:

Team Members: Jon Klein Nguyen Vu Kyle Menges Christine Lowry Chris Stein Priya Narasimhan Julie Coggshall Week 2 – End Of Day:  Progress Update  Concept Generation  Action Items

Second interview with customer (Dr. Day) Identified that Customer Needs and Specifications documents need more revision Team concept generation and brainstorming session Identified action items and deliverables for next week

Pump integration Fluid extracting for testing Physiological simulation Fluid Input Fluid Drain

*Department of Mechanical & Aerospace Engineering, University of Virginia, VA; †Utah Artificial Heart Center, UT, U.S.A.

Continue Concept Development Explore options for functional boxes Continue Benchmarking for functional boxes Analyze Concepts Select Concept Finalize Specifications Iterate Customer Needs, WBS, Schedule…