1 Econometric Load Forecasting 2005 - 2011 Peak and Energy Forecast 06/14/2005 Econometric Load Forecasting 2005 - 2011 Peak and Energy Forecast 06/14/2005.

Slides:



Advertisements
Similar presentations
Part II – TIME SERIES ANALYSIS C3 Exponential Smoothing Methods © Angel A. Juan & Carles Serrat - UPC 2007/2008.
Advertisements

Forecasting OPS 370.
FTP Biostatistics II Model parameter estimations: Confronting models with measurements.
06/04/2009 TAC 2009 Long-term Demand and Energy Forecast (LTDEF) and Capacity, Demand and Reserves (CDR) Calculation Dan Woodfin Director, System Planning.
1 BIS APPLICATION MANAGEMENT INFORMATION SYSTEM Advance forecasting Forecasting by identifying patterns in the past data Chapter outline: 1.Extrapolation.
Exponential Smoothing Methods
Linear Regression.
Statistics for Managers Using Microsoft® Excel 5th Edition
Data Sources The most sophisticated forecasting model will fail if it is applied to unreliable data Data should be reliable and accurate Data should be.
Chapter 13 Forecasting.
Forecasting & Time Series Minggu 6. Learning Objectives Understand the three categories of forecasting techniques available. Become aware of the four.
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
Chapter 11 Multiple Regression.
Empirical Estimation Review EconS 451: Lecture # 8 Describe in general terms what we are attempting to solve with empirical estimation. Understand why.
Basic Business Statistics, 11e © 2009 Prentice-Hall, Inc. Chap 15-1 Chapter 15 Multiple Regression Model Building Basic Business Statistics 11 th Edition.
Statistical Forecasting Models
2011 Long-Term Load Forecast Review ERCOT Calvin Opheim June 17, 2011.
Slides 13b: Time-Series Models; Measuring Forecast Error
CHAPTER 18 Models for Time Series and Forecasting
Correlation & Regression
© 2003 Prentice-Hall, Inc.Chap 12-1 Business Statistics: A First Course (3 rd Edition) Chapter 12 Time-Series Forecasting.
Lecture 4 Time-Series Forecasting
Linear Regression and Correlation
Measuring and Forecasting Demand
Electric / Gas / Water Eric Fox Oleg Moskatov Itron, Inc. April 17, 2008 VELCO Long-Term Demand Forecast Methodology Overview.
Big Sandy Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
Farmers Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
Time-Series Analysis and Forecasting – Part V To read at home.
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
ERCOT PUBLIC 7/14/ Long-Term Load Forecasting Calvin Opheim ERCOT Manager, Forecasting & Analysis LTSA Scenario Development Workshop July 14, 2015.
© 2004 Prentice-Hall, Inc.Chap 15-1 Basic Business Statistics (9 th Edition) Chapter 15 Multiple Regression Model Building.
2007 Planning Long-Term Hourly Demand and Energy Forecast Board of Directors Meeting May 16, 2007 Bill Bojorquez.
© 2007, Itron Inc. VELCO Long-Term Demand Forecast Kick-off Meeting June 7, 2010 Eric Fox.
Why Normal Matters AEIC Load Research Workshop Why Normal Matters By Tim Hennessy RLW Analytics, Inc. April 12, 2005.
Chapter 12 Examining Relationships in Quantitative Research Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 ERCOT 2007 Strategic Financial Plan & Budget Proposal _____________________ Board of Directors November 14, 2006.
Compiled by Load Profiling ERCOT Energy Analysis & Aggregation
Grayson Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ERCOT Long-Term Demand and Energy Forecasting February 20, 2007 Bill Bojorquez.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Time Series Forecasting Chapter 16.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Time Series Forecasting Chapter 13.
1 DSCI 3023 Forecasting Plays an important role in many industries –marketing –financial planning –production control Forecasts are not to be thought of.
UFE 2003 Analysis June 1, UFE 2003 ANALYSIS Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation June 1, 2005.
Examining Relationships in Quantitative Research
Time Series Analysis and Forecasting
Managerial Economics Demand Estimation & Forecasting.
UFE 2005 Analysis 1 UFE 2005 ANALYSIS Compiled by Load Profiling ERCOT Energy Analysis & Aggregation.
May 03, UFE ANALYSIS Old – New Model Comparison Compiled by the Load Profiling Group ERCOT Energy Analysis & Aggregation May 03, 2007.
2016 Long-Term Load Forecast
Welcome to MM305 Unit 5 Seminar Prof Greg Forecasting.
Blue Grass Energy Cooperative Corporation 2006 Load Forecast Prepared by: East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis Department.
ERCOT PUBLIC 10/7/ Load Forecasting Process Review Calvin Opheim Generation Adequacy Task Force October 7, 2013.
Licking Valley Rural Electric Cooperative Corporation 2006 Load Forecast Prepared by : East Kentucky Power Cooperative, Inc. Forecasting and Market Analysis.
09/17/2006 Ken Donohoo ERCOT Peak Day August Initial Settlement Data by Fuel Type.
Forecasting Parameters of a firm (input, output and products)
South Texas Electric Cooperative Load Forecasting Methodology ROS Meeting, 6/10/10.
Basic Business Statistics, 10e © 2006 Prentice-Hall, Inc. Chap 15-1 Chapter 15 Multiple Regression Model Building Basic Business Statistics 10 th Edition.
Statistics for Managers Using Microsoft Excel, 4e © 2004 Prentice-Hall, Inc. Chap 14-1 Chapter 14 Multiple Regression Model Building Statistics for Managers.
Forecasting is the art and science of predicting future events.
Forecasting Demand. Problems with Forecasts Forecasts are Usually Wrong. Every Forecast Should Include an Estimate of Error. Forecasts are More Accurate.
Forecasting. Model with indicator variables The choice of a forecasting technique depends on the components identified in the time series. The techniques.
Welcome to MM305 Unit 5 Seminar Dr. Bob Forecasting.
Yandell – Econ 216 Chap 16-1 Chapter 16 Time-Series Forecasting.
Yandell – Econ 216 Chap 15-1 Chapter 15 Multiple Regression Model Building.
Chapter 15 Multiple Regression Model Building
Demand Estimation and Forecasting
Correlation and Simple Linear Regression
Independent Load Forecast Workshop
CHAPTER 29: Multiple Regression*
Forecasting Plays an important role in many industries
Presentation transcript:

1 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005 Econometric Load Forecasting Peak and Energy Forecast 06/14/2005

2 Previous ERCOT Forecast Methodology The previous load forecast methodology was based on a simplistic trending of historic ERCOT peak demand growth to develop the long-term forecast of summer peak demand, unadjusted for weather or economic conditions Several compound growth rates were calculated (10-year, 5-year, 2-year, etc). These growth rates were applied to the latest available peak to obtain forecasts, and the most reasonable forecast was selected, based on judgment

3 Forecasting Improvement Original Plan –Develop hourly load forecast for five years for smaller regions of ERCOT (either weather zones or CM areas) for use in UPlan studies –Sum of these forecasts across ERCOT would be used as the ERCOT System peak and energy forecast Revised Goal –Due to the immediate need for a more rigorous forecasting approach, the goal for the current forecast cycle was changed to develop an ERCOT system forecast directly

4 Econometric Forecasting Basics Regression Analysis Develop an equation or equations that describe the historic load as a function of certain independent variables –Variables must be logical, historically measurable and have an available forecast Statistical analysis techniques are used to calculate the appropriate coefficients on each variable and to choose the best equations –Equations are chosen that minimize sum of the squares of the differences between the actual, observed load levels and the load levels that are predicted by inserting the historic values of the independent variables into the equation Projected values for each of the variables in the equations are then inserted into the equations to produce the forecast

Forecasting Process ERCOT Total System Hourly Load Forecast Allocate Energy Allocate Energy Allocate Energy ERCOT Peak and Energy Forecast Economic Data Weather Data Calendar Data Forecasted Data Load Data Economic Data Weather Data Calendar Data Historic Data ERCOT Total System Summer Hourly Load Shape Model ERCOT Total System Winter Hourly Load Shape Model ERCOT Total System Spring/Fall Hourly Load Shape Model ERCOT Winter Monthly Energy Model ERCOT Spring/Fall Monthly Energy Model ERCOT Summer Monthly Energy Model Six Regression Equations

Forecasting Process 1.Obtain weather and economic variables (historic and forecast) 2.Develop regression equations describing the historic actual: –Monthly Energy Using a different equation for each season –Hourly Load Shape Using a different equation for each season 3.Incorporate forecasted values of economic and normalized temperatures for into Monthly Energy equation to produce forecasted monthly energy 4.Incorporate normalized temperatures for into Monthly Energy equation to produce forecasted load shape 5.Produce hourly demand forecast by fitting forecasted monthly energy under projected hourly load shape

7 Load Data Economic Data Weather Data Calendar Data Historic Data 2005 Forecasting Process Historic Data

8 Historic Data - Economic 1.Economic Data Economic data obtained from Economy.com Data includes economic and demographic data (such as income, employment, housing permits, GDP, population and migration patterns) for Texas at the state, county, Metropolitan Statistical Areas (MSAs), and national level

9 Historic Data - Weather 2. Weather Data Ten years of weather data obtained from Weather Bank for 20 weather stations The data is first weighted by individual weather stations using ERCOT’s standard weighing factor, and then for the total system using weights proportional to the load in each weather zone

10 Historic Data - Load 3. Load Data Settlement load data available on an hourly basis since July 31, 2001 Prior to 2001, we have Transmission and Distribution Service Providers (TDSP) hourly data

11 Load Data Economic Data Weather Data Calendar Data Historic Data ERCOT Total System Summer Hourly Load Shape Model ERCOT Total System Winter Hourly Load Shape Model ERCOT Total System Spring/Fall Hourly Load Shape Model ERCOT Winter Monthly Energy Model ERCOT Spring/Fall Monthly Energy Model ERCOT Summer Monthly Energy Model Six Regression Equations 2005 Forecasting Process Regression Equations

12 Develop monthly energy and hourly load shape equations for each season The general formulation of the energy equations is: Energy Month i = f {Cdd, Hdd, Income, Population, Monthly Indicators} The general formulation of the load shape equations is: Load hour i = f {Max Temps, Lagged Temps, Heat Index, Non- Linear Temp Components (square and cube), Temp Gains (diff between daily high and Low temps), Temp Build-up, Dew Point, Month*Temp Interactions, Cdd, Hdd, Hour of Day Indicators, Weekday/Weekend, Holidays, Population, income} Regression Equations

13 Variable Selection and Regression Estimation Details Multiple Regression Analysis was use to develop the forecasting equations Initial selection of variables came from a stepwise procedure to determine those that were the most statistically significant A subset of those variables was carefully chosen on the basis of empirical results and judgment –Variables had to be logical, historically measurable and have an available forecast Ordinary Least Squares techniques with some of the models including autoregressive error terms were used to calculate the appropriate coefficients on each variable and to choose the best equations

14 Load Shape Model Fit

15 Model Fit Detailed SAS output is included at the end of the presentation, showing: –Model Variables –Coefficients –Statistical analysis

16 Load Data Economic Data Weather Data Calendar Data Historic Data ERCOT Total System Summer Hourly Load Shape Model ERCOT Total System Winter Hourly Load Shape Model ERCOT Total System Spring/Fall Hourly Load Shape Model ERCOT Winter Monthly Energy Model ERCOT Spring/Fall Monthly Energy Model ERCOT Summer Monthly Energy Model Six Regression Equations Economic Data Weather Data Calendar Data Forecasted Data 2005 Forecasting Process Forecasted Data

17 Economic Forecast ERCOT obtains the economic forecasts used in the models from Economy.com Economy.com is a leading national provider of economic data and forecasts, with over 500 clients worldwide including AEP, LCRA and Entergy Forecasts and data received includes economic and demographic data (such as income, employment, housing permits, GDP, population and migration patterns) for Texas at state, county and MSA, and some national economic data

18 Economic Forecast Growth Rates

19 Economic Forecast Growth Rates 1.95% 1.18% 1.33% 2.52%

20 Forecasted Weather Data Weather Forecast Assumptions Calculation of the normalized temperature profile involves the following steps: 1)Compute an overall system temperature for every year by combining the weather zone temperatures and weighing them according to the load in each zone 2)Rank the hourly temperatures for each year from highest to lowest 3)Determine the median temperature from all years for every hour 4)Calculate the sum of the absolute values of the difference of the median and the hourly temperatures for all hourly temperatures in each year 5)Determine the year with the minimum summed value and select this year as the typical year profile 6)Use this year’s profile to resort the median temperatures

21 Allocate Energy Allocate Energy Allocate Energy Load Data Economic Data Weather Data Calendar Data Historic Data ERCOT Total System Summer Hourly Load Shape Model ERCOT Total System Winter Hourly Load Shape Model ERCOT Total System Spring/Fall Hourly Load Shape Model ERCOT Winter Monthly Energy Model ERCOT Spring/Fall Monthly Energy Model ERCOT Summer Monthly Energy Model Six Regression Equations ERCOT Total System Hourly Load Forecast ERCOT Peak and Energy Forecast Economic Data Weather Data Calendar Data Forecasted Data 2005 Forecasting Process Hourly Forecast

22 Hourly Forecast The forecasted hourly shape from the load shape equations is scaled to produce the final hourly forecast –Each hour’s load is scaled so that the amount of energy under the load shape for a month is equal to the amount of energy projected for that month by the energy forecast from the energy equations –The percent of a month’s energy that is contained in an each hour from the load shape equation is maintained The peak forecast is the highest hourly load from this final hourly forecast

23 ERCOT Peak Forecast 1.83% Avg. Growth

24 ERCOT Energy Forecast 2.10% Avg. Growth

25 Forecast Growth Rates - Annual

26 Forecast Growth Rates - Annual 1.44% 1.81% 1.34% 2.10% AVG=56.16%

27 Questions?

28 Appendix Model Parameters and Statistics SAS Output

29 Summer Season Load Shape Equation

30 Summer Season Energy Equation

31 Winter Season Load Shape Equation

32 Winter Season Load Shape Equation

33 Winter Season Load Shape Equation

34 Winter Season Energy Equation

35 Spring/Fall Season Load Shape Equation

36 Spring/Fall Season Load Shape Equation

37 Spring/Fall Season Load Shape Equation

38 Spring/Fall Season Energy Equation