Y. Karadzhov, MICE Video Conference 25-feb TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated area in the TOF stations.

Slides:



Advertisements
Similar presentations
Use of Technology in Education Deb Case-Cromer, RN, MS Coordinator for Nursing Education The Johns Hopkins Hospital E ducation R etooling.
Advertisements

Classroom management Classroom interactions Students’ Attention EvaluationTeaching techniques.
1 Progress report on Calorimeter design comparison simulations MICE detector phone conference Rikard Sandström.
CDF Operations Bob Wagner, ANL May 09, 2005 All Experimenters’ Meeting.
It used to be when someone received bad service, they would tell a few friends... now, they tell the world. - “Customer Service Gone Viral” video.
CDF Steve Hahn January 13, CDF Operations Summary Thurs. Fri. Sat. Mon. Tues. Wed. Stores long enough for accounting in bold Don ’ t believe! Generally,
KEK Test Beam Phase II Plan Makoto Yoshida (Osaka Univ.) MICE FT Daresbury 2005/8/30.
TOF0 calibration The resolution in a given pixel can be measured before the absolute time calibration (see the plot) The expected total resolution of the.
Emittance–momentum matrix1 Demonstrating the emittance-momentum matrix Mark Rayner, MICE Video Conference, 21 January Initial 4D.
Linda R. Coney – 24th April 2009 MOM Update Linda R. Coney 21 September, 2009.
1 Analysis of TOF data Yordan Karadzhov St.Kliment Ohridski University of Sofia.
Online Reconstruction Update Linda R. Coney UCR Mar 25, 2010.
Review of PID simulation & reconstruction in G4MICE Yordan Karadzhov Sofia university “St. Kliment Ohridski” Content : 1 TOF 2 Cerenkov.
11-FEB-2004 TJR1 MICE Beamline TOF Analysis Tom Roberts Illinois Institute of Techology February 11, 2004.
Y. Karadzhov MICE MICO First EMR Plots 1.EMR detector has been successfully incorporated in the MICE DAQ system. 2.First 3 days of data taking in MICE.
9/04/2001CHEP'01, Beijing, China On the way to maturity - The CLEO III Data Acquisition and Control System Hubert Schwarthoff Cornell University With V.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
MOM report Mico Meeting 8/3/2010. DS is down: – beamline highly penalised  all detectors suffer – calibration at low rate only – problem is too high.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
5 May 2009MICE Analysis - MR1 The December Shifts: Beam Characterization by the Time of Flight System Mark Rayner.
Progress and plans on PID simulation and reconstruction Yordan Karadzhov Sofia university St. Kliment Ohridski.
TOF calibration Y. Karadzhov. Y. Karadzhov, MICE CM26 24 March Slide 2 TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated.
6 th April 2005 Malcolm Ellis, Imperial College London 1 Sci Fi Status & KEK Test.
MICO 15 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - User Run Plans.
18 August 09Mark Rayner – Momentum measurement by The TOFs1 Momentum measurement by the TOFs A correction to an O(4 MeV/c) bias on the current muon momentum.
1 G4MICE TOF Reconstruction & KEK Test Beam Analysis Update Aron Fish Tracker Phone Conference May 25, 2006.
X.Dong, USTC/LBNL Feb. 20th, 04, STAR Collaboration Meeting 1 TOF Software Progress Xin Dong, for TOF Group  TOF detectors in Run IV  Online software.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
CM26 March 2010Jean-Sebastien GraulichSlide 1 Online Summary o The heplnw17 case o DAQ o CAM o Online Reconstruction o Data Base o Data Storage Jean-Sebastien.
24/03/2011P.-A. Loizeau – Univ. Heidelberg The CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni Heidelberg DPG 2011, Münster.
Physics Program and Runs: Autumn 2011 & Step IV V. Blackmore MICE Project Board, 08/03/12.
The Prophets: Things are Not as They Appear Finding God in Loss and Suffering Lamentations 3:19-30.
MIEL 2012 Title of Your Talk Author name(s) Affiliation.
Analysis strategy of high multiplicity data Toshiyuki Gogami 24/Feb/2011.
27/6/05 Frascati1 M. Bonesini INFN Milano MICE TOF stations updates.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
TOF Meeting, 9 December 2009, CERN Chiara Zampolli for the ALICE-TOF.
Some features of V1495 Shiuan-Hal,Shiu Everything in this document is not final decision!
25-May-03 jadzia warchol, ext. 8341, phone Calibration of FPD detector Content Page General2 Calibration 3 Taking data (Calibration or Pedestal.
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
Solo Ad Basics. 1 Find or Create a Landing Page Write the Subject Line Should get the most attention Make it catchy and interesting Be clear and direct.
18/03/2010 DPG Bonn – March Session: HK 48 A demonstrator for the CBM Time of Flight wall electronic readout chain Pierre-Alain Loizeau PI – Uni.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
E-log is a very clever software written by Steffen Ritt from PSI It can do lots of things and can be used well. Will give you an example of use by NA61.
UC-12 L1 Flight Track over Ground Sites.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
M. Bonesini – CM 291 PID detectors summary M. Bonesini Sezione INFN Milano Bicocca.
Fiber routing test Marc & Qian (We did not glue in any fibers and only used tape for temporary purpose. We routed four fibers.)
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Mark Rayner – Analysis SessionCM25, 4 November Beam characterization by the TOFs Mark Rayner The University of Oxford MICE CM25.
ID Week 13 th of October 2014 Per Johansson Sheffield University.
M. apollonio 7/7/2010CM27 - RAL11 Beam-Line Analysis …
親愛的吉姆舅舅: 今天吃完晚餐後,奶奶說,在家 裡情況變好以前,您要我搬到城裡跟 您住。奶奶有沒有跟您說,爸爸已經 好久沒有工作,也好久沒有人請媽媽 做衣服了? 我們聽完都哭了,連爸爸也哭了, 但是媽媽說了一個故事讓我們又笑了。 她說:您們小的時候,她曾經被您追 得爬到樹上去,真的嗎? 雖然我個子小,但是我很強壯,
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
Mark Rayner – Analysis SessionCM25, 4 November The TOF detectors: Beyond particle identification Mark Rayner The University of Oxford MICE CM25.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Jean-Sebastien Graulich, Geneva
TOF CALIBRATION DATABASE
No Deposit Bonus Casino
F.Guber, A.Ivashkin INR, Moscow
CLAS12 First Experiment Workshop Report
Tracker Software Status
WELCOME TO Pagnian Imports Pagnian Imports WELCOME TO Pagnian Imports Pagnian Imports.
Theme vs. Central Idea What’s the difference?.
-Intelligence Transport System PHHung Media IC & System Lab
BES III Software: Short-term Plan ( )
Get in pairs/groups. Do online research.
Transnational Access to the MICE facility
Presentation transcript:

Y. Karadzhov, MICE Video Conference 25-feb TOF Calibration - Trigger TOF1 TOF 0 TOF 1 TOF 2 The blue line encloses the calibrated area in the TOF stations.

Y. Karadzhov, MICE Video Conference 25-feb TOF Calibration - Trigger TOF1 Time resolution after the calibration: TOF0 – 51ps; TOF1 – 62ps; TOF2 – 52ps.

Y. Karadzhov, MICE Video Conference 25-feb TOF Calibration - Trigger TOF0 The blue line encloses the calibrated area in the TOF stations. TOF 2 TOF 0 TOF 1

Y. Karadzhov, MICE Video Conference 25-feb TOF Calibration - Trigger TOF0 Time resolution after the calibration: TOF0 – 50ps; TOF1 – 63ps; TOF2 – 51ps.

Y. Karadzhov, MICE Video Conference 25-feb To avoid the confusion, the calibration is documented in the logbook. Message in the logbook

Y. Karadzhov, MICE Video Conference 25-feb How to get the Time of Flight faster? vector tof0sp = tofRec.GetSpacePoints( 0 ); if( tof0sp.size()==1 ) t = theEvent.tofSpacePoints[ tof1sp[0] ]->time(); vector tofUpTrack = tofRec.GetUpStreamTracks(); vector tofDownTrack = tofRec.GetDownStreamTracks(); if( tofUpTrack.size()==1 ) tof = theEvent.tofTracks[ tofUpTrack[0] ]->GetTimeOfFlight(); Here we select TOF0 // this is the time measured by TOF0 // Tracks between TOF0 and TOF1 // Tracks between TOF1 and TOF2 // this is the time of flight between TOF0 and TOF1 This is a faster access to the data. I recommend to use this in the online applications.

Y. Karadzhov, MICE Video Conference 25-feb Data quality runstatustrigger 01467good bad good good good good good good good good bad good good bad good good bad1 We still suffer from the loss of synchronization between the crates of the DAQ. This problem is visible only in TOF2. Shifters should pay more attention on this.