TEC X5 Setup (1) 1 Front + 1 Back petal, fully equipped (28 modules F.P modules B.P. + AOH + DOHM) Petal assembly IPN-Lyon (F.P.), RWTH-Aachen I.
Advertisements

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
1/8/04Lance Simms Thermal Testing of TOB/TEC Hybrids at UCSB.
Slide 1L3 Testing Meeting March 7, 2003UCSB Status-Anthony Affolder UCSB Testing Status Anthony Affolder (for the UCSB module testing group) Current testing.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
Thermal Testing of TEC/TOB Hybrids at UCSB 1/20/04 Slide 1 Thermal Testing of TOB/TEC Hybrids at UCSB.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
Slide 1Module Testing Meeting March 7, 2003US Hybrid/Module/Rod Testing Model-Anthony Affolder US Hybrid/Module/Rod Testing Model Anthony Affolder (for.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
Slide 1X-Calibration Common Testing Issues-Anthony AffolderModule Testing Meeting, June 3, 2003 X-Calibration Common Testing Issues: Grounding, Environmental.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
Slide 1US silicon group meeting 5/6/2003 Hybrid Testing Status 10 new hybrids brought by Lenny all tested à 9 tested with no flaws à 1 had 1 chip + 1 wirebond.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Slide 1UCSB CMS Weekly Status MeetingCMS 4-Hybrid Test System Sam Burke EE UCSB 4-Hybrid Thermal Test System Status 13 October 2003 Sam Burke Lance Simms.
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
Anthony AffolderUS CMS Meeting 12/3/2002Proposal of UCSB Short-term Testing Program Assumptions Electrical and optical hybrids not burnt-in prior to arrival.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Juan Valls - LECC03 Amsterdam 1 Recent System Test Results from the CMS TOB Detector  Introduction  ROD System Test Setup  ROD Electrical and Optical.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
APVDAQ Status Markus Friedl 22 January M.Friedl: APVDAQ Status2 Introduction What APVDAQ Can Do What APVDAQ Cannot Yet Do What APVDAQ Cannot Do.
Electrical Tests of Modules and Ladders Markus Friedl (HEPHY Vienna) 2 October 2014.
CMS Module Testing & Quality Assurance
FNAL Production Experience
ROD assembly and test in US
On behalf of the US TOB testing group
UCSB Testing Status Anthony Affolder
Update of US Testing Status
UCSB Testing Status Anthony Affolder
Results from module testing
UCSB Testing Status Anthony Affolder
Hardware Needs (Near Term)
On behalf of the US TOB testing group
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
Operations/Failure Analysis
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
Hybrid & Module Electrical Testing
US Hybrid/Module/Rod Testing Model
Anthony Affolder UC Santa Barbara
Electrical Testing at UCSB: Hybrids & Modules
US Module Testing Progress Report
Current Module LT Testing Capability
Operations/Failure Analysis
Operations/Failure Analysis
Electrical Testing at UCSB: Hybrids, Modules, & Rods
TOB Module Production Overview and Plan
Hybrid & Module Testing Status
US Module Testing Progress Report
Operations/Failure Analysis
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Equipment Status ARCS equipment status DAQ equipment status
Hardware needs (ARCS) Current ARCS capabilities at both sites should be able to keep up with production assuming software changes Automatic I-V curves,
Presentation transcript:

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A. Affolder University of California Santa Barbara (on behalf of the US TOB testing group)

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder2 Electronics Testing Group –Fermilab (FNAL) S. Tkaczyk +2 technicians –University of California, Riverside (UCR) Gail Hanson, Patrick Gartung –University of California, Santa Barbara (UCSB) A. Affolder, S. Burke, C. Campagnari, D. Hale, J.Incandela, S. Levy, S. Stromberg +2 Undergraduate Students –University of Illinois, Chicago (UIC) E. Chabalina, C. Gerber + 1 Graduate Student –University of Kansas (KU) A. Bean, L. Christofek, D. Coppage –University of Rochester (UR) R. Eusebi, A. Hocker, P. Tipton + 1 Graduate Student

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder3 Outline Introduction  Clean rooms and infrastructure  Test stands Testing model  Plans for production  First “300 modules” Status of each testing stage  Hybrid testing  Module testing  Module burnin  Rod assembly  Rod burn-in with interlocks Summary

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder4 Overview FNAL and UCSB will have equal production capabilities and capacities UCSB will wire bond APV-pitch adaptors and thermal cycle hybrids for US sites  FNAL test stands –2 of 4 DAQ and 2 of 4 ARCS  UCSB test stands –1 of 3 DAQ and 3 of 5 ARCS  UCR module diagnostics and repair –0 of 1 DAQ and 0 of 1 ARC TOB Module Summary Table

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder5 FNAL Testing Clean Room ARCS in place near gantry for quick testing Space allocated for rods burn-in area, additional ARCS and DAQ (burn-in/repair) stands

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder6 UCSB Testing Clean Rooms Clean room adjacent to production area 29 m 2  Room layout finished  Currently in high bay with intentionally same layout –Missing only hybrid thermal cycling test  Beginning to move into completed area as we speak >100 m 2 clean room dedicated solely to TOB rod assembly/testing  Currently removing gantry, wirebonder, OGP from space and into new clean room –Simplifies transportation/storage of rods

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder7 Other Recent Infrastructure Projects Hybrid holding plates  Matches hybrid thermal cycling test stand  Can bond and test with low noise in same holder Hybrid thermal cycler  Just beginning design Burn-in low voltage distribution crate  LED indicators and fuse protection Crowbar  HV protection circuit Hybrid clamshell Module clamshell

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder8 ARCS Based Test Stands Hybrid testing  Hybrid clamshells Hybrid thermal-cycler  Under construction Module testing  Module clamshell  LED systems  DEPP HV supply Hybrid Clamshell Module Clamshell DEPP LED Controller ARC Controller ARC crate ARCS - APV Readout Controller Software Purpose - Fast testing of hybrids and modules Missing hybrid-to-utri adapters to fully use capacity

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder9 DAQ Based Test Stands DAQ system – a prototype of the real CMS tracker readout chain Purpose – fast and burn-in testing of modules and rods (detail)(detail) Single Module Test Stand Module Burn-in Rod Assembly And Burn-in Missing necessary testing components for module burn-in and any rod testing

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder10 The TOB Testing Cycle Quick test hybrids on ARCGantry constructs modules. Modules test on ARC Assemble rods from modules Rod burn-in Rods shipped to CERN Thermal cycled module Wire bond Final pinhole test on ARC Wire bond Thermal cycle hybrids

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder11 Production Ramp Hybrids  Initially hybrids will have pitch adaptors bonded and will be thermally cycled and tested at CERN  Acceptance testing will occur at FNAL and later at UCSB Modules production will follow the flow presented earlier  All will be thermally cycled and run overnight with Vienna boxes to look for infant mortality and measure time constant for pinhole creation if applicable.  Separately some will be run longer to try to determine if any failures have longer time constants Rod Production  Initially we will use whatever single-rod test software is available  We will likely build single rods and run long-term tests on single rods until adequate multi-rod test software is available –Interlocking for safety can be done in parallel with a separate pc

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder12 ARC Hybrid Test Results 4 (11) hybrids have had APV bonded to pitch adapters at UCSB (FNAL)  2 opens developed in 7680 channels –Final pitch adaptors will be more uniform  even better bonding performance Hybrid clamshells enable testing without large pickup effects at chip edges  Same requirements can be made for hybrids with or w/o PA bonded

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder13 Hybrid Thermal Cycler Hybrid pitch adaptor pulsing/thermal cycling test  Acts as short-term burn-in (20 minutes) –Hybrids (and components) tested for several minutes prior to arrival Very custom set-up  Sam Burke (UCSB) has begun design work for electrical system –Baseline provided by CERN  Dave Hale (UCSB) has begun mechanical design  Software for data acquisition and interlocks provided by CERN System should be operational in time for need (late summer)  Test/bonding performed by CERN for M800 hybrids CERN Thermal Cycler If failure rate determined to be low after first hybrids, will only sample test hybrids

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder14 ARCS Module Testing Group’s experience in previous silicon experiments have been used extensively to modify testing procedure  More stable  More descriptive Suggestions have been adopted by CMS silicon testing groups

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder15 ARC Module Testing (2) Chip “feature” makes low common mode noise extremely important  UCSB clamshell decreases common-mode noise to the point where location of opens become detectable by their noise levels –PA-sensor –Sensor-sensor  Pinholes act as if saturated  High current channels can have higher noise (Bad IStrip  Slight noise increase on chip edges Pinholes PA-sensor opens Sensor-sensor opens Bad CAC Bad Istrip Sensor flaw PEAK ON Noisy Strips

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder16 ARC Module Testing (3) Gain test (UCSB)  Test added to determine location of opens without optical inspection/LED test –Necessary for finding opens created during rod assembly/burn-in  Opens clear by higher gain  Pinhole clear by lack of gain Pinholes Sensor-sensor open PA-sensor open Short

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder17 ARC Module Testing (4) Analysis macro under development which correlates testing results to determine type of channel defects  Ultimately will output list of bad channels with suggested repairs/rework necessary for module  Additional generates all plots necessary for module QA Work will be used to define testing criteria for cross calibration of all CMS strip silicon detectors

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder18 Module Testing Results 18 prototype modules constructed at FNAL  Used in rod prototypes and beam tests  All of extremely good quality 8 production modules have been constructed and tested at FNAL  All of extremely good quality –0.4% bad channel creation during early production 8 production module have been constructed and tested at UCSB  All of extremely good quality –0.5% bad channel creation during early production Last 4 modules had no bad channels introduced –3 damaged due to wire bonding mistake in the HV bias return line which will not be repeated Leads to high bias current (  A) Will be used in cross calibration of all test stands

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder19 Module Burn-in Status Both Vienna boxes used for module burn-in arrived at UCSB  LV distribution + HV controllers ready  Demonstrated basic functionality  Software currently does not have capability for multi-module tests –Patrick Gartung (UCR) and UIC grad student (as of June) are actively working to improve software Once failure rates (if any) established, may be able to sample test

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder20 Rod Assembly Testing Actively working to finalize rod assembly hardware  Versions of rod assembly rotation table, rod handling tool and all other tools should be shipped to UCSB soon Assembling single rod testing hardware  Commitment from CERN delivery of LV PS and DAQ componentsDAQ components  CAEN HV PC controllers ordered Arrival times of assembly hardware and single rod testing hardware (2-3 months) match production schedule

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder21 Rod Burn-in Test Facility (UR Group) Peak production at FNAL/UCSB will be at most 10 rods per week per site.  Each site will have capacity to burn-in 8 rods at one time. –50% contigency  Currently plan 72 hour burn-in cycle –Should be able to reduce to 48 hours, if necessary  Each system to include… –Cold box –Chiller –PC/DAQ system for chiller and flow control –2nd PC for CMS DAQ system –LV Power supplies provided by CERN –HV Power supplies loaned from ‘CERN Prep’

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder22 Rod Burn-in Stand Status Purchased a chest freezer and low temp chiller  Time from 20C to –25C is ~1.5 hours. Chiller DAQ system  Flow, temperature control and dew point interlocks have been specified and quoted. –Low noise equipment similar to CDF Rod DAQ system  Commitments for DAQ components made –Scheduled to be delivered in time for use  Multi-rod software under-development –Group’s involvement in multi-module software should speed finalization of software

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder23 Current Estimated Testing Through-put Hybrid Arrival Testing  24 hybrids per day at UCSB  Matches peak production (+ contingency)  Requires dedicated tech Hybrid Thermal Cycling  Most components missing  Construction should finish in-time for need (late summer)  Test stand will be able to match production rate Module Basic Test  2 ARC LED stands at both sites  12 modules per day  Matches peak production (+ contingency)  Requires dedicated tech Module Burn-in (Vienna Box)  Lack of hybrid-to-utri adapters limits testing through-put to 1 –Should receive more in next few weeks  Current software can only test 1 module at a time Rod Assembly Testing  Most hardware not delivered yet –Currently cannot test any rods –Will be able to match production rate with full compliment of equipment Rod Burn-in will start in fall

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder24 Summary Production ramp up at FNAL/UCSB has begun  Current hardware/software meet hybrid/module testing needs –Multi-module burn-in software needed in near future Group actively working on software  We have developed testing protocols to decisively find/diagnose all problem channels  Extremely high quality modules have been made so far –<0.5% bad channels introduced per module We will need more test equipment to achieve peak rate  Commitments made to deliver equipment in time Rod assembly and test stands under development  Equipment specified and ordered Rod burn-in infrastructure to be ready in early summer  Rod DAQ electronics and software will be ready Group’s work on multi-module burn-in software will speed up software development

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder25 Back-up Slides

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder26 Tracker/DAQ Readout System Front End Drivers (FED) digitize the data Front End Controller (FEC) distributes clock and trigger signals to the front end and sets and monitors all APV parameters TSC Trigger Sequencer Controller (TSC) generates trigger signals corresponding to a L1 Trigger Communications and Control Unit (CCU) provides slow control Return

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder27 Testing Model (1) (03/01/29) Hybrids  Shipped to UCSB –Visual Inspection –Simple functionality test –Wire bond pitch adaptors –Thermal cycle with continuous ARC test and pitch adaptor pulsing  Distributed among FNAL and UCSB for production –FNAL to repeat simple functionality test for finding transport damage Modules  Fast test with ARC/LED –Simple repairs (e.g. pull wirebonds on any newly developed pinholes)  Overnight “burn-in” of modules with Vienna box (sample unless necessary to do all)  Final pinhole check with ARC/LED  Modules stored for later rod installation

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder28 Testing Model (2) (03/01/29) Rods at US Sites  Received and visually inspected  Modules mounted on rod –According to flavor (1 of 24) –All modules mounted (e.g. 6 at a time for SS rod) and tested  Capacity: 2 SS rods/day per site  LT Test –Up to 8 rods per site for up to 72 hours with 3 thermal cycles per day sampled data taking –Recalibrate optohybrid vs temp  Final test at US site

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder29 ARC Module Testing (3) Chip “feature” results in loss of entire chip due to saturation effects if few pinholes bonded LED pinhole test  Bonded multiple inherent pinholes on purpose  LED test always detects pinholes seen in sensor probing Pinhole Sensor flaws Pinholes are clearly identified 

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder30 Rod Assembly Testing (2) PC boards  Now need 5 PCI slot + 1 ISA slot +ethernet + COM port + LV DI/O card (if necessary) –Neither site has such a computer  1 TSC  2 FED  2 OEC –Allows for SS4 rods only  2 DI/O cards

US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder31 Rod Assembly Testing (3) To get first site read-out rods need the following hardwareTo get first site read-out rods need the following hardware  1 LV PS  1 A1303 CAEN controller  1 PC (5 PCI + 1 ISA + ethernet + 1 com + LV DI/O (maybe))  2 Electrometers  1 DI/O card  1 OEC LV PS, A1303, and electrometers all may be long lead time items (2-3 months)