PALM-3000 HOWFS - 7/24/09 C. Baranec. PALM-3000 Current Status Summary 2 Telescope simulator assembled HOWFS assembled and tested Alignment plan (CIN.

Slides:



Advertisements
Similar presentations
W Unit Opto-Mechanical Acceptance Test Specifications A.Tozzi, E.Pinna, S.Esposito FLAO system external review, Florence, 30/31 March 2009 FLAO_03 (CAN:
Advertisements

PRESENTATION TO THE JOINT RULES COMMITTEE 15 MARCH 2012 ON THE PROGRESS ON IMPLEMENTATION OF THE INDEPENDENT ASSESSMENT PANEL ADOPTED RECOMMENDATIONS ADOPTED.
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Telescope Tear-Down Anatomy of a 114mm f/8 Newtonian Reflector.
Pore Detection in Small Diameter Bores The University of Michigan, Ann Arbor NSF Engineering Research Center for Reconfigurable Manufacturing Systems.
Laser guide star adaptive optics at the Keck Observatory Adam R. Contos, Peter L. Wizinowich, Scott K. Hartman, David Le Mignant, Christopher R. Neyman,
LIGO-G9900XX-00-M adLIGO R&D1 AdLIGO Bench Testing of Proposed Quad Alignment & Gap Setting Hardware (Keyence)T Two SOS optics were used to represent.
PALM-3000 Status of the PALM-3000 high-order adaptive optics system A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss, J.R. Crepp,
LBT AGW units Design Review Mar.2001 General Concept Performance specifications and goals The off-axis unit The mechanical support structure The control.
PALM-3000 HOWFS - 2/20/09 C. Baranec. PALM-3000 HOWFS Current optical testing Review of Feb 8 th HOWFS update Detailed future tasks 2.
CAVIAR – Continuum Absorption by Visible and Infrared Radiation and its Atmospheric Relevance How on schedule are we? Keith Shine Department of Meteorology,
Geoff Pile FAC Review - Undulator 12 November 2008 LCLS Undulator System Overview and Fabrication Geoff Pile.
NGAO 1-tier Draft Optical Relay Design P. Wizinowich 12/7/07.
PALM-3000 HOWFS - 5/29/09 C. Baranec. PALM-3000 HOWFS tasks in preparation for testbed work CCD50 readout modes – defined, awaiting quote. Test the camera.
PALM PALM-3000 project status 31 Jan COO All-Hands Mtg. Recent Milestones Requirements review on 12 Nov AO system offline for maintenance.
INDUSTRIAL & SYSTEMS ENGINEERING
POLY-SEAL CORPERATION February 15, Project Management n Provides an organization powerful tools to improve the organization’s ability to plan, organize,
PALM-3000 HOWFS Design Update 2/27/08 C. Baranec Pasadena, CA February 27 th 2008.
PALM-3000 Integration and Testing Status A. Bouchez Team Meeting #15 10/29/2009.
PALM-3000 PALM-3000 Status and the 3388-actuator Xinetics Deformable Mirror A.H. Bouchez, R.G. Dekany, J.R. Angione, C. Baranec, K. Bui, R.S. Burruss,
PALM-3000 PALM-3000 Instrument Architecture Antonin Bouchez PALM-3000 Requirements Review November 12, 2007.
PALM-3000 PALM-3000 Status A.H. Bouchez, J.E. Roberts Project 1640 Las Vegas Summit 1/28/2010.
PALM-3000 P3K Stimulus Design Update Rick Burruss P3K Team Meeting #7 February 27, 2008.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
PALM-3000 Optical Bench Update Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss Team Meeting #15 10/29/2009.
PALM-3000 High-order Wavefront Sensor Update Christoph Baranec Team Meeting #9 10/22/2008.
PALM-3000 Team Meeting #15 – Wavefront Sensor(s) C. Baranec October 29 th 2009.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
HARPS-NEF PDR December 6 & 7, HARPS-NEF Program Project Manager Tim Norton.
PALM-3000 PALM3000 Realignment Winter Jenny Roberts Optical Bench Team: C. Baranec, A. Bouchez, K. Bui, R. Burruss, R. Dekany, M. Troy Layout.
PALM-3000 Systems Engineering R. Dekany, A. Bouchez 9/22/10 Integration & Testing Review.
PALM-3000 Budget and Schedule Update A. Bouchez, J. Roberts Team Meeting #10 1/8/2009.
1 Aurélien Barrau LPSC-Grenoble (CNRS / UJF) A few words on the LPSC The LPSC in few words: The scientific environment : Grenoble 4 Universities.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
Introduction SAP Manufacturing Execution (ME) Dr. Djamal Ziani King Saud University.
MCAO Adaptive Optics Module Mechanical Design Eric James.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
PACS IIDR 01/02 Mar 2001 FPFPU Alignment1 D. Kampf KAYSER-THREDE.
LBT Q Engineering Review TAL Telescope Alignment.
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Understanding typical users for this instrument Graduate studentGraduate student –not an X-ray expert but wants to make a spatially resolved measurement;
1 Palomar Tomograph V. Velur 1, B. Platt 2, M. Britton 1, R. Dekany 1 1 Caltech Optical Observatories, California Institute of Technology 2 Interferometry.
2006 CMBG Conference Sam Melton Supervisor, Configuration Management Brunswick Nuclear Plant Progress Energy June 11-14, 2006 Richmond, VA CM04 Facility.
Telescope Integration and Tests Tuesday Afternoon.
Multiplexed High Res Spectroscopy at Keck – J. Cohen (PI), H. Epps (Optical Design), M. Rich (Project Scientist) Keck instruments for optical spectroscopy.
OC, June 3, SAM – SOAR Adaptive Module Andrei Tokovinin Nicole van der Bliek.
FLAO system test plan in solar tower S. Esposito, G. Brusa, L. Busoni FLAO system external review, Florence, 30/31 March 2009.
I NTRO TO PO10029: C ONTROL E NHANCEMENTS FOR A IR M USCLE B IOMIMETIC H AND Dr. Kathleen Lamkin-Kennard Sept. 14, 2009.
VectorCSP. Questions How many people in here manage assets? How many of you know the condition of those assets? How long until the next calendar or hourly.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
HAM-SAS fabrication weekly CALTECH, 4/26/06 V. Boschi, V. Sannibale HAM-SAS Mechanical Model Present Status.
Project Management Inspections and Reviews 1 February.
Mount structure concept FM1 & FM2 Mount structure design 1) Aluminum structure. 2) Structure design for holding Newport mirror mount because of its compact.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
IFS prototype – PM3 LAM, 13/06/2003 Prototype testing at CRAL Tests at room temperature in the visible.
CTF3 Streak Camera Results and Improvements Aurélie Rabiller BE-BI-PM
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
CLIC Permanent Magnet Quadrupole Engineering Development update Norbert Collomb, STFC Daresbury Laboratory 1N. Collomb 03/10/2011.
Javier Castillo3rd LHC Alignment Workshop - CERN - 15/06/ Status of the ALICE MUON Spectrometer Alignment Strategies & Results from Cosmic run Javier.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Date of download: 6/2/2016 Copyright © 2016 SPIE. All rights reserved. View of the XMM-Newton spacecraft subsystems, with external shrouds and structure.
Equipment Safety Buy-off g-Comply Tool Power On Ready In Full Production Mode Deliver and set in place Turnover to Production Power On Time Ready Usage.
Development of a pellet tracking system for PANDA and WASA Goal:  know interaction point with a few 100  m accuracy in 3d(xyz). Method: Track pellets.
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
COSMOS Status David Sprayberry, Sean Points & Jay Elias
Engineering Design Process
Presentation transcript:

PALM-3000 HOWFS - 7/24/09 C. Baranec

PALM-3000 Current Status Summary 2 Telescope simulator assembled HOWFS assembled and tested Alignment plan (CIN 636) is halfway finished Alignment feedback GUI developed and tested

PALM-3000 Telescope Simulator 3 On-axis green laser Red laser fiber source On x-y-z translation stage F/# ~15.7 (needs to be confirmed)

PALM-3000 HOWFS Mechanical 4 Pieces needed for WFS fabricated and assembled. Alignment feedback GUI developed and tested.

PALM-3000 Alignment feedback GUI 5

PALM-3000 s16 6

PALM-3000 s32 7

PALM-3000 s64 8

PALM-3000 Demo… Switch to remote desktop 9

PALM-3000 Analysis/Discussion Pupil ellipticity at 2.0% (1.70% desired for AOI of 10.5) –There are degrees of freedom to change the ellipticity Pupil size at mm (9.600 target) We need to establish exact pupil sizes in the different modes before specifying collimator Different focus measurement in different modes –Many possible contributors, will require investigation CCD50 focus positions not yet established –Will require use of Pixelink camera 10

PALM-3000 Flexure analysis Flexure – ATS150 roll compliance is excellent. Still awaiting pitch compliance. Expect 0.1”/hour. Khanh’s description of flexure analysis however is confusing. What priority should we place on having him document this properly? 11

PALM-3000 Outstanding tasks - summary CCD50 readout modes – awaiting SciMeasure. Test the camera modes – RN/DC (JR, ? days) Finish alignment plan - (CB, 1 day) Further alignment investigation – (CB, 1 day) Amendments to alignment procedure – (CB, 1 day) Internal flexure testing – (CB, 1 day) Spec new optics – (CB, ½ day) Alignment with the testbed – (CB, 2 days) Plan for testing and incorporating new optics – (CB, 1 day) Mechanical… 12

PALM-3000 Mechanical Engineering Update 13 Task #PriorityDescriptionStatus 1CCD50 coverIn shop 2HOWFS coverConceptual, in solidworks 3Field stop with ACam mirrorFab. drawings 4ACam optics mountsConceptual, in solidworks 5ACam camera mountConceptual, in solidworks Khahn expects to be finished working on the HOWFS/Acam by end of next week.

PALM-3000 Schedule Mechanical finished – next few weeks SciMeasure modes - ? Integration with testbed (no DM) – 3-4 weeks Order testbed collimator/cylinder – after F/# established Integration with DM in testbed – 6-10 weeks Integration on PALM-AO bench – next year 14

PALM-3000 Management Summary Total labor: CB – ~8 days JR – CCD testing modes, integration ME – 1 week from Khanh Bui AB – integration Equipment costs: SciMeasure camera modes - ? New optics (col, cyl) ~ $