2/28/2006CAPSTONE Spring '06 CDR1 Team Cornerstone Michael Brogdon Enrique Conde Chad Gill Doug Schuyler.

Slides:



Advertisements
Similar presentations
INDIVIDUAL PROJECT BY R.KARTHIKMANOJ
Advertisements

1 iHome Automation System Home Automation System Team: Million Dollar Contingency Regiment Adam Doehling Chris Manning Ryan Patterson.
LOGO Lab Supervisor – Dr. WH Lau EE3271 Design Laboratory.
DARSI 2 CDR Adrienne Baile Preston Schipper Matt Hulse Project Overview Components: Design Status Administrative Data Acquisition & Real-time System Integration.
Electronic Guidance Device(EGD) Group Members Stephen Harris Abdul-Karim Al-Shanfari Bradley Smethie Robert Bornhijm.
LOGSYS Development Environment of Embedded Systems Tamás Raikovich Béla Fehér Péter Laczkó Budapest University of Technology and Economics Department of.
Team Impact Intelligent Helmet Impact System Critical Design Review February 28 th, 2008 Amanda Brodbeck Wei-Chu Liao Wei-Shen Liao Chris Mintle.
Track Timer Final Semester Presentation Senior Design I April 19, 2011.
Department of Electrical and Computer Engineering MDR Presentation Team Frij.
Capstone Fall 2005 GFX-One Guitar Processor Team Carpal Tunnel September 8, 2005.
March 1, Mobile Fidelity Souhaibe Barkat Tenzin Dhongyal Michael Duckwitz Matthew Syme Patrick Wagner Critical Design Review Spring 2007.
Virtual Wallet Gates Winkler Yin Shen Jordan Samuel Fei /23/2009 A handheld device that saves time and money through smart budget management and.
Globex Proprietary Competition Sensitive Ubiquitous - MP3 Player Ian BrattJohn Pratt Eric LeeWei-Shin Wang David Lindstone ECEN 4573 Capstone Lab Spring.
A.R. Hertneky J.W. O’Brien J.T. Shin C.S. Wessels Laser Controller One (LC1)
Critical Design Review VST Vigilant Sensing Technologies Joel Keesecker, Mark Kien, Pat Hauser.
Biometric Security System Capstone Project CDR Mat Merkow Tung Nguyen Dipesh Shakya.
Ping Project Justin Knowles Kurt Lorhammer Brian Smith Andrew Tank ECEN 4610.
1 iHome Automation System Home Automation System Team: Million Dollar Contingency Regiment Adam Doehling Chris Manning Ryan Patterson.
A simpler way to shop!. Tuesday, January 31 st 2oo6 Capstone, Spring 2oo6 The system is made up of three different modules: Product Two different types.
Team Impact Intelligent Helmet Impact System Preliminary Design Review January 29 th, 2008 Amanda Brodbeck Wei-Chu Liao Wei-Shen Liao Chris Mintle.
PV Watchdog Web-Enabled Photovoltaic System Monitor Art Barnes Austin Fisher Ryan Mann Josh Stone.
Preliminary Design Review Jan 31, 2006 Brianna Bethel Robert Havlik Jessica Lowry Alex Silva.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
Team Monte Cristo Joseph Carrafa Sharon Clark Scott Hassett Alex Mason The Deep Fried Game Station.
Preliminary Design Report GPS Location System. Introduction GPS COMM Group Team Members Adam Preeo Adrian Migacz Andy Merritt Taylor Hughes.
Globex Proprietary Competition Sensitive Ubiquitous - MP3 Player Ian BrattJohn Pratt Eric LeeWei-Shin Wang David Lindstone ECEN 4573 Capstone Lab Spring.
Jeff Burch Simon Dakermanjian Mazen Arakji Jonah Kadish Derek Smith
Coordinate Based Tracking System
(Voice Activated Home Control System). Project Summary Control any IR activated device –Via voice command Learnable –Learn IR Code –Learn Voice Command.
Department of Electrical & Computer Engineering Preliminary Design Review Team: Lucas Root Telin Kim Brandon Thorpe Michael Shusta Advisor: Professor Tessier.
Electronic Guidance Device(EGD) Group Members Stephen Harris Abdul-Karim Al-Shanfari Bradley Smethie Robert Bornhijm.
PDR- Digital Audio Recorder/Player Brian Cowdrey Mike Ingoldby Gaurav Raje Jeff Swetnam.
Aztec PC Oscilloscope Michael Mason Jed Brown Josh Price Andrew Youngs.
ASPPRATECH.
1. S U I I T PROJECT PRESENTATION: Sambalpur University Institute of Information Technology.
Critical Design Review February 23 rd, 2010 Hassan Alabudib Kamal Sabi Peng Chen Marisol Lozano Roman Yirui Huang.
Watt Watch Hassan Alabudib Yirui Huang Peng Chen Kamal Sabi Marisol Lozano Roman.
ET3100 BioFlex TimeClock. What is fingerprint scanning?  It is a pattern acquisition and recognition established on a person’s.
SmartCart The Interactive Shopping Cart Display UCSB ECE 189A/B, Fall 2012 – Spring 2013 Pallavi Jain Deniz Kaplan Peter Nguyen Vivian Vasquez.
Critical Design Review 27 February 2007 Black Box Car System (BBCS) ctrl + z: Benjamin Baker, Lisa Furnish, Chris Klepac, Benjamin Mauser, Zachary Miers.
Brought to you by: Smooth Operation Chris Kitt, Brenda Marcum, Jacob Oliver, Michael Roth, and Andrew Yuan.
ECE 477 Design Review – Spring 2010 Team 15. Team Members.
Virtual Wallet Gates Winkler Yin Shen Jordan Fei Project Manager: Prajna Shetty /02/2009 A handheld device that saves time and money through smart.
Multimedia & Communications ATMEL Bluetooth Background information on Bluetooth technology ATMEL implementation of Bluetooth spec.
Embedded Bluetooth Stack Dean Camera Project Supervisor: John Devlin.
Flatiron Mobile Device Security Monitor Thomas Horacek Lucas Greve.
IntelliCart TM Automated Shopping and Checkout System IntelliCart TM Automated Shopping and Checkout System Peter Dao, Joseph Esler, Brett Halper, Jason.
IntelliCart TM Automated Shopping and Checkout System IntelliCart TM Automated Shopping and Checkout System Peter Dao, Joseph Esler, Brett Halper, Jason.
ECE 477 Design Review Team 09  Spring 2010 Luke Ethan Andy Dhruv.
Zach Molden Shamlan Al-Roomi NJ Purevsuren Raied Farash Aadiel Rizvi C ritical D esign R eview.
CDR- Digital Audio Recorder/Player Brian Cowdrey Mike Ingoldby Gaurav Raje Jeff Swetnam.
Bonitron A\C Demand Scheduler Alex Brown Cory Haugh Ajmer Dwivedi.
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
Department of Electronic & Electrical Engineering LCD character display (parallel interface). How to interface a LCD character display to a PIC.
RFID Access Control System Lucius Knight. General System Design  Microcontroller  PSoC CY8C29466  24MHz Bus Frequency  Memory Available  32kB FLASH.
Eric Glover Steve Andre Shaun Greene Russell Willmot.
SUBMITTED BY EDGEFX TEAM PORTABLE CODED WIRELESS MESSAGE COMMUNICATION BETWEEN TWO PARTIES SECRETLY WITH LCD DISPLAY.
Modular Swimming Pace Aid ECE 445 Group Members: Igor Fedorov, Ryan Cook, Michael Chan Professor Carney (TA Ryan May)
Lets Learn fundamentals !!
<Add team picture or relevant project picture here>
Arduino BASED RFID Device Access
DIGITAL CALCULATOR USING 8051
RAILWAY TRACK SNAP NOTIFICATION
Introduction to Microprocessors and Microcontrollers
Future Designs, Inc. Your Development Partner
ECE 477 Design Review Group 3  Fall 2005
Project Forget-Me-Not
Keypad Source: under under
Keypad Source: under under
♪ Embedded System Design: Synthesizing Music Using Programmable Logic
Presentation transcript:

2/28/2006CAPSTONE Spring '06 CDR1 Team Cornerstone Michael Brogdon Enrique Conde Chad Gill Doug Schuyler

2/28/2006CAPSTONE Spring '06 CDR2 Project Description The system is made up of three different modules: Product Two different types of identification Passive RF ID Bar Code Shopping Cart Computing system for product identification and real time price update LCD, displaying product description and total price RF link to communicate with checkout counter Checkout Counter RF link to communicate with shopping cart Product Database

2/28/2006CAPSTONE Spring '06 CDR3 Purpose Facilitate people’s shopping Real time price update Audible (multilanguage) description (price, product name, etc.) Eliminate long/tedious lines Uploading final price to checkout counter, so that customer only needs to pay (no need to scan everything) Possible extension Advertisement opportunities Multilanguage Display

2/28/2006CAPSTONE Spring '06 CDR4 Shopping Cart Diagram

2/28/2006CAPSTONE Spring '06 CDR5 Checkout Counter Diagram

2/28/2006CAPSTONE Spring '06 CDR6

2/28/2006CAPSTONE Spring '06 CDR7

2/28/2006CAPSTONE Spring '06 CDR8

2/28/2006CAPSTONE Spring '06 CDR9

2/28/2006CAPSTONE Spring '06 CDR10 Timing Diagram HC12

2/28/2006CAPSTONE Spring '06 CDR11 Timing out of CPLD

2/28/2006CAPSTONE Spring '06 CDR12 Software Interrupt Handlers – Reads Ports PK0-PK2 for interrupt vector address – Buffers data from data bus. – Asserts line connected to port PK3 when completed Display – Input: Pointer to Character data – Output: Character display to LCD Audio – Input: Address to Sound Sequence – Output: Address on data bus to Digitalker

2/28/2006CAPSTONE Spring '06 CDR13 Software Transmit – Input: Pointer to Data to send – Output: Data on SPI bus to RF link. Receive – Input: Data from RF link on SPI bus – Output: Data to buffer Idle – Input: N/A – Output: N/A

2/28/2006CAPSTONE Spring '06 CDR14 Parts List 3 HC12 family Micro controllers. (Obtained) 2 LCD’s (Obtained) 1 Keypad (Obtained) 2 Proto-boards (Obtained) 4 32Kx8 bit SRAM (Obtained) 4 512Kx8 bit Flash Memory (Obtained) 2 RF Transmitters (Obtained) 2 RF Receivers (Obtained)

2/28/2006CAPSTONE Spring '06 CDR15 Parts List continued 1 44-pin Xilinx CPLD XC9536 (Obtained) 1 84-pin Xilinx CPLD XC95108 (Obtained) 1 Digit-talker kit (Obtained) Multiple Miscellaneous CMOS IC’s (Obtained) Miscellaneous Power Supply parts (Obtained)

2/28/2006CAPSTONE Spring '06 CDR16 Parts List continued 1 RFID Reader/Writer (Not obtained yet) 5 RFID Tags (Not obtained yet) 1 12-Volt battery (Not obtained yet)

2/28/2006CAPSTONE Spring '06 CDR17 Schedule CDR Have every part we need ordered or received (Completed) Startup Code for Microcontrollers (Completed) Product ID with Bar code complete (Completed) LCD test code (Completed) Keypad test code (Completed) Bar code test code (Completed) Audio test code (Completed) Initial design of PCB completed and start manufacturing (Design and proto-board completed)

2/28/2006CAPSTONE Spring '06 CDR18 Schedule Continued Milestone I Shopping cart (itself) complete Revision of PCB design Product RF ID complete Partial Integration Communication links up and running Hardware Drivers ready

2/28/2006CAPSTONE Spring '06 CDR19 Schedule Continued Milestone II Final PCBs complete with parts installed Shopping Cart complete with wiring and power supply Checkout complete Final testing and debug begins

2/28/2006CAPSTONE Spring '06 CDR20

2/28/2006CAPSTONE Spring '06 CDR21 Labor and Responsibilities Michael Brogdon: Firmware and Software Development Enrique Conde: Firmware and Software Development Chad Gill: Hardware layout and design Douglas Schuyler: Hardware layout and design, cart design