LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005.

Slides:



Advertisements
Similar presentations
Ideas and Speculations for the Headon Extraction Line L. Keller Oct. 19, Give up the 3.5 m Separation between the Charged Dump and the Incoming.
Advertisements

EXTRACTION BEAM LOSS AT 1 TEV CM WITH TDR PARAMETERS Y. Nosochkov, G. White August 25, 2014.
Overview of Beam Delivery System Final Focus Optics Collimator Final Doublet Extraction/Dump Others S.Kuroda ( KEK ) MDI meeting at SLAC 1/6/2005.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Stanford – Mar , 2005 LCWS-2005 Norbert Meyners Upstream Polarimetry with 4-Magnet Chicane 1 Introduction & Overview O Compton polarimetry basics.
NLC - The Next Linear Collider Project  IR background issues and plans for Snowmass Jeff Gronberg/LLNL Linear Collider Workshop October 25, 2000.
NLC - The Next Linear Collider Project NLC IP Layout What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
NLC - The Next Linear Collider Project NLC IR Layout and Background Estimates Jeff Gronberg/LLNL For the Beam Delivery Group LCWS - October 25, 2000.
IPBI 6 April 05Ken Moffeit Polarimetry Design Updates - Dispersion in upstream chicane - 20mrad extraction line 0.75 mrad beam stay clear location of Synchrotron.
27 June 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit ILC BDS 27 June 06.
K. Moffeit 6 Jan 2005 WORKSHOP Machine-Detector Interface at the International Linear Collider SLAC January 6-8, 2005 Polarimetry at the ILC Design issues.
CF Constraints to the Strawman BDIR Configuration Tom Markiewicz SLAC 07 January 2005 IR Hall Muon Wall Beam Dump Detector Photon Dump 4m tunnel with “Y”
NLC - The Next Linear Collider Project Backgrounds Update Tom Markiewicz SLAC LCWS Cornell 15 July 2003.
A.Seryi, Oct. 26, BDS comparison and positron source A.Seryi October 26, 2005 Discussion of BDS and positron source is given in [1] “Comment on.
NLC - The Next Linear Collider Project IR Working Group Summary Tom Markiewicz LC R&D Workshop, UCSC June 29, 2002.
Background comparison between 20 mrad and 2 mr crossings Takashi Maruyama SLAC Machine-Detector Interface Workshop SLAC January 6-8, 2005.
20 March 2005Ken Moffeit LCWS1 Highlights from the MDI workshop Spin Rotation System for 2 IR’s Downstream polarimetry Ken Moffeit.
A.Seryi, Nov 22, 2005, slide 1 Evaluation of Aug9 2mrad Use 2mrad extraction, version Aug 9, Use high.
Status of ongoing studies for comparing 2-mrad and 20-mrad IRs T. Maruyama SLAC.
IR Beamline and Sync Radiation Takashi Maruyama. Collimation No beam loss within 400 m of IP Muon background can be acceptable. No sync radiations directly.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
ILC Beam Delivery System Layout and Lattice Design Deepa Angal-Kalinin ASTeC, Cockcroft Institute Cockcroft Institute SAC th November 2006.
NLC - The Next Linear Collider Project NLC Backgrounds What’s New? Tom Markiewicz LC’99, Frascati, Italy October 1999.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
Overview of Extraction Line Designs and Issues
ILC BCD Crossing Angle Issues G. A. Blair Royal Holloway Univ. London ECFA ILC Workshop, Vienna 14 th November 2005 Introduction BCD Crossing Angle Rankings.
October 31, BDS Group1 ILC Beam Delivery System “Hybrid” Layout 2006e Release Preliminary M. Woodley.
January 10, 2007M. Woodley (SLAC)1 ILC Beam Delivery System “Interim Working Assumption” 2006e Release European LC Workshop, January , Daresbury.
Re-evaluating the Need for a anti-DID in SiD T. Markiewicz/SLAC SiD Optimization Meeting
Backgrounds in the NLC BDS ISG9 December 10 – Takashi Maruyama SLAC.
Analysis of Beamstrahlung Pairs ECFA Workshop Vienna, November 14-17, 2005 Christian Grah.
LDC Meeting Vienna 17. November 2005 Karsten Büßer LDC Machine Detector Interface Update.
11th December 2007 LET workshop, SLAC 1 Beam dynamics issues in Beam Delivery System Deepa Angal-Kalinin ASTeC, Daresbury Laboratory.
19 July 2006Ken Moffeit1 Comparison of 2mrad and 14/20 mrad extraction lines Ken Moffeit (via Eric Torrence) VLCW06 19 July 06.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
Interaction Region Issues and Beam Delivery R&D Issues & IR Design Status R&D Plans T. Markiewicz Klaisner Review 4/15/1999.
NLC - The Next Linear Collider Project IR Geometries & Constraints on Forward Detectors Tom Markiewicz SLAC ALCPG SLAC 08 January 2004.
Design status 2 mrad IR Current plan for finalization in 2008 Philip Bambade LAL-Orsay On behalf of: D.Angal-Kalinin, R.Appleby, F.Jackson, D.Toprek (Cockcroft)
GDE questions, including one or two IRs Grahame Blair, Tomo Sanuki, Andrei Seryi for WG4 Snowmass, CO, August 25, 2005 Grahame Blair, Tomo Sanuki, Andrei.
Philip Burrows Snowmass 2005: SiD Concept Plenary, 15/8/05 SiD and MDI issues Philip Burrows Queen Mary, University of London Thanks to: Toshiaki Tauchi,
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
ILC-GDE Meeting Beijing Feb Effect of MDI Design on BDS Collimation Depth Frank Jackson ASTeC Daresbury Laboratory Cockcroft Institute.
ILC EXTRACTION LINE TRACKING Y. Nosochkov, E. Marin September 10, 2013.
Re-evaluating the Need for a anti-DID in SiD T. Markiewicz/SLAC SiD Optimization Meeting Updated
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
BDS Lattice Design : EDR plans GWP03 Meeting 04/12/2007.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
Beam Delivery (wg4) update since Snowmass Andrei Seryi for WG4 GDE meeting December 8, 2005 Snowmass 2005 GDE Meeting at INFN-LNF.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
1 O. Napoly ECFA-DESY Amsterdam, April 2003 Machine – Detector Interface : what is new since the TDR ? O. Napoly CEA/Saclay.
MAIN DUMP LINE: BEAM LOSS SIMULATIONS WITH THE TDR PARAMETERS Y. Nosochkov E. Marin, G. White (SLAC) LCWS14 Workshop, Belgrade, October 7, 2014.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
The design of the 2mrad extraction line Rob Appleby Daresbury Laboratory On behalf of the SLAC-BNL-UK-France task force ILC European Regional Meeting and.
FCC-ee Interaction Region design
Grahame Blair, Tomoyuki Sanuki, Andrei Seryi
M. Sullivan Apr 27, 2017 MDI meeting
Machine Detector Interface Design Updates
BDIR/MDI Summary ECFA Final Plenary
Beam Delivery update Andrei Seryi December 12, 2005
CLIC-ILC BDS & MDI work.
The small crossing angle layout - where are we and what do we do now?
ILC BDS Emittance Diagnostics: Design and Requirements
Updates on IR and FF for super-B factory
The 2mrad horizontal crossing angle IR layout for the ILC
Design status 2 mrad IR Current plan for finalization in 2008
Interaction Region Design Options e+e- Factories Workshop
Presentation transcript:

LCWS ’05 Machine Detector Interface Design Updates Tom Markiewicz SLAC 22 March 2005

Tom Markiewicz 2 / 20 ILC WG4 “Strawman” Layout of BDS with 20 mrad and 2 mrad IRs logically complete P P E EE E P P

Tom Markiewicz 3 / 20 Warm LC Collimation System Design Updated to Profit from Cold Bunch Structure: Expand Beam Size at Spoilers to Make them “Indestructible” ITRP NLC Betatron Collimation Lattice optimized for consumable spoilers: At max  x *  y =6E4 m 2 ILC Lattice (FF9): At max  x *  y =6E5 m 2 suitable for passive survival spoilers IP Halo Drozhdin

Tom Markiewicz 4 / 20 BD1 z=0 m BD m BD m BD4 z=50.6 m GeV K Moffeit 24 Nov 04 Cerenkov Detector 17 GeV 25 GeV 250 GeV 35 GeV 2.5 cm Wide Plan View Pre-IP Chicane-based Polarimeter Requires ~50 meters length Same B-field at Z-pole, 250 GeV and 500 GeV running Same magnet design as for upstream energy chicane Good acceptance of Compton Spectrum at all energies without changing laser wavelength Upgrade to TESLA Design: Minimal space and no special magnets required Model studies based innovative moveable laser beam, detailed vacuum chamber & detector design ongoing (Meyners)

Tom Markiewicz 5 / 20 Pre-IP Energy Spectrometer Developed energy spectrometer chicane ΔX = 5 mm (on-energy) <2004 Concept Hildreth

Tom Markiewicz 6 / 20 Detailed Layout of Energy & Polarimeter Chicanes in 20mrad Extraction Line “Concept” Developed Moffeit

Tom Markiewicz 7 / 20 Electron/Positron Spin Rotation for 2-IRs Moffeit

Tom Markiewicz 8 / 20 Final Doublet Magnet Design 2004 SC QD0 Design Single-strand at r=10mm 7-strand at r=20mm Successful tests of winding 7-wire cable at 10mm radius beampipe & Use of SF (1.9°K) He-II Lead to MORE COMPACT COIL CONFIGURATIONS and open up NEW design options New 20 mrad X-ang design has QD0 AND 1 st Extraction Quad at same L* in separate cryostats B. Parker Ultra-Compact Design w/ Radial Taper in 3 z-steps

Tom Markiewicz 9 / 20  accommodated within 20 mrad Straw-Man Configuration Discussions on Merits/Risks of 25mrad continue B. Parker COILS at IP Side of QD0 at z=3.8m 76mm beam separation at 20 mrad 76mm = ±10mrad around extraction line Outer Quad and Dipole Zero By at both +10mrad and -10mrad

Tom Markiewicz 10 / 20 Anti-solenoids Reminder: A. Seryi & Y. Nosochkov showed (PRSTAB 8, (2005)) If QD0 sits in Fringe of Detector Solenoid  y (Solenoid) /  y (0) ~ Independent of crossing angle 456mm 316mm 70mm cryostat 1.7m long 15T Force Four 24cm individual powered 6mm coils, 1.22m total length, r min =19cm  y (Solenoid) /  y (0) ~ 1.4

Tom Markiewicz 11 / 20 VXD / Beam Pipe Tweaked for SiD Pair region plotted for NLC IP Parameters 5 Tesla, 20 mrad Pair region plotted for ILC Nominal IP Parameters 5 Tesla, 20 mrad New SiD VXD with 12mm radius beampipe Old SiD VXD with 10 mm radius beampipe Maruyama

Tom Markiewicz 12 / 20 Excerpt from ILC-WG1 Parameter Tables Nominal to High Lum Sets 500 GeV 11.3 MW NominalHighLum Lum2.0E384.9E38 dB2.2%7% Ng Upsilon P-g250kW790kW 1 TeV 18.1MW NominalHighLum Lum2.8E387.9E38 dB5.0%18% Ng Upsilon P-g900kW3.2MW Also, variation and duty factor of divergence angles, photon power, etc. as beams move into and out of collision (study loss as a function of dy)

Tom Markiewicz 13 / mrad Extraction Line Modified for Magnet developments, Newest IP Parameters & Double Chicane Y. Nosochkov L*=3.51 m for 1st quad in the incoming and extraction lines 1.75 m free space to fit crab cavity on incoming line Larger magnet apertures

Tom Markiewicz 14 / 20 Particle Loss in 20 mrad Extraction Line E cm (GeV) Params  y (nm) Max e x’/y’(urad) Max g x’/y’(urad) Emin/ E0 Power loss F-D / D-F 500Nom.0530/250370/ /0 500Nom /670370/ /1.4W 500High01270/430720/ /3.5 kW 500High / / /10 kW 1000Nom0500/160270/ /460 W 1000Nom100420/ /2.0 kW 1000High02010/490940/ / 49 kW 1000High801730/ / /274 kW Nosochkov

Tom Markiewicz 15 / 20 First Design of “Complete” 2mrad IP to Dump Extraction Line SLAC-BNL-UK-France Task Group QD0 SD0 QF1 SF1 QEXF1 BYCHIC Disrupted beam & Sync radiations Beamstrahlung Incoming beam 60 m Shared Large Aperture Magnets Current Sheet QuadSuper Septum Quad Warm Panofsky Quad

Tom Markiewicz 16 / 20 First Loss Studies in 2 mrad Crossing Extraction Line Magnets, Chicane, Optics to Chicane focus require optimization Collimators at 56m (1.3kW) / 84m (23kW) for low E tail of nom 250 GeV beam & cooling for SR on Beam pipe (z=30-60m, 5kW) need study Beam LossesQD0QEXF1 500, Nom., dy=0, dy=200nm GeV, High Lum, dy=0250W50W 500 GeV, High Lum, dy=0350W400W 1 TeV, Nom, dy=0, dy=100nm GeV Lattice 1 TeV Lattice

Tom Markiewicz 17 / 20 Zero mrad Crossing Angle Study RF Kicker Design and Extraction Line Analysis Iwashita Keller 500 Nom, dy=0080 kW Nom, dy=200nm 5 kw405 kW High dy=03 kW735 kW High Lum, dy=120nm 450 kW2.3 MW Utility of Kicker to clean up dark current bunches MPS Issues

Tom Markiewicz 18 / 20 Examples of Forward Detector Studies and Physics / Background Implications Lumi-Cal Mech. Design to insure Alignment accuracy (Lohmann) W-Diamond BeamCal Effect of L*, Crossing angle & aperture size on backgrounds, electron ID Buesser Mask Opening angle Radiative Return Measurement of E beam knowledge of detector L/R to <1E-4 (Moenig)

Tom Markiewicz 19 / 20 Tool Development: Background Studies MARS implementation for BDS: Activation, Shielding, Muons (Kostin) Forward LD Geometry in GEANT4 (Buesser) GEANT4 Based Beamline Simulation BDSIM with SR, muon, neutron production processes (Blair)

Tom Markiewicz 20 / 20 Concluding Remarks ILC-WG4 / WWS-MDI have been working at a furious pace since ITRP decision to understand enough detail of complete design to convert strawman to CDR baseline: Much communication ~2 months between design iterations at intl workshops June UK meeting, July Korea meeting, Snowmass, November Vienna ECFA Result is a design which, to first order, satisfies the concern of all players that we investigate layout parameter space fully Much work required to evaluate, understand and improve physics capability, performance flexibility and engineering requirements of each IR with each detector My apologies for concentrating on progress of IR layout without explicitly showing results of studies presented Opinions of the larger community, based on these studies, will be required before any baseline decision can be made

Tom Markiewicz 21 / 20 Interface to CF / Engineering Beginning Overall IR2 IR1