HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics.

Slides:



Advertisements
Similar presentations
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Advertisements

Software Quality Assurance Plan
More CMM Part Two : Details.
CPIS 357 Software Quality & Testing I.Rehab Bahaaddin Ashary Faculty of Computing and Information Technology Information Systems Department Fall 2010.
Centro Astronómico de Yebes Observatorio Astronómico Nacional HIFI CAY 15/04/03SRON (Groningen)1 First Stage Cryogenic IF Amplifier Carmen Diez.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Process Specification Guidelines FAA/NASA Workshop 6 August 2002.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
Computer Engineering 203 R Smith Requirements Management 6/ Requirements IEEE Standard Glossary A condition or capability needed by a user to solve.
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Chapter 11: Testing The dynamic verification of the behavior of a program on a finite set of test cases, suitable selected from the usually infinite execution.
Development and Quality Plans
Development plan and quality plan for your Project
BAE SYSTEMS Overview of Systems Engineering at BAE SYSTEMS & ALENIA MARCONI SYSTEMS 8/10/2015/MS By Leigh Watton Friday 27th July 2001.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Effective Methods for Software and Systems Integration
Introduction to ISO New and modified requirements.
INTEGRATION OF QA/ISM J. R. Yanek Chair, EFCOG ISM Working Group April 13, 2000.
PACS IBDR 27/28 Feb 2002 PACS CRE1 PACS CRE development Ybe Creten, Patrick Merken, Jan Putzeys, Vic Fonderie, Chris Van Hoof IMEC.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
From Research Prototype to Production
Software System Engineering: A tutorial
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
Identify steps for understanding and solving the
Product Development Chapter 6. Definitions needed: Verification: The process of evaluating compliance to regulations, standards, or specifications.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
Refined ECSS Software Process Model Elements SD-TN-AI-0570, Issue 5 APPENDIX D.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
Pre-Project Components
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
DPE CSSW Process Model Annex A WP-400 ECSS Case Study.
CEA-Grenoble / DSM / DRFMC / SBT / Lionel DUBAND - Instrument Baseline Design Review - PACS and SPIRE Cooler - Feb. 27/ SPIRE & PACS SORPTION COOLERS.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
ASPERA-3 Mar. 25, 01 Monthly Status Report ASPERA Monthly Status ReportMonthly 3_25/ Page 1 Monthly Status Report Report due 3/25/01 Schedule statused.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
Groningen, 1-2 February 2001 FPU Preliminary Design Review1 First Stage Cryogenic IF Amplifier Centro Astronómico de Yebes Observatorio Astronómico Nacional.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Leiden, 3 June 2002Consortium Meeting1 First Stage Cryogenic Amplifier IF1 Centro Astronómico de Yebes Observatorio Astronómico Nacional SPAIN.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Reliability Applied to KM3NET
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
A JSJ Business APQP/PSO. A JSJ Business Purpose: To understand key concepts of the GHSP APQP and PSO process by reviewing the.
SE513 Software Quality Assurance Lecture10: Documentation and Quality Records Control Galin, SQA from Theory to Education Limited.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
I. Preliminary Design Review 1. Product specification 2. Project scope 3. Technical approach/solution to the Design Problem 4. Working Schedule (Gantt.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
O. Kester, NuSTAR annual meeting, 27/02/2013
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Software and Systems Integration
Autotest – Calibrated Leak
Peer Review Agenda (Suggested).
Production & Maintenance
First Stage Cryogenic IF Amplifier
First Article Inspection
Chapter # 4 Development and Quality Plans
PSS verification and validation
DOE Review of the LCLS Project October 2006
DOE Review of the LCLS Project 7-9 February 2006
Presentation transcript:

HEB Mixers for Band 6 – CDR H. Merkel, S. Cherednichenko, P. Khosropanah, T. Ottosson, J. Baubert, E. Kollberg The Millimeter Wave Lab Dept. of Microelectronics

Introduction Deliverables: –2 CQM, –4 FM, –4 FS, Comments: –6 Low and 6 High built and integrated simultaneously –Massive Collaboration between JPL and Chalmers –6 High mixer qualified by similarity –All 6H documentation is (for the time being) generic

Collaboration JPL and Chalmers form a joint group to deliver mixers for 6L and 6H The mixer block will be a refined Chalmers design The HEB is a NbN HEB made at Chalmers Mixer blocks will be built at JPL All integration except the lens integration will be done at JPL Most qualification testing is done by JPL Acceptance testing is done by Chalmers

Collaboration 2 QMFM

Collaboration 3 Metric interface drawings + Documentation generated by JPL –Internal (nonmetric) drawings generated within JPL and will stay within JPL Hardware to be made by JPL –Process details stay within JPL, in case of reworking, process details may become interfaces and be transferred to Chalmers. Assembly at Chalmers Up to now: works extremely well

Requirements  Output power data on solid state LO –Solved for 6L, –News for 6H? –Expect measured data in

1: Requirements and Interfaces Specifications: –Ready to be signed The CDR Board Question List

The CDR Board Question List 1: Requirements+Interfaces Interfaces are frozen Environment definitions frozen Design currently updated to meet all critical points –Lens fixture solved –Board clamping solved –No alumina, more elastic TMM10A substrates

1: Requirements+Interfaces Experience with DM testing at SRON shows: –Common understanding of which parameters are important for HEB characterization is required –Rules how to handle HEB mixers (by SRON or ESA) must be elaborated The CDR Board Question List

Documentation Status for Band 6 The Millimeter Wave Lab Dept. of Microelectronics

Documentation Status BAready for sign-off Spec 6Lready for sign-off BA with JPLrequires SRON BA to be signed! Spec 6Hgeneric issue, PID –completed, drawings by JPL ready

Documentation Status DVMok Compliance matrix ok Failure modes/ single point failures: –More input needed if necessary and in which form to be documented (more details in a few minutes)

7: Documentation 1.Is all of the above (requirements, interfaces, design and performance, qualification, verification, AIT, business commitments, planning) adequately documented conform the HIFI CDR data-package definition document –Yes. and placed under Configuration Control –Yes The CDR Board Question List

More preemptive answers... The Millimeter Wave Lab Dept. of Microelectronics

2: QM/FM Detail Design and Performance FMECA –Loss of LO power, reduced critical current, reduced critical temperature of the HEB, changed IF amplifier impedance can partially be cured by different biasing regime –Failure of the ESD protection caps reduces protection but is not fatal to the device –All other failure modes are non recoverable Lens breaking, solder joints separate, cracks in PCB, electrical component failure, bond wire breaking The CDR Board Question List

2: QM/FM Detail Design and Performance External drawings are metric Assembly/Manufacturing drawings will be nonmetric [JPL requirement] Some details are currently under investigation together with JPL The CDR Board Question List

2: QM/FM Detail Design and Performance Detail design under completion –IF board redesign for improved filtering still under test –IF board RF properties ok now –Lens design [extension length] again in question, this does not affect qualification –Lens holder: positive feedback from JPL –TMMA10e simply screwed to mixer block

3: AIV /QA planning and Implementation AI Procedures are redefined to fit into the work package split Qual program for the block  JPL Acc. program for the block  Chalmers QA program for the mixer  Chalmers The CDR Board Question List

3: AIV /QA planning and Implementation 3.Have Test Plans and- (detail) Procedures been completed for all Functional-, Performance and Environmental tests. –yes GSE is improving, there are more resources now since two labs are involved –New vacuum chamber at Chalmers under construction The CDR Board Question List

4: Product Assurance 1.Is the definition and planning of the PA activities technically adequate and consistent. –Yes. 2.Has a state of implementation readiness for the post-CDR phase been achieved. –PA is running on the films and on the HEB. –PA for the mixer blocks is done by JPL The CDR Board Question List

Programmatics for Band 6 The Millimeter Wave Lab Dept. of Microelectronics

5: ”Programmatics” 1.Are all deliverables funded, –Yes has a supplier been identified and has the supplier accepted. –Yes [additional procurement loopholes thanks to JPL] 2.Does the planning include adequate margins for the following contingencies: Delays due to all critical items –There is no space for any delays Delays due to AIV contingencies –AIV works on the spot. Success-oriented design The CDR Board Question List

5: ”Programmatics” 3.Planning consistent. –Delivery dates are possible to be met in this constellation 4.Long Lead Items –How to deal with CPPA for the 6H parts? –Maximum possible involvement of CPPA even for 6H The CDR Board Question List

5: ”Programmatics” 5. Manpower/ Resources Planning –Group fusion yields sufficient manpower –No signed-off BA yet but it is ready for sign- off. The CDR Board Question List

5: ”Programmatics” 6.Is the Manufacturing Readiness for QM and FM (tooling, facilities) progressing consistent with the project planning –Yes. 7. Is the maturing of QM and FM Assembly and Integration preparations, -tooling, -support equipment and -facilities consistent with the project planning. –Yes. The CDR Board Question List

Planning Due to time pressure CQM/FM/FS programs run parallel No feedback between programs possible independently how they are laid out

Schedule See Jonathan’s nice Schedule OH

Personnel Same old stuff... –100% Sergey –50%Pourya –100% Therese –15%Erik –15%Gunnar –40% Harald –100%Vladimir

Open Issues for Band 6 The Millimeter Wave Lab Dept. of Microelectronics

Open Issue CPPA delivery dates

Open Issues KIP/MIP? –According to p-CDR not applicable –According to the CDR applicable –What to do with inspection points?

Open Issues Definition of IF subbands? –1 GHz bands (as for bands 1...5) –Or 25% of 2.4GHz  0.6GHz subbands? How to define the allowed IF ripple?

6: Critical Items, Key Issues, Recovery and Risk 1.Has the feasibility of all design-and performance critical items been established. –Yes. 2.Has the feasibility of all technology development critical items been established. –Yes The CDR Board Question List

6: Critical Items, Key Issues, Recovery and Risk 3.Have all technical-,planning- and resource risk elements been identified as Key Issues and have credible back-up or recovery scenarios been put forward consistent with the S/S, Unit and subunit planning –On some issues. There is no backup for any design faults detected during CQM phase. The CDR Board Question List