ME 495 EV Team 3: Adapter Plate Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.

Slides:



Advertisements
Similar presentations
Meshing and Stress Analysis of a “Droop” Limiter By: Geoffrey L. Ostermeyer Final Project For: ME 450 Professor: Dr. Craig Weeks December 14, 2000.
Advertisements

49cc Gas Powered Skateboard Project Team 10 Fall 2006 Team Members: Andres Caamano Stephen Bowes Matthew Maniscalco Roger Cuentas John Romano Roger Cuentas.
Fabrication and testing of a centrifugal pump living with the lab.
DVC 3.34 Produce working drawings to communicate production details for a complex design Lesley Pearce Team Solutions The Auckland University Nov 2012.
0 Beach Cities Robotics FRC Team 294 Summer Academy Motors and Gears July 20, 2008 Rick Wagner, Mentor, Beach Cities Robotics FIRST Team 294.
P11228 Week 2 Japh Learn Joseph Corea Tim Monahan Bryan Reinheimer Ed Gliss.
P11511 Project Review. Project Team, Faculty, and Customer Project Team: – Project Lead: Kevin Argabright (ME) – Team Members: John Fitch Dean (ME) Mike.
04013 Micro Turbine Senior Design Micro Turbine Senior Design PDR – May 20 th, 2004 Project
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
ME 495 EV Presented by team BJCANE: Brett Joseph, John Jolly, Colin Bates, Alex Fabbiano, Nick Smith and Eric Yost ME 495 EV: Electric Pontiac Fiero Project.
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
ME 495 EV Team 1: Alex and Eric ME 495 EV: Electric Pontiac Fiero Project.
A6: Team Rallye Potable Water Still Presented by: Full Group November 15, 2006.
22-1 Physics I Class 22 Electric Potential Work Integral in Multiple Dimensions (Review)
ME 495 EV Presented by BJCANE ME 495 EV: Electric Pontiac Fiero Project.
ME345: Modeling and Simulation Professor Frank Fisher Stevens Institute of Technology Last updated: June 25, 2009 Software versions used in the tutorial:
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
The BIM Concept Drawings, building views, visualizations, calculations and quantity take-offs are automatically derived from the 3D model. BIM= Building.
BAJA STATUS UPDATE September 27, 2011 FRAME & SUSPENSION Research Phase 100% completed Design Phase 75% completed – Frame Design (CAD) – Suspension Design.
OVERHEAD ANALYSIS Objectives of Cost Accounting: To calculate the cost of any work-in-progress To attempt to control costs by comparing actual with estimated.
Solid Modeling Overview ENGR 1182 SolidWorks 01. Solid Modeling Simple Parts  Solid modeling uses simple steps in a computer program to create 3D rendering.
SAE Mini Baja GROUP MEMBERS: JOHN MERRITT FRANCES OTHERSEN CHRIS DAVIS
From Left to Right: Adam York, Brian Brink, Betty Jo, Mitchell Greene, Marshall Noble. (NOT PICTURED): Stephanie Jacobs Project.
Design of a Robotic Manipulator for a Wheelchair Gateway Coalition Ohio State University Sinclair Community College Wright State University December.
Determining Obviousness Under 35 U.S.C. § 103 After KSR v. Teleflex
RoboVac Raymond Perez Jetmir Palushi Juan Gamarra Joseph Seborowski Diego Molina.
Engineering Graphics V
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
Ansys Workbench 6 Case Study with Plate and Shell Analyses ME 520 Fundamentals of Finite Element Analysis.
Internal Service Fund (ISF) Overview Presented at Weekly Business Session March 4, 2015.
BAJA STATUS UPDATE November 9, 2011 FRAME & SUSPENSION Design Phase completed Analysis Phase 35% completed – Frame Design uploaded to PATRAN – Material.
MSD I – Mid Project Presentation Winter 08/09 P09454: Design & Testing of Centrifugal Pump Components.
A6: Team Rallye Potable Water Still Presented by: Tim Rodts October 26, 2006 Nicole Del Rey Mike McConnell Tim Rodts Eric Sabelhaus.
Differential for Formula SAE Race Car
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
Feature-Based Parametric Modeling
BICYCLE CELL PHONE CHARGER Senior Design Project Team: Ajeetesh Govrineni (EE), Kellen Warriner (IE), Chris Battaglia (ME) Guide: John Kaemmerlen.
Introduction to Agriculture, Food, and Natural Resources
Final Demonstration Team 2A The Charles Machine Works Downhole Generator Project.
Visual Computing Geometric Modelling 1 INFO410 & INFO350 S2 2015
By: Richard Shook.  Computer-Aided Design  Sample Design  Design Process (SLAC)  ST-O And Filters  Background  Analysis  Results  Design.
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
CTF3-CLEX 12 July 2006 A. Faus-Golfe1 BPM´s for TBL IFIC group: A. Faus-Golfe, P. Modesto Mechanics UPC group: Y. Kubyshin, G. Montoro, A. Gelonch Electronics.
Structures Matrix Analysis
Tech/ME 140: Unit 5 Lecture Mechanism Design: Introduction to Mechanisms, Synthesis Using Graphical Approach. Motion Analysis and Simulation: Animation.
Hybrid Engine Test Stand
Lakota CAET Team Capstone Design Presentation
Earthquake Simulation Table
PM 598 RANK Education Your Life / pm598rank.com
PM 598 RANK Education for Service-- pm598rank.com.
Transmission system of Automobile
Modeling Layered Composites the Simple Way
The Gravity Games An Integrated 9th Grade Math, Science and Engineering Curriculum Resource Robo Educator Authors Terri Varnado Dan Ward Marie Planchard.
ME 495 EV: Electric Pontiac Fiero Project
Presented by Team 2: Colin Bates, and Nick Smith
ME 495 EV: Electric Pontiac Fiero Project
5 × 7 = × 7 = 70 9 × 7 = CONNECTIONS IN 7 × TABLE
5 × 8 = 40 4 × 8 = 32 9 × 8 = CONNECTIONS IN 8 × TABLE
4 × 6 = 24 8 × 6 = 48 7 × 6 = CONNECTIONS IN 6 × TABLE
5 × 6 = 30 2 × 6 = 12 7 × 6 = CONNECTIONS IN 6 × TABLE
Presented by Team 2: Colin Bates, and Nick Smith
10 × 8 = 80 5 × 8 = 40 6 × 8 = CONNECTIONS IN 8 × TABLE MULTIPLICATION.
3 × 12 = 36 6 × 12 = 72 7 × 12 = CONNECTIONS IN 12 × TABLE
5 × 12 = × 12 = × 12 = CONNECTIONS IN 12 × TABLE MULTIPLICATION.
Economic Research & Extension
Assembly drawings Flóra Hajdu B406
Practice Geometry Practice
ME 495 EV: Electric Pontiac Fiero Project
5 × 9 = 45 6 × 9 = 54 7 × 9 = CONNECTIONS IN 9 × TABLE
3 × 7 = 21 6 × 7 = 42 7 × 7 = CONNECTIONS IN 7 × TABLE
Presentation transcript:

ME 495 EV Team 3: Adapter Plate Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project

Connects motor to transmission case, aligning motor shaft to flywheel and clutch Provides structural support for motor coupling system Adapter Plate

Cleaned transmission Recorded rough transmission dimensions Initiated Solidworks generation Performed design calculations Performed finite element analysis Initiated report composition Previously on Adaptation

Finite Element Analysis

Adapter plate thickness depends on collar length Price is directly proportional to plate thickness Complex geometry or multiple parts might be necessary to stay under budget The design cannot be complete without final collar specifications and accurate transmission dimensions Set Backs

Solidworks Assembly

Obtain accurate transmission dimensions Update Solidworks model Consider complex plate geometries Complete conceptual design of adapter plate Acquire material for manufacture Next Week