Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group Palma de.

Slides:



Advertisements
Similar presentations
XMM XMM-NEWTON TTD Meeting: 8 April OPS-OAX (J. Martin) Autocommanding J.Martin, XMM-Newton SOE.
Advertisements

Commissioning KP 0ESAC December Michele Zundo ESA/ESTEC EOP-PEP SMOS KP 0 09-Dec-2008 SMOS SODAP Status.
Intraship Integration Control Instructor: TV Prabakar.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting MPE
XMM-Newton 1 Michael Smith, ESAC PN Monitoring MPE, May 2006.
MPE, 4th of May 2006 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 4th of May 2006.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting November 6, 2007, Mallorca María Santos-Lleó (XMM-Newton Science Support.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Palermo, April 2007.
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group MPE, 4 th.
XMM-Newton 1 M.Stuhlinger/M.Smith, ESAC PN Monitoring Mallorca, November 2007.
XMM-Newton Status of EPIC Operations Guillermo Buenadicha & Pedro Calderón Mallorca 8-April-2008.
XMM-Newton 1 M.Stuhlinger/P.Calderon, ESAC Re-appearance of the MOS1 CCD1 meteorite column during revs Madrid, 23. March 2010.
XMM-Newton 1SCI-SA Status of MOS and PN Realtime Operations 1) Current Operations Status 2) Eclipse preparation improvements 3) Slew Exposures 4) Offset.
XMM-Newton 1 Maria Santos-Lleo Science Operations Status EPIC Ops-Cal Meeting April 8, 2008, Mallorca María Santos-Lleó (XMM-Newton Science Support Manager)
XMM 1 MOS2 CCD5 anomaly Status of the investigations.
Transaction Processing IS698 Min Song. 2 What is a Transaction?  When an event in the real world changes the state of the enterprise, a transaction is.
Pedro Calderón/Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Pedro Calderón Riaño Guillermo Buenadicha.
EPIC TTD#16 SCIENCE OPERATIONS MPE, 04 May 2006 L. Metcalfe SCI-SDX XMM-Newton Science Support Manager 1 Science Operations & Data Systems Division Research.
Philae Status and News Venezia; 30 st of March th Philae Post-Launch Workshop.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, October 2006.
Mallorca, 1st of February 2005 Page 1 XMM-Newton Status of EPICs Operations Stéphane RIVES 1st of February 2005.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC XMM-Newton Instrument Anomaly Tool & Cross-Calibration Tool Marcus G. F. Kirsch.
XMM 1Michael Smith, ESAC EPIC PN Monitoring Provided by Michael Smith.
Ops. AGENDA Status of open Action Items Metcalfe Science Operations Status Metcalfe Instrument Operations Buenadicha EPIC Monitoring Stuhlinger/Smith 1.
Page 1 ACTIONS EPIC_10/1 on Munoz. EPIC_10/1 on Munoz. –Closed: MS delivered Slew Data Files  EPIC_10/2 on Smith: to verify whether PHS_tools checks for.
XMM 1 EPIC MOS Monitoring CAL/OPS Meeting Mallorca
Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha PALERMO 11/04/07.
XMM 1 EPIC MOS Monitoring. XMM-Newton 2 Martin Stuhlinger, ESAC MOS Bad Pixel Monitoring.
Guillermo Buenadicha / Neil Cheek SOC Operations Support Group Page 1 XMM-Newton Status of EPICs Operations Guillermo Buenadicha Neil Cheek MALLORCA 26/10/2006.
Marcus Kirsch, XMM-Newton European Space Astronomy Center Page 1 EPIC ESAC Long term EPIC in-orbit calibration plan Marcus G. F. Kirsch.
Science Operations Status Maria Santos-Lleo EPIC cal & ops meeting, Madrid March, 2010.
XMM-Newton EPIC OCB, 6-Nov-2007 EPIC OCB, 6-Nov XMM-Newton Future Instrument Operations Mallorca, 6 th -7 th November 2007 M. Casale, J.R. Muñoz.
RGS/MOS-cooling Results February 03, 2003 L. Metcalfe 1 Science Operations & Data Systems Division Research & Scientific Support Department Page 1 XMM-Newton.
EPIC Calibration Meeting, Madrid Correcting spatial inhomogeneities of the absolute energy scale K. Dennerl, 2010 March 23 Correcting spatial inhomogeneities.
I/O Systems ◦ Operating Systems ◦ CS550. Note:  Based on Operating Systems Concepts by Silberschatz, Galvin, and Gagne  Strongly recommended to read.
Secure Embedded Processing through Hardware-assisted Run-time Monitoring Zubin Kumar.
Scheduled Versus Event Driven Testing of Distribution Protection IEDs Dr. Alexander Apostolov, Benton Vandiver, Will Knapek, OMICRON electronics.
ALMA Integrated Computing Team Coordination & Planning Meeting #2 Santiago, January 2014 Control Group Planning Rafael Hiriart, Control Group Lead.
Operational SNS Karen S. White Controls Group Leader 10/11/10.
GIST May 2007 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-26 meeting.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
Space Science MO&DA Programs - October Page 1 SS Evidence for Mass Fractionation in the Isotopic Composition of Solar Energetic Particles Although.
RELIABILITY ENGINEERING 28 March 2013 William W. McMillan.
GIST October 2006 Page 1 MSG PROGRAMME STATUS Presentation to the GIST-25 meeting.
GIST th -29 th Apr B.Stewart RAL In-orbit Mirror Performance.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Status of EPIC operations Pedro Calderón Riaño, ESAC Leicester BOC meeting 6-8 March 2012.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
ESA UNCLASSIFIED – For Official Use HSO-OP - Solar and Planetary Missions Division Solar Orbiter Instrument Operations, Data Handling and FDIR Ignacio.
GIST-21 Meeting 31 March-02 April MSG PROGRAMME STATUS Presentation to the GIST-21 meeting.
GIST Meeting 5 February MSG-1 - PROGRAMME STATUS Presentation to the GERB GIST/PSG meeting.
NICMOS Suspend Event STB 632 “MECH_2_MAX_RETRIES_EXCEEDED” 2008/069.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
ISUAL System Design H. Heetderks. PDR 31 August 2000NCKU UCB Tohoku ISUAL System Design H. Heetderks 2 ISUAL Operations Overview.
Atacama Large Millimeter/submillimeter Array Karl G. Jansky Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Software Monitoring.
XMM-Newton 1 Michael Smith, ESAC PN Monitoring Mallorca, April 2008.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
UNIT 7 MAINTENANCE OF DIGITAL SWITCHING SYSTEMS 9/23/2016.
Oracle Database High Availability
Translation Lookaside Buffer
CMSC 611: Advanced Computer Architecture
Memory Management.
2007 IEEE Nuclear Science Symposium (NSS)
Current Profile PE  Shutter (CRB)
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
RLGS Status / LCC B. Pätz, DLR/MUSC.
GLAST Large Area Telescope:
Oracle Database High Availability
Translation Lookaside Buffer
Operation of Target Safety System (TSS)
Presentation transcript:

Guillermo Buenadicha SOC Operations Support Group Page 1 XMM-Newton EPIC SW Status Guillermo Buenadicha TOS/OFX, SOC Operations Support Group Palma de Mallorca, 1 st February 2005

Guillermo Buenadicha SOC Operations Support Group Page 2 XMM-Newton Introduction ACTIVITIES SINCE LAST TTD –SW Versions –EMDH K upload –EPIC PN Spare testing 5 YEARS OBSW, WRAP UP. –Why modifying SW? –Examples –Where are we –What’s next? OBSW Contract expiration

Guillermo Buenadicha SOC Operations Support Group Page 3 XMM-Newton Current SW releases

Guillermo Buenadicha SOC Operations Support Group Page 4 XMM-Newton EMDH K UPLOAD The EMDH K was uploaded on the 5 th of May 2004, after testing on the Spare and a prior uplink end of April. A refined version used (just SW reallocation), to avoid alarms related to boot of the EMDH Slave processor. All items for extended BP handling in place, only pending issue is the modification of the ground SW to ingest them into the relevant FITs. This will be implemented into the new S2K system. Also in place the preventive correction for the FW movement in presence of a sensor failure, and the HK flagging mechanism. Any ideas for the later???

Guillermo Buenadicha SOC Operations Support Group Page 5 XMM-Newton EPIC MOS: EMDH K ECR #7 After cooling in rev 533, reduction by 8 in the number of Bright Pixels. However, management still deemed necessary to cope with future increase. Preliminary analysis of options in ISS-MOS-BPT-TN-01 (July 2002). Option selected for a demonstration prototype is to increase up to 250 pixels per HBR, using a data reduction strategy in the BPT storage. The constraints in any implementation are the reduced and limited data space in the EMDH processors. The implementation chosen also impacts in the BPT uplink and report mechanisms, and the rejection procedure, although limited changes are foreseen there to maintain performance.

Guillermo Buenadicha SOC Operations Support Group Page 6 XMM-Newton EPIC MOS: EMDH K ECR 12 Existing logic, Safe entering Logic After EMDH K Prime sensor Closed Redun sensor Closed Ext Temp sensor < 60 deg What if FW Open, and Ext Temp broken (temp >60)??? Prime sensor Closed Redun sensor Closed Ext Temp sensor < 60 deg Check Override bit Move FW If bit set to 0, no differences w.r.t. current situation. If bit set to 1, FW will move in any case.

Guillermo Buenadicha SOC Operations Support Group Page 7 XMM-Newton EPIC PN SPARE TESTING EPIC PN Testing on the Spare Performed on the Panter facility on the last two weeks of Nov LABEN, ESAC, PI’s. Purpose of it was to verify the readiness of the Spare Chain, and to upgrade it with the latest SW (EPEA 517, EPDH K, latest Ops DB procedures). Special test devoted to perform the fast dump of the offsets via HBR. Dedicated set of tools developed to support testing and data analysis. Identified the need of a warm reset in case of a CDMU crash (quite unlikely!!!). Procedure change.

Guillermo Buenadicha SOC Operations Support Group Page 8 XMM-Newton EPIC PN: ECR # 2 EPDH EPEA FIFO 8 Kwords HBR Buffer 40 Kwords CDMU BRAT selected: 16 Kbps for 1 quad 34 Kbps for 2 quad words (130 Words + 10 msec) * 200 >= 2 secs Up to reads per second??? PST HK 4 Science Queue 16 Packets NP 4 VC-7 TM GROUND TC F0106 Xqt_offs Dump_offset 1 packet every 250 msec.

Guillermo Buenadicha SOC Operations Support Group Page 9 XMM-Newton NEW OFFSET DATA STRUCTURE EPIC PN: ECR # 2 CURRENT OFFSET DATA STRUCTURE + 59 x x x 64 + x 200 Q = Quadrant Id C = CCD Id T = Table Id B = Block Id P = Pixel Status O = Offset Value S = Seconds of Offset Calculation F = Fraction of Seconds I= Pixel I coordinate J = Pixel J coordinate Q = Quadrant Id C = CCD Id O = Offset Value

Guillermo Buenadicha SOC Operations Support Group Page 10 XMM-Newton 5 years of SW modifications

Guillermo Buenadicha SOC Operations Support Group Page 11 XMM-Newton EPIC OBSW RELEASES EPEA 517EMDH I EPDH I EPDH JEMDH JEPDH K EMDH J+ EMDH K

Guillermo Buenadicha SOC Operations Support Group Page 12 XMM-Newton 5 years of EPIC SW EMDH  4 versions EMDH I, J, J+, K EPDH  3 versions EPDH I, J, K EPEA  1 version EPEA 517 No other units modified

Guillermo Buenadicha SOC Operations Support Group Page 13 XMM-Newton Reasons for SW modifications The OBSW is typically modified after launch due to 3 scenarios: Need to correct launch SW bug and to tailor the OBSW during the commissioning phase. CORRECT Fit the unit to the nominal performance and implementation of improvements. ADAPT Preparation of the instrument for an extended lifetime and prevention/correction of HW failures or degradation. PROTECT

Guillermo Buenadicha SOC Operations Support Group Page 14 XMM-Newton OBSW changes XMM CORRECT ADAPT PROTECT

Guillermo Buenadicha SOC Operations Support Group Page 15 XMM-Newton Examples EPIC: Correct  EPEA 517 NCR’s 5 and 12, Low energy noise, Image correction consistent.  EMDH I TC rejected, FW movement, Headers and trailers not matching. (NCR’s 3, 9, 14) TC rejected, FW movement, Headers and trailers not matching. (NCR’s 3, 9, 14)  EPDH I TC rejected

Guillermo Buenadicha SOC Operations Support Group Page 16 XMM-Newton Examples EPIC: Adapt EMDH J, J+ Internal LABEN fixes, Watchdog Function Internal LABEN fixes, Watchdog Function EPDH J Watchdog function Watchdog function EPDH K Fast dump of Offsets Fast dump of Offsets

Guillermo Buenadicha SOC Operations Support Group Page 17 XMM-Newton Examples EPIC: Protect CDMU J NCR 83, PN Operating heater autonomous switch off EMDH K Extended BP capability Extended BP capability Prevent possible sensor failure impacting on FW ???

Guillermo Buenadicha SOC Operations Support Group Page 18 XMM-Newton Where are we? After 5 years, it is time to sum up SW status and see what is needed. Several NCR’s declared as “Unresolvable”, ground W/A in place. Are we happy? Adaptations needed. –Any performance improvements? –Security issues –Do we need to monitor performance? HW failures –How to deal with them –Mission lifetime and unit specifications

Guillermo Buenadicha SOC Operations Support Group Page 19 XMM-Newton Unresolvable items NCR-39 PN quadrants not listening. Performance. NCR – 75 Fail to reset EPEA Time at Processor performace. NCR –99 Late start of time in EPEA. Fixed in SAS but still problem OB. Processor performace NCR-97 TC E0001 fails transmission. SW bug. NCR-100 Erroneous fine Time in the Time verification packet. SW bug. NCR –103, Corrupted events confused with time info’s. Processor performance. NCR-106 Failure of F0119 (LBR error) NCR –107 3 rows missing in MOS-2 CCD 6. Not clear.

Guillermo Buenadicha SOC Operations Support Group Page 20 XMM-Newton Performance and security NCR’s like 75 (EPEA time reset), 103 (FFFF words) affect quality of data, so far taken care by On Ground SW. 107 3 rows missing in MOS2 CCD6 MOS Offset??? Response of PN quadrants to TC’s TREND MONITORING?, ACTIONS?

Guillermo Buenadicha SOC Operations Support Group Page 21 XMM-Newton EPIC PN: Time Problems 3 Revs. 478 to 510: FAILS / EVENTS ratio

Guillermo Buenadicha SOC Operations Support Group Page 22 XMM-Newton HW failures, possible impact µP performance, future degradation Impact on BW and quality of the data transmitted (EPEA problems) HW failures(PN Q2 Voltage converter current out of limit, EMAE 28 volts line down). RGS ADC error. LCL trip of, NCR 83 on PN. Processor resets, radiation harness, non EDAC memories. Changes in SW variables CCD degradation or unavailability.

Guillermo Buenadicha SOC Operations Support Group Page 23 XMM-Newton WHAT’s NEXT? Better flagging and SW debugging? Becomes more and more important. Information on scheduled process, variable status, buffer occupation… Failures HW related? Do we know the impact of LCL failures, quadrants not working, status of redundant channels (readout nodes, units, etc)? Any preventive measure like NCR 83 or ECR 12 OB? Degradation and performance How to cope with CCD degradation. How to handle more failures or worse response from the event analyzers. New modes foreseen Is there anything expected? Old modes to be revisited? Instrument operations in reduced coverage scenario? Can we operate them with longer outage periods?

Guillermo Buenadicha SOC Operations Support Group Page 24 XMM-Newton OBSW Contract The OBSW contract ESA/Consortium expires mid Is the HW going to be kept? Expertise maintenance? Any foreseen activity before expiration?