Bridge Project Presentation Group #2 Alex Odle Matt Simon Salim Hamed Micael Thiodet.

Slides:



Advertisements
Similar presentations
Universidad Simón Bolívar Ingles II para Arquitectura y Urbanismo ID2125 Prof. Carolina Lista Andrea Merle Marielena de Jesús
Advertisements

PHYSICS 1401 JEFFERY DING ALAN JONES
UNDERNEATH DECK TRUSS. THE NEXT 6 SLIDES ARE EXAMPLES OF ROADBEDS FOR EACH TYPE OF TRUSS BRIDGE.
Physics of Bridges Mr. Hoa STEM 2014.
The team JAC worked hard on every part of this project. So we hope you enjoy this power point presentation. J. A. Q.
How to build a bridge!.
Introduction to the basic concepts employed by the structural engineer when designing and building bridges including load, dimensions, and materials.
TODAY ADD LEGO rubric to end of your lab write-up for LEGO NXT
Exploring Engineering Darin Gray Group 5 July 15 th, 2011 Darren Draper Sinem Sargin Ryan Vo Marquel Jones-Francis.
Disasters & Failures Dr Lisa Ball. BEAM TRUSS CANTILEVER ARCH CABLE STAYED SUSPENSION.
Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University Anatomy of A Bridge Atin Sinha, Ph.D., P.E. Albany State University.
Trebuchet Project By AM and CS.
The Pacific Launchers1 Parabolic Food Aid Delivery System (PFADS) The Pacific Launchers Ryan Liu & Michael Nguyen University of the Pacific ENGR 5 December.
Bridge Report By Jenny. Gina. Eunji. Matt Team 5.
How does a bridge work? A Mini Lesson: Bridges & Forces.
Engineering 100: Bridge Project Group 6 (Team Bacardi) Jon Honari, Kevin Lam, Otis Chantharangsy, Ivee Ilao Group 6 (Team Bacardi) Jon Honari, Kevin Lam,
There are more than 500,000 bridges in the United States!
Structural Engineering Notes PowerPoint Courtesy of Amherst Middle School Technology Department TMS Technology Education Presents:
Somerset Berkley Regional High School Robotics Engineering with LabView.
Bridge Design Report Jeremy Hennings Matt Kilmer Tim Williams Nina Mairena.
There are many types of bridges including:
Five Paragraph Essay The faster I write the better my output. If I'm going slow I'm in trouble. It means I'm pushing the words instead of being pulled.
Critical Thinking in Engineering Process
BRIDGE AND ROV GROUP 4. Alex Paige Collin Palmer Sifat Syed Marc Hermann.
Webquest.  Introduction  Roles  Task  Process  Evaluation  Conclusion  credits.
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
World’s Tallest Tower Case Study #1 Northern Highlands Regional High School Applied Technology Department Real World Engineering List Design/Build Engineering.
Bridging the Gap: Building Bridges 101, It Is Time to Get To Work
Reasons Not to be Baptized This lesson is a follow-up to the previous one on “The Basics of Baptism.” In it we outlined the 3 P’s of scriptural, and therefore,
MESA DAY BRIDGES. MESA BRIDGES Forces at Work Forces in a Bridge Building Better Bridges Rules Testing Procedures Materials Suppliers.
Discover Engineering ENGR 096
Fun with Physics Intersession By Josh Walters. In this intersession (fun with physics) we did a lot of hands on projects to help us learn more about physics.
Structural Engineering Notes Directions: This PowerPoint will enable you to complete your “Structural Engineering Note Packet”. Use the forwards and.
Bridges Introduction to design.
Group 6 Casey Ligrano Hampton Brown Nicholas Johnson Xuan Nguyen.
Bridge Construction Project Jennifer Schofield, Kirsten Riggle, Justine Staniszewski
Water Stryders ENGINEERING DESIGN 100 SECTION 205 MIKE LAMOND, BRENDAN MILLER, ZACK YEGER, EVERETT ZOFCHAK.
By Dane Wrye Ben Ghusn Stem Lab.
Enhancing Thinking Skills in Science Context Lesson 6
THE BALANCE POINT By Julia D’Innocenzo.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Problem Solving, Decision Making, Negotiation and Compromise
Bridges 11/12/13. Bellwork  What are the two types of friction?  Static and kinetic friction  Reminder: “Reverse World” assignment due tomorrow!
Bridge Building Design Challenge
The Only Crime is Getting Caught Final Lesson. Please complete honestly Usefully – if you didn’t like something say why or make a suggestion for an alternative.
Nathanael O’Hara. IDEAS I Researched Games Tables I liked these designs in part I decided to mesh the designs into something I liked and also could work.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Money.
° Speedometer Display ° Speedometer Display The speedometer on a car is traditionally a circular dial using around 270° of the arc to indicate.
Title Science Fair Project Names School Grade Teacher Note: This slide goes on the back of your board on the top right. No names on front so that it is.
The problem is to design, construct and test the most efficient bridge within the specifications. Back to start of slide show.
STRESS RIBBON BRIDGE   1 1.
Bridges Mr. Ruddle.
Discover Engineering ENGR 096
Popsicle stick bridge Ryan and Simon.
Red Hawk Me, Myself, and I.
Tim Wyckoff David Cenidoza Sachin Narvekar Felix Liu Weston Wells
The guide will explain each page and what is on each page
Stick Together & Civil Structures
Replacement of Vechicle Bridge over Spring Creek Centre County, PA
Bridge Project: Team Truss-Arch
استاد:مهندس شهید زاده محمد رضا چناری
Bridge Report Team Total Domination. Bridge Report Team Total Domination.
Construction: Building and Beams
Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials. Bridge Project.
John Blair DJ Geoff Morgan Michael Rossol
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
Bridge Project Problem Definition: Design a Bridge to span a given distance while supporting a maximum load using a minimum materials.
Presentation transcript:

Bridge Project Presentation Group #2 Alex Odle Matt Simon Salim Hamed Micael Thiodet

Outline of Presentation Introduction –Group Members –Goals and Constrictions –Group Goal Prototype Testing –Design Process Final Design –Changes Made To Final Project Conclusion Final Thoughts and Suggestions

Introduction Group Members: –Salim Hamed –Alex Odle –Matt Simon –Micael Thiodet

Goals and Constrictions Goal: –Build an efficient bridge Constrictions: –Limited Materials –Limited dimensions –Limited Time

Group Goal Our group initially decided that we were going to focus on efficiency rather than overall weight the bridge can support. For these reasons both the prototype bridge and the final bridge was created using fishing line as substantial material.

Prototype Testing Types of Considered Bridges: Cable Stay Bridge Suspension Bridge

Our Choice… Cable-Stay Bridge Reasons why we picked a cable-stay: –The supported weight will be forced down to the sides of the jig –Less materials because we will utilize the fishing line –Aesthetically pleasing a.k.a. “ sexy ”

The Completed Prototype Before the Test After the Test FAILURE POINT

Results of the Prototype Test Weight: lbs Max. Load: 70 lbs Efficiency: 102 The prototype bridge failed because the fishing line was not under tension. Therefore all the weight was being supported by the deck, which was not designed to support all the weight on its own.

Final Design Changes made to the final design: –Complete redesign of the bridge –Final bridge will have a string based structure Reasons for the changes: –More efficient than prototype –Less complicated than prototype –And still “ sexy ”

The Final Bridge Carlos Santana (named for obvious reasons)

Results of the Final Test Weight: 0.04 lbs Max. Load: 75 lbs Efficiency: 1875 The results of the final test were very pleasing. The bridge didn’t actually fail, instead as the string flexed the metal plate that was resting on the string interfered with the jig. As a result we had to stop the test. Our improvement worked just as we had planned. The bridge was very efficient as seen by the efficiency rating.

Irony?... I think not

In Conclusion… Carlos Santana

Final Thoughts and Suggestions Final Thoughts: We would have used a different size metal platform so Carlos Santana could have tested until failure Suggestions: Have good group communication Budget materials wisely Spend plenty of time at the drawing board designing the bridge When gluing, don’t use too much glue and clamp the wood while it is drying

THANK YOU Very Much… Are there any questions? Good! Because I want to go check and see if my hair still looks as good as it does in this picture