10 years of SLEIPNER CO2 Storage Classification: Internal Status: Draft 10 years of SLEIPNER CO2 Storage Tore A Torp, Dr.ing. Adviser CO2 Storage, StatoilHydro ASA, Norway
11 years of SLEIPNER CO2 Storage CONTENT: “Low Carbon Diet” Industrial Experiences with CO2 Sleipner, In Salah, K12B, Ketzin, Snohvit and ??? VISION
Sleipner CO2 injection: - Decided in 1992 - In operation since 1996 - 1 million tonne CO2/år Time Magazine, 17. May 2004
Previous Experiences with CO2 & Injection Enhanced Oil Recovery (Texas, Hungary, Turkey, Brazil,Croatia) Natural gas cleaning Transport – Pipelines & Ships Natural gas re-injection Natural gas underground storage and Beer & soft drinks, dry cleaning, food packaging – Every day life
Yara CO2-tankers, 1500 m3 capacity
The Sleipner field – CO2 Treatment and Injection
CO2 Injection Well in "Utsira" Sleipner A Sleipner T 500m CO 2 Injection W ell 1000m CO Utsir a 2 F or mation 1500m Sleipner Øst Production and Injection W ells 2000m 500m 1000m 1500m 2500m Heimdal Formation
The Utsira Formation
SALINE AQUIFER CO2 STORAGE PROJECT BGS BRGM GEUS IFP NITG-TNO SINTEF Statoil BP ExxonMobil Total Norsk Hydro Vattenfall IEA Greenhouse Gas R&D Programme Schlumberger Research NO, DK, NL, FR & UK Authorities
Time-lapse seismic datasets of CO2 stored in Utsira formation As mentioned – a very important part of the Sleipner CO2 injection project has been to monitor the behaviour of CO2. These pictures show seismic datasets over the period 1994-2006. It clearly shows that CO2 is contained in the formation by an overlaying cap-rock.
1 km CO2 distribution June 2006 Plume extension & top Utsira time map CO2 distribution June 2006 8,4 million tonnes injected over 10 years Plume area: 2,8 km2 (1,3 km2 in 2001) Plume long axis: 3760 m Maximum distance from injection point: 2560m Maximum speed of front since 2004: 250 m/year, Distance from CO2 to wells: Exploration well 15/9-13: 430m, decreasing about 12 m/year D-template: about 2 km straight west of northern plume 15/9-19 wells: about 4,5 km north of plume saddle 3,76 km Injection point 15/9-13 Seismic section Plume outline June 2006 430m Plume outline Oct 2001 1 km Amplitude maps of the uppermost horizon, in 2001 (left), 2004 (middle) and 2006 (right). Hot colours represent higher amplitudes and thicker CO2 accumulation.
Simulated picture of the distribution of CO2 after three years. Radius of largest bubble 800 m and the total plume 200 m high. Ref: SINTEF Petroleum 2001
Dissolution of CO2 in the Utsira Brine Year 2412 Year 2021 Year 2621 Year 5019 Year 7018 Source: Gemini No. 1, 2004 (NTNU and Sintef)
3D Seismic proven, Gravimetry tested SACS Project 1998-2002 WHAT WE DID ACHIEVE: 3D Seismic proven, Gravimetry tested Reservoir simulation tools partly proven Geology and Geochemistry of “Utsira” mapped Reason to expect the CO2 to stay for thousands of years DOCUMENTATION “SACS Best Practice Manual, 1.version.” Download from www.co2store.org, see page “SACS”.
Demonstrations of CO2 storage SLEIPNER SNØHVIT WEYBURN KETZIN IN SALAH FRIO BRINE Nagaoka K12B GORGON Source: IEA GHG
Sleipner CO2 Injection
SAFETY STRATEGY - Prepare Detect Remediate
What is keeping the CO2 down? Trapping Mechanisms Closure - from day one –faults? Micro-pore trapping - during injection - lasting Dissolution in water - sinking to the bottom – centuries Mineral binding - precipitating solids – centuries/millennia
Possible Leakage? Leakage ways? WELLS - Corrosion of cement & steel Faults/Cracks – Overpressure critical Underground fluid mobility – Site specific Prevention Detection Remediation
Monitoring and safety over TIME? Before start: Site selection, Planning and Risk assessment =>licence During injection: Monitoring – “Watch the barn doors” => report Closure: Monitoring and long-term risk => agreement Post-closure: Monitoring gradually less => hand-over Safety against leakage will be better over time!
CO2 Capture and Storage (CCS) needs two legs to walk! Leg 1: TRUST in Storage Methods from oil and gas industry Geology varies from place to place More demonstrations Leg 2: COST of Capture Energy use Costs Better technologies Pace: CO2 Transport Pipeline Ship Large projects
Vision
SLEIPNER - 10 years of CO2 Storage THANKS for your attention! QUESTIONS?