AFE II Status. Analog Front-End (AFE) Board  Approximately 200 AFE boards are needed to readout CFT (&CPS/FPS) u 512 channel (2/cassette) u Analog output.

Slides:



Advertisements
Similar presentations
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
Advertisements

SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
Cryo and AFE IIt Update MICE Collaboration Meeting October 22, 2005 RAL A. Bross.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Paul Rubinov TriP-t & AFEII status. AFE and CFT 9 o K VLPC (x512) AFE DISCRADC Discriminator output every 396 nsec for L1 Amplitude signal readout for.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
J. Estrada - Fermilab1 AFEII in the test cryostat at DAB J. Estrada, C. Garcia, B. Hoeneisen, P. Rubinov First VLPC spectrum with the TriP chip Z measurement.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
CFT Calibration Calibration Workshop Calibration Requirements Calibration Scheme Online Calibration databases.
WBS 1.7: AFE II Project Cost and Schedule Alan Bross DZero Run IIb AFE II Director’s Review April 13, 2005.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
MICE Tracker Readout Status VLPC – Cryo – Front End Electronics A.Bross Berkeley, February 2005.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
January 22, 1999SciFi L1 Trigger Review 1 Analog Hardware Front-end Board (CTT_FE) –Transmit (and split) the VLPC signal to the Multi-chip Modules –Discriminate.
NIU Trigger Workshop CTT Commissioning Trigger Workshop October 22, 1999 WBS & Presented by Fred Borcherding for the D0 Electronics Group.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
7 Jan 03 CFT+PS Weeks in Review Sequencer status –1553 communications issues may not be fully resolved –scanning still off Calibration –calibration database.
Cryo and AFE IIt Update Fiber Tracker Meeting April 6, 2006 Imperial College A. Bross.
AFE IIt Project Status. Current Status  AFE II Prototype Testing Complete u Detailed ch by ch testing has been done s 3071 good channels out of 3072.
12/7/2015 Paul Rubinov PRR Mar Production Readiness Review  Welcome!  Our motto: When you earnestly believe you can compensate for lack of talent.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
Valerio Re, Massimo Manghisoni Università di Bergamo and INFN, Pavia, Italy Jim Hoff, Abderrezak Mekkaoui, Raymond Yarema Fermi National Accelerator Laboratory.
01/04/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
TeV BLM Review 4/19/041 Tevatron BLM Review - Schedule BLM Replacement Prototype schedule: Provide prototype digitizer cards, crate, readout path by ~
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
Trip-t testing progress report
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Sensor testing and validation plans for Phase-1 and Ultimate IPHC_HFT 06/15/ LG1.
AFE Meeting June 5, 2001 SIFT UPGRADE Marvin Johnson.
WBS 1.2.8: AFE II Status and Plans Alan Bross for the DZero Central Fiber Tracker Group DZero Run IIb Detector Upgrade Director’s Review July 15, 2004.
February 24, DØ’s VLPC Detectors: The Fiber Tracker and Preshowers Greg Davis University of Rochester.
FPD STATUS Carlos Avila Uniandes/UTA 1. FPD overview 2. Roman pot and detector status 3. FPD readout integration status 4. Software status 5. Stand-alone.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
SEQUENCER DELAY PLD By ANTON H.C. SMITH ELECTRICAL ENGINEERING UNIVERSITY OF SOUTH CAROLINA.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
4 May 2006May 06 PMG - Paul R1 AFEII-t Status May 4, 2006 PMG Paul Rubinov.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Mai 31th 2011 Christophe Beigbeder PID meeting1 ETD meeting Test setup : Activities in Bari, Univ of Maryland and at Orsay Test setup : Activities in Bari,
DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
29/05/09A. Salamon – TDAQ WG - CERN1 LKr calorimeter L0 trigger V. Bonaiuto, L. Cesaroni, A. Fucci, A. Salamon, G. Salina, F. Sargeni.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
TAB-To-L3(Tape) ● At the L1Cal2b sidewalk test stand we have a setup to transmit the data coming from detector to tape using the new system. ● We installed.
ETD meeting Architecture and costing On behalf of PID group
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
PyBAR Firmware Structure and Operation Experience
AFE II Status First board under test!!.
Example of DAQ Trigger issues for the SoLID experiment
Tracker Software Status
PID meeting Mechanical implementation Electronics architecture
Presentation transcript:

AFE II Status

Analog Front-End (AFE) Board  Approximately 200 AFE boards are needed to readout CFT (&CPS/FPS) u 512 channel (2/cassette) u Analog output via SVX IIe u Discriminator output every 396 ns for L1 trigger u MultiChip module (MCM) s SIFT chip –Analog buffer to SVX –Discriminator output s SVX IIe

AFE II  A Tremendous Effort has already gone into AFE II PPD EE Department John Anderson Jim Hoff Abder Mekkaoui Paul Rubinov D0 Alan Bross Juan Estrada Carlos Garcia Peter Hasiakos Bruce Hoeneisen Marvin Johnson Mike Utes

AFE II  AFE II u Full New set of boards u No SIFT No SVX – Much simpler architecture u Will use instead s Trigger Pipeline Chip: TriP (or Tript - more in a bit) –Discriminators and analog pipeline –TriP chip submission was very successful – meets spec. s Commercial Flash ADCs + FPGA for analog information s Integrates completely with existing system u Will Have s No Front-end saturation problem –Reset once per crossing –Also allows for data taking in abort gap (cannot do presently with AFE I) VERY useful for Calibration studies s Improved Ped dispersion and stability –Lower and tighter threshold setting capability Channel by Channel - analog s Improved reliability s Improved readout flexibility –Decreased deadtime –Multi-buffering possible CFT Readout may dominate L1 readout rate without multi-buffering s Added Functionality with new submission of TriP Chip - Tript –z information from timing (  2 ns rms)

TriP  The existing TriP ASIC (7000 die on hand)  Lots of testing done over last 2 years

AFE II –TriP Performance  Measurements on TriP very promising u Noise at 1/5 pe rms u Threshold setting at 1.5 pe reliably u Very high quality Analog Data  Plot at right was obtained after 1 day of work on a TriP modified AFE board u To get this good, a plot with the AFE took about 1 month of dedicated work by the same people! s BLACK – DATA s RED – FIT  All Discriminators Firing!

AFE II – TriP Discriminator Performance  Upper plot u Red – all data u Blue same data with threshold and discriminator fires u Black – fit  Lower plot u Ratio of analog data with and without discriminator fires (threshold set)  47% occupancy

TriP-t: the new idea  About 1% additional components:(time to amplitude converter)  7 bits t-info offline: 120ns full scale=> 2ns time => ~30cm resolution in Z

AFE II - TriPt  With a rather simple modification to the TriP design – time stamp for hits can be obtained  Current TriP  Electronics resolution was determined to be  400 ps u For 8 pe signal expect about 2 ns sigma  Z measurement –  30 cm  Has impact on reco time and cluster splitting  In Z   +15 min bias MC s 40-60% reduction in reco time s D0 Note 4497 u Improvement in clustering algorithm utilizing z info also a possibility 400 ps intrinsic resolution

TriP-t prep work  Bench testing  New package

TriP-t current status  The chip designers are chip designing.  Ready for submission 23 Aug ’04  The new chip is the “critical path” item for the project  Some prep work going on now u We will need new packaging u We had some concerns about features used on the new chip, but not used on the old (current!) TriP chip, so we are retesting some things.

AFE II - Cost and Schedule  Full Project Plan Now Available

AFEII Prototype - current status  Schematic design is 100% complete.  Internal review was held in early May.  Layout of the board is about 95% complete.  All parts are here.  Req’s for boards are in the system.  RFQs for stuffing are on the street.  Firmware about 75% complete.

AFE II – Cost and Schedule  Cost M&S: u Production cost M&S are based on quotes for parts and labor – contingency estimate is grounds up:  Manpower u Estimates from AFE experience  Schedule critical path is the Tript chip  Completion for the 05 Shutdown is not likely  Planning for adiabatic Installation u AFE I and AFEII mixed running u Will need to test compatibility once AFE II prototypes are ready (9/04) u Installation will have to be done at the crate level (16 boards) because of difference in power requirements for AFE I and AFE II  Credibility of installation plan is dependent on prototype tests u How quickly they come up u Platform test and integration with trigger u Software readiness u Physical Installation can occur quickly (8 hour)

AFE II Milestones  AFE II Prototype under test9/04  Tript MOSIS submission9/04  D0 Internal Review1/05 u May be moved up to October  Director’s Review2/05 u May be moved up to Novemeber  Tript production submission3/05 u Possibility for “non-shared” submission in 12/04  AFE II pre-Production7/05 u Attempt to move up to 11/05 u Boards available for KEK Test?  AFE II production9/05  AFE II production complete12/05  First Board Ready for installation2/06

Conclusions – Improvements with AFE II  AFE II will u Improve noise floor and pedestal stability which will allow for consistent and reliable threshold setting with no discriminator feed-through or discriminator threshold shift s Will increase physics trigger efficiency s Potential for better hit efficiency and point resolution s Maintain capability of Preshower Detectors u No Front-End Saturation problem (reset once per crossing) u Added functionality of the Tript (z information) s Large reduction in reco time s Possible improvement in cluster finding –Cluster splitting leading to additional improvement in track quality u Readout architecture much more flexible s Less deadtime s Multiple buffers can be added to greatly increase L1 capability u Board construction is simpler, more robust s No MultiChip modules (MCM) s Mostly commercial parts/standard mounting techniques s Repairs/rework MUCH easier than in AFEI  AFEII will improve our capability to maintain high-quality and stable operation as the Tevatron Luminosity increases in RunII. This will allow D0 to maintain excellent tracking, trigger, and Preshower performance

DAQ System  We need to build a clone of the new test stand DAQ that is being put together at D0

New DAQ  Consists of(for 4 Board Readout) u VIPA crate (10U) s Bit3 controller s 1553 controller s VRB (VME readout bus) s VRBc (VRB controller) s Serial command link receiver card (SCLr) u Sequencer crate s Sequencer controler (SEQc) + SCLr s Sequencer s 2 fibers for connection of the VTM s 2 grey cables for connection to the AFEs (2AFEs/cable) u AFE s 4 (+2) Boards (minimum) s Two backplanes for cyostat. u PC and custom cables u Special trigger cards (2) (STDB) u Hardware for downloads of firmware for AFE, SEQ, VRBc, and SEQc

New DAQ  Cost (k$) u VME1 u SEQ1 u u Power supplies2 u AFE BPs2 u Bit3 controller1 u SEQc2 u AFEIIs4/each (X6) u SCLr cards2 u Rack1 u Cables, misc.4 TOTAL:  $40-50K

New DAQ  We have started work on the DAQ. However there is a great deal of work to do to have a system ready for the KEK test  There is also a VERY steep learning curve on becoming an expert on this system and at least one will be needed for the beam test. u So Far I have not been able to get additional Fermi people interested or, at least, committed to it (there is interest).