UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 1 UCSB in CMS.

Slides:



Advertisements
Similar presentations
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Advertisements

US CMS Silicon Tracker Project – Breakout session Overview - DOE/NSF Review Brookhaven - May 20, Incandela 1 CMS Si Tracker: Breakout Session Dept.
MEG Review at Brookhaven, Feb 5, 2004 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
US Tracker Production Meeting, March 8, 2005 J. Incandela 1 Slides for the US Si Tracker Weekly Production Meeting J. Incandela March 8, 2005.
MEG Review at BNL, Jan. 18, 2006 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
Tracker Week – UCSB Gantry Status – July 20, 2004 – Dean White 1 Gantry Report University of California Santa Barbara UCSB Gantry Team: Andrea Allen Dave.
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.
TOB Status Joe Incandela University of California, Santa Barbara For the TOB Group Tracker General Meeting Sep. 21, 2001 at CERN Slides courtesy of: A.
US Production Report - September 4, Incandela 1 US Production Report CMS Tracker Steering Committee 4 September 2003 J. Incandela University of.
DOE REVIEW 1/20/04 – Dean White 1 Gantry Module Assembly TOB & TEC Dean White University of California, Santa Barbara.
US CMS Silicon Tracker : Schedule J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
US CMS Silicon Tracker : Overview J. Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager Fermilab PMG April 9, 2004.
DOE/NSF Review, BNL, May 20, Incandela1 CMS Tracker: Cost, Schedule, Planning and M&O Joe Incandela, University of California Santa Barbara US CMS.
1 Long Term Module Testing-Anthony AffolderTPO, December 11, 2003 Current Module LT Testing Capability Only Vienna Boxes Available  10 slots at each site.
US CMS Si Tracker Project presentation to the Program Management Group at Fermilab; 22 October 2004, J. Incandela (UCSB) 1 US CMS Silicon Tracker Project.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Comprehensive Review June 28,
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
MEG Review at FNAL, Jan. 28, 2005 : CMS Si Tracker Project: J. Incandela 1 US CMS Silicon Tracker US LHC Detector Maintenance and Operations Evaluation.
UCSB CDF Group, DOE Site visit, Jan 18, J. Incandela 1 Top Physics at CDF ++ Top Quark and New Physics with an eye toward the LHC Work completed.
4/25/2006 Puneeth Kalavase, UC, Santa Barbara On behalf of US Tracker Outer Barrel group Construction and Testing of CMS “Rods”
Finding ST Sensors that cause CMN: A Follow up to TSC Meeting N. 215 Prof. J. Incandela UC Santa Barbara US CMS Tracker Project Leader Tracker Steering.
Status of the Tracker Outer Barrel Joe Incandela University of California Santa Barbara for the US and CERN Tracker Groups Annual Review June 15, 2004.
US Module Production Status Joe Incandela University of California Santa Barbara for the US CMS Silicon Tracker Group CERN Tracker Week July 2004.
US Module and Rod Production Overview and Plan For the US CMS Tracker Group.
Slide 1UCSB Rod Production presented by Jim LambDOE review, January 20, 2004 UCSB Rod Production UCSB Rod Production, Jan , presented by Jim Lamb.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
CMS at UCSB Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara Status and schedule CMS Weekly Meeting Fermilab May 14, 2004.
Schedule & Plans Prof. J. Incandela US CMS Tracker Project Leader DOE Visit January 20, 2004.
US Module Production Prof. J. Incandela US CMS Tracker Project Leader For the US CMS Tracker Group Tracker Meetings - CERN Feb. 13, 2004.
Slide 1 Anthony Affolder US Silicon Meeting, March 9, 2004 Equipment Status ARCS equipment status à Single module and 4 hybrid DAQ equipment status à Vienna.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
1 US Testing Status-Anthony AffolderModule Testing Meeting, Dec. 11, 2003 Update of US Testing Status Anthony Affolder On behalf of the US testing group.
Slide 1Rod Production presented by Jim Lamb (UCSB)April 9, 2004 Rod Production Rod Production, April , presented by Jim Lamb (UCSB)
UCSB Encapsulation Studies UC Santa Barbara Based upon a 6 week study by F. Garberson in collaboration with A. Affolder, J. Incandela, S. Kyre and many.
US CMS Silicon Electronics Testing – CMS Lehman Review - May 21, Affolder1 US CMS Silicon Electronics Testing US CMS Lehman Review BNL 5/21/03 A.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
US CMS Silicon Tracker Project Joe Incandela University of California Santa Barbara US CMS Silicon Tracker Project Manager DOE/NSF Review of CMS Detector.
Slide 1Susanne KyreDOE review, January 20, 2004 Wirebonding for TOB and TEC Susanne Kyre University of California, Santa Barbara.
Status of TOB Modules & Rods J. Incandela For the US CMS Tracking Group Tracker Week, Feb
Slide 1 Electrical Testing at UCSB -Anthony AffolderDOE review, January 18, 2005 Electrical Testing at UCSB: Hybrids & Modules Anthony Affolder On behalf.
US Module Production June 2, 2005 J. Incandela For the US CMS Tracker Group.
US Tracker Project – CERN - July 17, Incandela 1 US Production Readiness CMS Tracker Week 17/06/03 CERN J. Incandela University of California Santa.
H.J.Simonis, CMS Collaboration, Novosibirsk Feb.08 Status of the Silicon Strip Detector at CMS INSTR08 Novosibirsk, Feb08 Hans Jürgen Simonis Universität.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
Silicon Inner Layer Sensor PRR, 8 August G. Ginther Update on the D0 Run IIb Silicon Upgrade for the Inner Layer Sensor PRR 8 August 03 George Ginther.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Guido_Tonelli / CMS_TSC / 5 February Time stability of ST sensors The problem The sensors re-measuring campaign Failure analysis Conclusions.
US CMS Silicon Tracker Project Regina Demina KSU Florida State University May 11, 2002.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Si Tracker Project - US CMS Meeting at Riverside – May 19, US CMS Tracker Outer Barrel (TOB) Silicon Project Tim Bolton (for Regina Demina)
Joe Incandela University of California Santa Barbara DOE Site Visit Jan 17, 2008 Joe Incandela University of California Santa Barbara DOE Site Visit Jan.
Commissioning and performance of the CMS silicon microstrip detector
2S module geometry updates Module positioning concepts
Status Brussels GANTRY
FNAL Production Experience
On behalf of the US TOB testing group
Silicon Strip Tracker MPR November 2004 CMS TRACKER COLLABORATION
Update of US Testing Status
Results from module testing
On behalf of the US TOB testing group
US Testing Mailing List
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
Module Production in Brussels
Electrical Testing at UCSB: Hybrids & Modules
Current Module LT Testing Capability
Electrical Testing at UCSB: Hybrids, Modules, & Rods
TOB Module Production Overview and Plan
Current Necessary for CMN Problem
Presentation transcript:

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 1 UCSB in CMS

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 2 CMS Experiment at CERN Most Ambitious Elements: EM Calorimetry & Tracking To a large extent, the Higgs drives the design of the LHC detectors. Nevertheless, other physics of interest require similar capabilities

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 3 The Physics Key point is that CMS will enter a new domain Definitive evidence of MSSM or rule it out Discover the Higgs or rule it out Or… Large Extra Dimensions, Black holes … Something unforeseen? Nothing new? No matter what we find, the implications will be profound The LHC is the Michelson-Morley experiment of the 21 st century

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 4 CMS Tracker 5.4 m End Caps (TEC 1&2) 2,4 m Inner Barrel & Disks (TIB & TID) Pixels Outer Barrel (TOB) volume 24.4 m 3 running temperature – 10 0 C 10 Million Si Strips! 26 Million Wire connections!

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 5 US Responsibility 5.4 m 2.4 m Outer Barrel (TOB) ~105 m 2 End Caps (TEC) 50% Modules for Rings 5, 6,7 and hybrid processing for Rings 2,5,6

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 6 Blue = double sided Red = single sided Strip lengths 10 cm (innermost) to 20 cm (outermost) Strip pitches 80  m (innermost) to 200  m (outermost) 500  m high resistivity 320  thick low resistivity Silicon Strips

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 7 Rods & Wheels 0.9 m 1.2 m

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 8 Components Overview Stockpiling Parts Now ↔ but with some caveats Sensors (500 mm thick) SGS Thomson (ST) ↔ Problems/production stopped/contract closed Hamamatsu (HPK) Excellent quality. Rate may be a problem Sensor Frames from Belgium/Pakistan: on track Problems over the past few years appear to all be worked out for now Hybrids from Cicorel/Hybrid SA/CERN ↔ critical path Several design flaws and processing quality issues uncovered. Technical problems solved ↔ delivery rate and stability an issue Rod Frames from Helsinki/CERN- stockpiling

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 9 August ‘03 UCSB finds problem with ST sensors December ‘03 (3 day sensor workshop at CERN) Re-probe ~1000 sensors in US and EU quality has degraded January-February ’04: Place orders with HPK for masks and prototypes STM order cut from 18,000 to 11,000. Place order with HPK for 7000 sensors May-July ’04: ST delivers 1000 sensors, CMS finds long-term instability in 5%. US builds 177 modules. Sees time evolution in 2 modules. Tracker week - July ’04: Evidence of corrosion from phosphorous in surface oxide. STM is not qualified. Autumn ’04: HPK orders increased to 16,000. December ’04: STM order closed Timeline of ST Sensor Issue 16 months of intense technical studies, and struggles…

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 10 CMN effect features: Few strips cause all 128 channels to show high noise Later: 2 nd chip develops CMN Situation as of early‘04 1. Common Mode Noise (CMN)

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 11 Strip 420 & 421 (4µA 15µA). Switching probe chuck vacuum on and off switches these strips on and off. Effect is reproducible. No visible defect seen. without vacuum with vacuum As of early‘04 2. Vacuum effect ↔ single strips !

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 12 OB2 sensors “It’s like no diode I’ve ever seen Gromit” - Wallace late ’03 early ’04 3. Peculiar IV Curves

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 13 As of early‘ Long term instability

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 14 Good sensor As of early‘04 5. Structure in leakage current

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 15 Corrosion Passivation (1 µm) Aluminum (2 µm) Triple oxide layer (1.5 µm) Aluminum corrosion As of July ’04 micro-corrosions of the aluminum surface: Humidity reacts with Phosphorus (present in a 4% concentration into the passivation oxide) and forms an acid (probably H 3 PO 4 ), that corrodes a superficial layer of Aluminum. Discovered by Strasbourg and Karlsruhe then confirmed by STM (this slide)

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 16 As of July ’04 Failure rate of qualification sensors in 72 h period is 5%  233 sensors tested 72h (room temperature, r.h.=25-30%) 7a. Long term sensor tests

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 17 7b. Long term TOB module tests sec Maxed out ADC Bits at this point nAAfter 7 hours, bias current started to increase New high noise channels seen in subsequent tests  Dark marks on bias ring occur near high noise channels

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 18 HPK Met with Yamamoto (VP) in Hamamatsu January 2004 US  CERN  place orders for masks Order 7000 sensors for delivery by end of 2004 Actually ~5600 delivered. Met with Yamamoto Oct. 11 at CERN : problems identified: (One month lost) Poly Silicon over-etching Scratches by handling devices Recently~75% yield but workers on strike… Will visit HPK again next month Negotiate for all 16,700 by Oct Options for few thousand

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 19 Current HPK schedule

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 20 Summer 2003 UCSB finds broken cable traces CERN finds problem is widespread, vendor says flaw is fatal Winter 2004 UCSB/FNAL find new failure mode in modules UCSB traces the problem to the hybrid CERN/Strasbourg/vendor: Vias not properly plated, with breaks occurring at unknown rate Autumn 2004: New Designs and processing - all trials are highly successful! Winter : New hybrid qualified and production started w/ rate problems US asked to secure new production Prof. D. Stuart has agreed to take on this project Timeline of Hybrid Issues

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 21 Cu Example of a good via Example of a bad via Bad Cables and Good Vias and Bad Vias Flex cable fragility

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 22 US CMS Tracker Group Brown University R. Hooper, G. Landsberg, C. Nguyen, H. Nguyen University of California, Riverside (UCR) P. Gartung, G. Hanson, G.Y. Jeng, G. Pasztor University of California, Santa Barbara (UCSB) A. Affolder, S. Burke, C. Campagnari, F. Garberson, D. Hale, J. Incandela, P. Kalavase, S. Kyre, J. Lamb, R. Taylor, D. Stuart, D. White + technicians University of Illinois, Chicago (UIC) E. Chabalina, C. Gerber, L. Nigra, T. Ten Fermilab (FNAL) M. Demarteau, A. Ronzhin, K. Sogut, L. Spiegel, S. Tkaczyk + technicians University of Kansas (KU) P. Baringer, A. Bean, L. Christofek, D. Coppage Mexican Consortium: Cinvestav: H. Castilla, R. Perez, A. Sanchez Puebla: E. Medel, H. Salazar San Luis Potosi: A. Morelos University of Rochester (UR) R.Demina, R. Eusebi, E. Halkiadakis, A. Hocker, S. Korjenevski, P. Tipton 20 joined group this past year – more needed at UCSB 10 left the group (includes KSU) 20 joined group this past year – more needed at UCSB 10 left the group (includes KSU)

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 23 US Preparations Good parts in large quantities are arriving Deliveries will not be smooth – hybrids especially – Andrea Allen of UCSB to go to CERN for 5-6 months as of February Meeting the schedule will require Higher than expected peak production rates Extremely robust and stable production lines Well trained personnel Previous module rate in US is 15/day/site Must be able to build faster Very few additions/changes in tooling and infrastructure - completed Extended day will be required Rates now possible: FNAL: 18/day sustainable and 21-24/d peak UCSB: 21/d sustainable and 27-30/d peak

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 24 PlanningOverview Commissioned a variety of studies Capacity expansion at FNAL and UCSB Many new ideas for gaining efficiency Failure modes Preparations to minimize downtime Manpower issues Focus in FNAL Brown University and Mexican consortium Focus 2005 – UCSB Hiring post-docs now – crucial to project startup in US and installation and commissioning at CERN Need technicians

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 25 UCSB TEC Production Miscellaneous info Have built all required types successfully: R5S, R5N, R6, R7 25 shipping boxes (20 modules each) built All carrier plates (~100 per type) and all wirebond fixtures complete Capacity We will need to saturate UCSB production capacity with TEC modules Split 60% - 40% TOB-TEC until TOB finished 100% TEC production last 3 months of schedule

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 26 Rods Rod assembly understood Single rod testing is under control Multi-rod Have had and resolved many problems with software and hardware Achieved major milestones Still have some problems to solve Need experience with many rods to determine if there are issues with components.

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 27 Mechanics:Tracker Outer Barrel 0.9 m Full Prototype Wheel (for MSGCs) Final Cylinders at CERN Rods before/after modules installed

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 28 S/N > 32 Test Beam Results

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 29 ORCA reconstruction of tracks

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 30 SST Schedule Completion: Jan An aggressive schedule

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 31 Management Project Management at CERN came under fire Delays have put CMS experiment at risk CERN Summit held Jan hours of meetings in 4 days Reviewed all project aspects Discussed project management Outcome New managerial structure New group leaders meeting New CERN tracker week schedule

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 32 Management Overview Proposed Tracker Management Structure Project ManagerGigi Rolandi Deputy Project ManagerGeoff Hall Tracker Construction ManagerPeter Sharp Resource ManagerRoberto Tenchini Project Board TIB/TIDTOBTECPixel Guido Tonelli Joe Incandela Didier Contardo Roland Horisberger TBC Duccio Abbaneo Stefan SchaelTBC Module Production Gian-Mario Bilei + TBCaaabbbcccddd Tracker Integration Ariella Cattai + ME + EEeeefffggghhh Electronics Integration Sandro Marchioro + Patrice Siegristiiijjjkkklll Software Integration Lucia Silvestris + TBCmmmnnnoooppp

ROD INTEGRATION Aachen Karlsruhe Strasbourg ZurichWien PETALS INTEGRATION Aachen Brussels Karlsruhe Louvain LyonStrasbourg Brussels Wien Lyon TECassembly TECassembly CERN Frames: Brussels Sensors: factories Hybrids: Strasbourg Pitch adapter: Brussels Hybrid: CF carrier TK ASSEMBLY At CERN Louvain Strasbourg Pisa PerugiaWien BariPerugia BariFirenzeTorinoPisaPadova TIB-TID INTEGRATION FNAL UCSB TOBassembly TIB-IDassembly At CERN PisaAachenKarlsruhe.--> Lyon Karlsruhe Pisa Sensor QAC Module assembly Bonding & testing Sub-assemblies FNAL US in the tracker Integration into mechanics RU FNAL UCSB

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 34 Tracker Weeks

UCSB CMS Group, DOE Site visit, Jan 18, 2005 J. Incandela 35 Summary Manpower needs to rise quickly Have studied all possible threats to production stability Purchased or manufactured spares Further increased capacity to ~50 modules/d Requires manpower (~ 4-5 FTE total) Systems All stages of production have been exercised and are near to final except rod testing Multi-rod stands rapidly converging UCSB Role in CMS has been extremely important