Highways 5/16/99 Intersection Realignment. Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client.

Slides:



Advertisements
Similar presentations
Cost Estimation System Tool
Advertisements

2014 STREET & UTILITY IMPROVEMENT PROJECT CITY COUNCIL MEETING November 18, 2013.
Transport.tamu.edu Parking Garage Feasibility Study TSAC December 5, 2012.
Preliminary Design of Galvez Estates Subdivision.
City Council Meeting Lisa A. Kuss City Administrator May 8, 2012.
S.R. 1 Intersection Improvement Project Wells County Public Library, Bluffton, IN 6:00 p.m. Presentation Thursday, April 24, 2014.
Facilities & Campus Planning North Pleasant Street Improvement Plan Faculty Senate – February 28, 2008.
South Side Red River Bridge Corridor Study Phase III Preliminary Geotechnical Study Phase IV New Alignment Alternatives Evaluation.
Environmental Assessment Public Meeting
TBG MKE West Waukesha Bypass Study Community Sensitive Solutions Advisory Group Meeting No. 5 January 31, 2011 Community Sensitive Solutions.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
S.R. 256 Road Reconstruction Project From City of Austin to S.R. 203 Thursday, February 6, 2014 Austin Elementary School 6:00 p.m.
Welcome to Pinal County. Greg Stanley Pinal County Public Works AACE Regional Conference Oct 1-3, 2008 The Three C’s of Hunt Highway.
Transportation Study for City of Bluffdale Porter Rockwell Boulevard is a planned, designed and partially built major arterial road that connects Mountain.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Laura Hemming – Project Manager Jan Dodd – Project Engineer Ty Gremaux – Report Editor/CAD Tech. Cory Howell – Project Engineer.
Bridge 2153 Final Report Premier Engineering Rose-Hulman Institute of Technology.
Final Presentation Minerva Engineering. Introduction  John Kats- Project Manager  Ryan Schipper- Project Editor  Matt Lash- Project Engineer/Client.
Three Point Consulting Hawthorn Park Enhancement Project 3 Consulting TT hree Poin.
Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.
Country Estates Final Report PARAGON. Project Team Mike Reeves – Project Manager Cole Marr – Project Engineer Bryce Beckstrom – Project Engineer Amanda.
Three Point Consulting Hawthorn Park Enhancement Project 3 Consulting TT hree Poin.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Crane Bridge Design STJ Engineering Matt Albert AJ Chandler Noah Fehrenbacher Jake Gennicks Jake Wilhoit Rose-Hulman Institute of Technology.
Safety Audit Components Safety assessment for risk Management.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Washington State Transportation Improvement Board U RBAN F UNDING P ROGRAMS 2012.
Environmental Assessment Public Information Meeting – September 2010 Realignment of a Portion of a Utah Lake Drainage Basin Water Delivery System (ULS)
US 1 COLLEGE PARK – SEGMENT 1 FROM COLLEGE AVE/REGENTS DRIVE TO MD 193 (UNIVERSITY BLVD) Presentation to College Park City Council August 5,
I-69 Team 3. Introduction History of project Proposed Route Challenges.
Presents Project Crimson March 1, 2006 Sarah Grace Cade Harrelson Cochrane Jamison Libby Probst Justin Williams.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
Team Tech meeting May 22, 2006 State Traffic Commission & DEP Storm Water Permitting State Traffic Commission Permitting & Storm Water Permitting State.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
1 Tower Road Project Update. 2 The Project Team requests the Alachua County Commission: Authorize staff to: Proceed with re-evaluating four (4) key issues.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Federal Highway Administration University Course on Bicycle and Pedestrian Transportation Lesson 13 (Some of these pictures show bicyclists not wearing.
Planning and Design in Rockford: West State Street Corridor Overview 315 North Main Street · Rockford IL
New Brighton Planning Commission Meeting March 21, 2006 Public Hearing: Special Use Permit (06-004) for a porch addition at th Avenue NW.
2012 ACEA MEETING ORANGE BEACH Brad Lindsey, P.E. Assistant State County Transportation Engineer – Pre Construction Alabama Department of Transportation.
Revisions to Chapter 2C – Warning Signs and Object Markers
Washington Thoroughfare Study Proposed Improvement of Washington Street Hainesville Road to Lake Street Lake County Hainesville Road Lake Street Washington.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
2003 Warranty Presentations Caltrans WARRANTED HMA PAVEMENTS PAVEMENTS.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
An Introduction to Contracts and Design Guides Presented by: David Lake, P.E. Roadway Designer Nevada Department of Transportation.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
1 MD 5 (Point Lookout Road) Leonardtown (Phase 1) Intersection Reconstruction At Abell and Moakley Streets Informational Meeting January 19, 2016.
Introduction CE331 Transportation Engineering Fall 2013 Dr. Reg Souleyrette.
MED SR 18 Corridor Project MED PID October 13, 2015.
Bancroft Elementary School School Building Committee Meeting February 24, 2010.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
MENTAL HEALTH CLINIC Siting Process and Analysis.
Pioneer Road Relocation and Reconstruction Project
City of Charlottesville
Jefferson County SA Red Rocks Site Approval
IA 122 RECONSTRUCTION PRE-BID MEETING
Construction Management & Inspection
Issaquah-Fall City Road
Site Plan Requirements
1200 West Widening and Reconstruction Project
Walker Street Reconstruction Project 25% Design Public Hearing
Competency: Create site plan drawings
Presentation transcript:

Highways 5/16/99 Intersection Realignment

Project Team Lindsey Thomann- Project Manager Jessica Young- Project Engineer Erik Dolmseth- Project Engineer/Client Liaison Julie Roebel- Project Engineer

Overview Project Description Design Requirements Project Approach Design Solution Conclusion

Project Description Client David Burrus, Naval Support Activity, Crane Division Located in Crane, Indiana

Project Description Legend: Highway 5 Highway 99 Highway 16 Railroad Building 36 Building 34 Proposed Parking Lot N

Design Requirements CLIENT REQUESTS Realign intersection to meet AASHTO requirements Propose ideas for a parking lot Create a storm water drainage plan Locate utilities and indicate whether they must be moved

Design Requirements CONSTRAINTS Railroads and buildings remain in place Parking lot must be 25 meters away from buildings Meet or exceed INDOT and AASHTO

Project Approach Codes & Regulations Preliminary Feasibility Study Utility Investigation Traffic Study Photographic Study Topographical Investigation Realignment Design Options Assessment of Options

Codes and Regulations AASHTO INDOT FHWA MUTCD IDEM EPA

Preliminary Feasibility Study Zoning Investigation Site Characteristics and Soil Study Streams, Floodplains, and Wetlands Study Recommendation to Proceed

Utility Investigation Water Main Gas Main Overhead Power Lines Legend: Relocation Electric Poles -$26,000 Telephone/Optic -$18,500 Gas -$10,000 Remain in Place Water Sanitary Sewer

Traffic Study Traffic Count from 5:55 a.m. – 6:10 a.m. N

Photographic Study

Topographical Investigation N

Option 3: Relocate Both Highways 16 and 99 Design Options Option 1: Relocate Highway 16 Eastward Legend : Project Area Highway 5 Highway 99 Highway 16 Option 2: Relocate Highway 99 Westward Option 4: Create a Roundabout Option 5: Relocate Highway 16 East of Overhead Power Lines N

Assessment of Options Decision Matrix Criteria Safety Cost Clearance time Driver comfort Recommendations Based on results of matrix

Assessment of Design Options Explanation of Safety Analysis Ratings Point Value Safety 1High Accident Severity 2Moderate Accident Severity 3Low Accident Severity Point Value Initial Cost 1>$90,000 2$80,000-$90,000 3<$80,000 Explanation of Initial Cost Analysis Ratings Explanation of Clearance Time Analysis Ratings Point Value Clearance Time 1> 30 seconds seconds 3< 10 seconds Explanation of Driver Comfort Analysis Ratings Point Value Driver Comfort 1Angled Approach 2Orthogonal Approach 3Merge with Traffic

Assessment of Design Options Realignment Design Options Safety (35%) Initial Cost (30%) Clearance Time (20%) Driver Comfort (15%) Weighted Average Rank Relocate Highway 16 Eastward Relocate Highway 99 Westward Relocate Both Highways 16 and Create a Round- About Relocate Highway 16 East of Overhead Power Lines

Final Design Option 5: Relocate Highway 16 East of Overhead Power Lines Legend : Project Area Highway 5 Highway 99 Highway 16 N

Pavement Design Estimated 219,000 trucks over 10 year period 2% increase per year The Asphalt Institute Thickness Design ESAL = 519, 700 Mr = 9300 psi

Pavement Design 5 i n. 6 i n.

HMA Design 12 foot Driving Lanes Sloped Shoulder 3 in. thick HMA Surface 4.5 in. thick Intermediate Course 8 in. thick Aggregate Base Existing Soils Legend:

Parking Lot HW Parking Spaces 5 Handicapped Spaces

Parking Lot 56 Parking Spaces 7 Parking Spaces 5 Handicapped Spaces

Parking Lot 56 Parking Spaces 7 Parking Spaces 5 Handicapped Spaces

Traffic Control Plan Legend: Phase 1: Newly Aligned HW16 Access to Battery Storage Facility Access to Buildings and Northern HW 16 N

Traffic Control Plan Legend: Phase 2: North Access Road Access to Battery Storage Facility Access to Buildings and Northern HW 16 N Road Block

Traffic Control Plan Legend: Phase 3: South Access Road Access to Battery Storage Facility Access to Buildings and Northern HW 16 N Road Block

Stormwater Runoff Plan Performed Full Hydraulic Analysis Existing Drainage Swales Adequate Redesigned Drainage Culverts Under Hwy 16 Upgraded from 18” to 30” and 15” to 18 ”

Cost Estimate Item DescriptionCost Mobilization/Demolition$36,000 Excavation/Pavement$204,000 Signage/Markings$2,600 Drainage/Runoff Control$10,000 Overhead and Profit$25,000

Plans New Corridor Corridor Stationing Profile View Cross-Sections

Roundabout Design Highway 16 Highway 5 Highway 99 N

Summary Client Requests Design Options Final Design Option 5: Relocate Highway 16 East of Overhead Power Lines Legend : Project Area Highway 5 Highway 99 Highway 16 Original locations of roadways are shown in white New Access Roads N

Questions? N